INTRODUCTION
LOAD CALCUATION
1. DEAD LOAD
Weight of the AC sheet: 170 N/mm2
Weight of the Purlin: 100N/mm2
Total dead load: 270 N/mm2
Spacing of purlin: 1.45m
Total load: Spacing of purlin*Dead load
=270*1.45
=391.5N/mm
Total weight of the purlin: 100*1.45
=145N/mm
Weight of roofing material: 170*1.45
= 246.5 N/mm
Weight of roof truss: 103.33kN/m2
= 4006.58kN
Brays: 12N/m2
= 12*38.77
= 465.28N
Total Dead Load = 14943.64N
Dead Load on one principal plane: 14943.64/3
= 4.981kN
2. LIVE LOAD
= (7.5-.2(0.1))
=514N/mm2
3. WIND LOAD
= 1.45kN/m2
e
=0.7 4
3 d0
p
25=0.65
3 d0
f ub
=0.975
fu
Hence, kb : 0.65 for each case.
Principal Rafter and Main Tie Connection:
As the bolt is in double shear,
Assuming section to be large and thickness more than 4mm and angle is double, so strength is
governed by gusset.
Now, bearing strength of bolt is given as,
V B =2 k b dt
V B =20.65168
VB = 68.22kN
As min of Shearing and Bearing strength is to be considered,
V = 58kN
Now, No of bolts required,
In Principal Rafter: 126/58
= 2.17 3 bolts
In Main Tie: 112/58
= 1.93 2 bolts
= 532.4mm2 (2ISA)
For section ISA Ag = 266.2mm2
Based on area, take ISA 65456,
Ag = 6.25cm2
Total Ag = 12.5cm2
Check for yielding strength,
Ag f y
T dg=
m0