PBRS credit confirmation check list DECEMB ER 2015 2014 Consulting Engineering Office CEO All Rights Reserved. Copyright in the whole and every part of this document belongs to Consulting Engineering Office CEO and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person without the prior writtenconsent of Consulting Engineering Office CEO.
IDP-R1: Integrated Development Strategy 1
ESTIDAMA PBRS - 2 PEARL
Table of Contents
1 Statement of compliance with Estidama ................................................................................................... 3
2 PQP of the project....................................................................................................................................................... 4
IDP-R1: Integrated Development Strategy 2
ESTIDAMA PBRS - 2 PEARL
1 Statement of compliance with Estidama
Pearl Building Rating System -1 Pearl
Credit Credit Points
Credit Title Design Reference Available IDP Integrated Development Process