In the typical data centre, a significant proportion combined with exceptional efficiency as high as MINIMISED SERVICE S O F T W A R E T E C H N O LO GY
of power entering the building is lost on power 98%* and even higher efficiencies in ECO mode. The Piller CPM has a very low-level maintenance A fully controllable and highly responsive power
conditioning, cooling and distribution before regime compared with other systems. There stage and energy store allows operation of the
Efficiency improvements run throughout this
it reaches the IT load. These losses become are no battery inspections or autonomy tests to CPM to be optimised by algorithm according to
design, however by integrating the energy store
compounded and have a major effect on perform and major maintenance intervals are pre-selection or auto-sensing. Further enhance-
and utilising innovative cooling techniques, the
financial performance: Reducing UPS losses much longer than for most other systems. No ment of low load efficiency is possible in multi-
CPM benefits from wide environmental operating
delivers a wider impact on overall losses. substantial work is necessary within the first 10 module systems by use of Enhanced Redundancy
characteristics that allow the elimination of air
years of service. Mode (ERM) which optimises the number
Construction and infrastructure costs are a conditioning used in conventional battery systems.
of units running whilst maintaining required
significant part of the funding cycle for new For cooling of the unit itself, the designer can
I N N O VAT I V E C O O L I N G redundancy levels.
data centres and the more complex the building choose between white space installation where
Key elements of the CPM system are cooled by a
project, the longer the construction time further use of the IT cooling system can be made and
self-contained heat exchange system that removes COMMUNICATIONS AND MONITORING
adding to the capital burden. traditional plant room installation.
heat at the component surface more efficiently In addition to all of the latest communication
A product that can positively address both and effectively than conventional air cooling. protocols and interfaces you might expect from
SPACE SAVING
capital and operating expenditure for a data Piller, the CPM comes complete with the option
By replacing batteries with an integrated energy
centre will make a significant difference to the MODULAR/SCALABLE to install an Android or iOS App that gives
store, up to 75% of the space normally taken
total cost of ownership. CPM units can be configured in a variety of authorised personnel an immediate and mobile
up can be saved. Additional building space for
different ways even within the same data centre status report for any CPM system anywhere in
battery air conditioning, switchgear and cabling
E N E R GY S AV I N G and systems of units can be extended to meet the world.**
is also eliminated.
The CPM concept brings together a highly efficient the increase in data centre loads with time. Scaling
and reliable energy store with a five mode The units can be mounted with power distribution up the CPM system is more straightforward
uninterruptible power system. There are two units on pre-assembled skids for rapid deployment than a solution with batteries and requires little
principle modes providing real power protection with minimal on-site commissioning and testing. in the way of site preparation.
~ VI Conditioning Path
~
~ =
= ~
K E Y DATA LOAD
O P E R AT I N G M O D E S
Voltage 380V-480V Mains Generator Frequency Voltage Suppression = VFI Conditioning Path
piller.com
Piller CPM 300 (GB) 06 2016/Issue 1. Due to a policy of continued improvement, we reserve the right to change any specification without prior notice. ERRORS & OMISSIONS EXCEPTED.