132KV LINE CONTROL & PROTECTION PANEL
WITH LINE DIFFERENTIAL PROTECTION

LIST OF DOCUMENTS
B DRAWING DESCRIPTION. REVISION DATE ISSUE B
IN-8023274-GL-01 GENERAL ARRANGEMENT & LEGEND A 23-02-2017 FOR APPROVAL
IN-8023274-S-01 SCHEMATIC DRAWINGS A 23-02-2017 FOR APPROVAL
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

THIS TYPICAL DRAWING IS APPLICABLE FOR THE FOLLOWING CIRCUITS


SL.NO CIRCUITS GA REF SCHEMATIC REF PANEL TYPE
C C
KM PALLY S/S
1 132KV LINE CONTROL & PROTECTION PANEL WITH LINE DIFFERENTIAL PROTECTION IN-8023274-GL-01 IN-8023274-S-01 +1L3
KAMAREDDY S/S
2 132KV LINE CONTROL & PROTECTION PANEL WITH LINE DIFFERENTIAL PROTECTION IN-8023194-GL-01 IN-8023194-S-01 +1L3

D D

LIST REFERENCE DOCUMENTS:

Sl.NO EQUIPMENT DRAWING NUMBER

1 SLD SWLD-SKYP2-57.5MWp-TL-E-DWG-M&PSLD-01, REV-R2

2 132kV CB CG-145GO-SCH/CG-145GO-WIR, REV-R0


PANEL TYPES : +1L3
132kV ISOLATOR/
3 SWLD-SKYP3-57.5MWp-TL-E-GTP-SWG-ISO-01, REV-2
EARTH SWITCH
E E
4
CONTROL ROOM
SWLD-SKYP1-57.5MWp-TL-E-DWG-MCREL-01, REV-R2 CUSTOMER: TELANGANA STATE TRANS. CORP. LTD.
LAYOUT
5 CT 413887659 CT6 RS, REV-R0

6 PT SWLD-SKYP3-57.5MWp-TL-E-GTP-SWG-VT-01, REV-R2
CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI.
7 CT JB NOT AVAILABLE
CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD.
8 PT JB NOT AVAILABLE

9 PLCC NOT AVAILABLE PROJECT: DEVELOPMENT OF 50 MW SOLAR POWER PLANT


F F
AT SERIPALLE (KM PALLY) TELANGANA (INDIA)
Schneider Electric Infrastructure Ltd
CHENNAI , INDIA PO.No. & Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

A A

SHEET DESCRIPTION
00 TOP SHEET
000 INDEX SHEET
001 GENERAL ARRANGEMENT
B B
002 BILL OF MATERIALS CONTROL PANEL
003 BILL OF MATERIALS CONTROL PANEL
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

004 BILL OF MATERIALS CONTROL PANEL


005 BILL OF MATERIALS CONTROL PANEL
006 BILL OF MATERIALS CONTROL PANEL
007 BILL OF MATERIALS CONTROL PANEL

C C

D D

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 000 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. INDEX SHEET REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 001
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-GL-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

800

A +1L3 A

CL
45 THIS TYPICAL DRAWING IS APPLICABLE FOR THE FOLLOWING CIRCUIT(S):
LIU-B1 S.NO CIRCUITS PANEL REF SUBSTATION
EFS-B1 132KV LINE CONTROL & PROTECTION PANEL WITH
1 +1L3 KAMAREDDY S/S
LINE DIFFERENTIAL PROTECTION
40
195 295 80AC 80DC
52XC

B B
RX 85X COX 52XT

35
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

BCPU
(C264P)

30

86 96 21X

C C
25 52CS CSS
2200
2315

20 87L
(P543)
SEPA 60TE 014

15
D D

10 TVM

5
TTB BLKC

E E

BLKA BLKB

ANTIVIBRATION PAD
100

15

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 001 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) GENERAL ARRANGEMENT
APPROVED : RVN CONT: 002
FRONT VIEW
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
DRG. NO.: IN-8023274-GL-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
BILL OF MATERIALS FOR FRONT VIEW EQUIPMENTS
Version 1.0

DESIGNATION MANUFACTURER MATERIAL DESCRIPTION


` COMMENT

AUX VOTL:110-250Vdc / 100-240Vac, INOM:1A/5A, VNOM:100-120V AC, OPTO I/P: 16, O/P CONTACT: 14, WITH DISTANCE,
87L SCHNEIDER ELECTRIC P543 LINE DIFFERENTIAL RELAY
PROTOCOL: IEC61850 OVER ETHERNET, CASE: 60TE, MOUNTING: PANEL
A A

52CS SWITRON GBSS3NLSLAPAW00 CB CONTROL SWITCH 10 WAY NON-LOCK SPRING RETURN WITH LOST MOTION DEVICE CB "TRIP-NEUTRAL-CLOSE"

CONTACT MULTIPLICATION RELAY, 4 C/O, SELF RESET CONTACTS WITH HAND RESET FLAG, 220V DC (+10-20% OF
52XC SCHNEIDER ELECTRIC GBINSERAAS4F220 CB CLOSE
UN) ,FLUSH MOUNTING.

CONTACT MULTIPLICATION RELAY, 4 C/O, SELF RESET CONTACTS WITH HAND RESET FLAG, 220V DC (+10-20% OF
52XT SCHNEIDER ELECTRIC GBINSERAAS4F220 CB TRIP
UN) ,FLUSH MOUNTING.

AC SUPERVISION RELAY,4 C/O, SELF RESET CONTACTS WITH WITH LED INDICATION, 230V AC (+10-20% OF UN)
80AC SCHNEIDER ELECTRIC GBINSEVD2X230 AC SUPERVISION RELAY
,DROP OUT TIME: >200MS, FLUSH MOUNTING.
B B
DC SUPERVISION RELAY,4 C/O, SELF RESET CONTACTS WITH LED INDICATION, 220V DC (+10-20% OF UN) , DROP
80DC SCHNEIDER ELECTRIC GBINSEVD1X220 DC SUPERVISION RELAY
OUT TIME: >200MS, FLUSH MOUNTING.
CONTACT MULTIPLICATION RELAY, 4 C/O, SELF RESET CONTACTS WITH HAND RESET FLAG, 220V DC (+10-20% OF UN)
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

85X SCHNEIDER ELECTRIC GBINSERAAS4F220 ,FLUSH MOUNTING. CARRIER RECIVE MULTI.RELAY

CONTACT MULTIPLICATION RELAY, 4 C/O, SELF RESET CONTACTS WITH HAND RESET FLAG, 220V DC (+10-20% OF
RX SCHNEIDER ELECTRIC GBINSERAAS4F220 CARRIER RECEIVE MULTI.RELAY
UN) ,FLUSH MOUNTING.

ELECTRICAL & HAND RESET TRIP RELAY, 8 C/O, ELECTRICAL & HAND RESET CONTACTS WITH FOLLOWING FLAG,
86 SCHNEIDER ELECTRIC GBINSEBAXBH8220 MASTER TRIP RELAY
220V DC (+10-20% OF UN) , FLUSH MOUNTING-HIGH SPEED.
C C
ELECTRICAL & HAND RESET TRIP RELAY, 8 C/O, ELECTRICAL & HAND RESET CONTACTS WITH FOLLOWING FLAG,
96 SCHNEIDER ELECTRIC GBINSEBAXBH8220 LBB TRIP RELAY
220V DC (+10-20% OF UN) , FLUSH MOUNTING-HIGH SPEED.

SELF RESET TRIP RELAY, 8 C/O, SELF RESET CONTACTS WITH HAND RESET FLAG, 220V DC (+10-20% OF
21X SCHNEIDER ELECTRIC GBINSERAXSH8220 SINGLE PHASE TRIP RELAY
UN),FLUSH MOUNTING.

TRIP CIRCUIT SUPERVISION RELAY,2 C/O, SELF RESET CONTACTS WITH LED INDICATION, 220V DC (+10-20% OF
195 SCHNEIDER ELECTRIC GBINSEVD3X220 CB TC-1 SUPERVISION
UN) ,DROP OUT TIME: >200MS, FLUSH MOUNTING.

TRIP CIRCUIT SUPERVISION RELAY,2 C/O, SELF RESET CONTACTS WITH LED INDICATION, 220V DC (+10-20% OF
295 SCHNEIDER ELECTRIC GBINSEVD3X220 CB TC-2 SUPERVISION
UN) ,DROP OUT TIME: >200MS, FLUSH MOUNTING.

D BAY CONTROL UNIT WITH CT/VT MODULE, AUX VOLT: 220V DC, DIGITAL INPUT MODULE: 5, DIGITAL OUTPUT D
BCPU SCHNEIDER ELECTRIC C264P BCPU
MODULE: 3, PROTOCOL: IEC61850, CASE: 80TE

BLKA ALSTOM GBMPGTESTBLOCK STANDARD TEST BLOCK FOR DIST. PROTN.

BLKB ALSTOM GBMPGTESTBLOCK STANDARD TEST BLOCK FOR DIST. PROTN.

BLKC ALSTOM GBMPGFQ0001-007 STANDARD TEST BLOCK- BCPU FOR BCPU

CONTACT MULTIPLICATION RELAY, 4 C/O, SELF RESET CONTACTS WITH HAND RESET FLAG, 220V DC (+10-20% OF
E COX SCHNEIDER ELECTRIC GBINSERAAS4F220 UN) ,FLUSH MOUNTING. CARRIER FAIL MULTI.RELAY
E

CSS SWITRON GBSS2NLSPBP8W00 SELECTOR SWITCH 8 WAYS,2 POSITION,STAYPUT,NON LOCKABLE WITH PISTOL GRIP HANDLE "CARRIER CH-1" IN-OUT

TTB DAV GBCTB4000002 TEST TERMINAL BLOCK TTB

TVM METER, WITH ABT,MODEL: PREMIER 300 PROJECTION MOUNTING, 3PH 3ELEMENT 4 WIRE, CL: 0.2S, CTR: 600-
TVM SECURE - TVM
300/1A, PTR: 132KV/110V, MDI: 15MIN, COMM: MODBUS VIA RS485,AMRI COMPATIBLE,WITH FRONT OPTICAL PORT

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 002 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BILL OF MATERIALS CONTROL PANEL REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 003
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-GL-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
BILL OF MATERIALS FOR FRONT VIEW EQUIPMENTS
Version 1.0

DESIGNATION MANUFACTURER MATERIAL DESCRIPTION


` COMMENT

EFS-B1 HIRSCHMANN GBHIE6FX6TX220D85 ETHERNET SWITCH 6FX+6TX DUAL POWER SUPPLY, AUX SUPPLY : 220V DC, MOUNTING: RACK, MODEL : MACH-1120 EFS
A A

LIU-B1 PRESTON GB54140000000000 12 PORT LIU WITH ST COUPLERS-RACK MOUNTED LIU

B B
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

C C

D D

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 003 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BILL OF MATERIALS CONTROL PANEL REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 004
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-GL-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

BILL OF MATERIALS FOR REAR VIEW EQUIPMENTS

DESIGNATION MANUFACTURER MATERIAL DESCRIPTION


` COMMENT
A A
CIL PHILIPS GB20522011068025 COMPACT FLOURESCENT LAMP - 11W 240V AC LAMP

DS KAYCEE GB20424005100011 DOOR SWITCH DOOR SWITCH

HS SWITRON GB25317014000000 HEATER SWITCH HEATER SWITCH

HT APT CONTROLS GB2072305APT00001 HEATER 240V AC 50HZ, 60W HEATER

B B
PS ANCHOR GBPS515A230VAC POWER SOCKET 5/16A WITH SWITCH + 3PIN PLUG, 240V AC POWER SOCKET
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

TH APT CONTROLS GBCPE0000612 THERMOSTAT 240V AC, 30-90 DEG THERMOSTAT

86AT SCHNEIDER ELECTRIC GBRXM4AB1MD+GBRXZE2S114M AUXILIARY RELAY, AUX. CONTACT: 4(C/O), AUX. SUPPLY: 220V DC SPARE RELAY

86BT SCHNEIDER ELECTRIC GBRXM4AB1MD+GBRXZE2S114M AUXILIARY RELAY, AUX. CONTACT: 4(C/O), AUX. SUPPLY: 220V DC SPARE RELAY

C 195X SCHNEIDER ELECTRIC GBRXM4AB1MD+GBRXZE2S114M AUXILIARY RELAY, AUX. CONTACT: 4(C/O), AUX. SUPPLY: 220V DC 195R CON. MULT. RELAY C

295X SCHNEIDER ELECTRIC GBRXM4AB1MD+GBRXZE2S114M AUXILIARY RELAY, AUX. CONTACT: 4(C/O), AUX. SUPPLY: 220V DC 295R CON. MULT. RELAY

R86 STEAD GB40422330001350 RESISTOR, 3.3K-OHMS, 35W

R96 STEAD GB40422330001350 RESISTOR, 3.3K-OHMS, 35W

D 89A-O SCHNEIDER ELECTRIC GBRXM4AB1MD+GBRXZE2S114M AUXILIARY RELAY, AUX. CONTACT: 4(C/O), AUX. SUPPLY: 220V DC ISO. CONT. MUL. RELAY D

89A-C SCHNEIDER ELECTRIC GBRXM4AB1MD+GBRXZE2S114M AUXILIARY RELAY, AUX. CONTACT: 4(C/O), AUX. SUPPLY: 220V DC ISO. CONT. MUL. RELAY

89L-C SCHNEIDER ELECTRIC GBRXM4AB1MD+GBRXZE2S114M AUXILIARY RELAY, AUX. CONTACT: 4(C/O), AUX. SUPPLY: 220V DC ISO. CONT. MUL. RELAY

89L-O SCHNEIDER ELECTRIC GBRXM4AB1MD+GBRXZE2S114M AUXILIARY RELAY, AUX. CONTACT: 4(C/O), AUX. SUPPLY: 220V DC ISO. CONT. MUL. RELAY

189-O SCHNEIDER ELECTRIC GBRXM4AB1MD+GBRXZE2S114M AUXILIARY RELAY, AUX. CONTACT: 4(C/O), AUX. SUPPLY: 220V DC ISO. CONT. MUL. RELAY
E E

189-C SCHNEIDER ELECTRIC GBRXM4AB1MD+GBRXZE2S114M AUXILIARY RELAY, AUX. CONTACT: 4(C/O), AUX. SUPPLY: 220V DC ISO. CONT. MUL. RELAY

E1 STS/COOPER BUSSMANN GB251E0002500000 LINK

E2 STS/COOPER BUSSMANN GB251E0002500000 LINK

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 004 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BILL OF MATERIALS CONTROL PANEL REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 005
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-GL-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

BILL OF MATERIALS FOR REAR VIEW EQUIPMENTS

DESIGNATION MANUFACTURER MATERIAL DESCRIPTION


` COMMENT
A A
E3 STS/COOPER BUSSMANN GB251E0002500000 LINK

E4 STS/COOPER BUSSMANN GB251E0002500000 LINK LINE CVT WDG1 CKT

E5 STS/COOPER BUSSMANN GB251E0002500000 LINK LINE CVT WDG2 CKT

FS211 STS/COOPER BUSSMANN GB25134000230008 FUSE - 4A, AC

B B
FS217 STS/COOPER BUSSMANN GB25134000230008 FUSE - 4A, AC
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

FS231 STS/COOPER BUSSMANN GB25134000230008 FUSE - 4A, AC

FS237 STS/COOPER BUSSMANN GB25134000230008 FUSE - 4A, AC

FS251 STS/COOPER BUSSMANN GB25134000230008 FUSE - 4A, AC

C FS257 STS/COOPER BUSSMANN GB25134000230008 FUSE - 4A, AC C

FS111 STS/COOPER BUSSMANN GB25134000230008 FUSE - 4A, AC

FS131 STS/COOPER BUSSMANN GB25134000230008 FUSE - 4A, AC

FS151 STS/COOPER BUSSMANN GB25134000230008 FUSE - 4A, AC

D FS317 STS/COOPER BUSSMANN GB25134000230008 FUSE - 4A, AC D

FS337 STS/COOPER BUSSMANN GB25134000230008 FUSE - 4A, AC

LK1 STS/COOPER BUSSMANN GB25150032320014 LINK

LK2 STS/COOPER BUSSMANN GB25150032320014 LINK

LK3 STS/COOPER BUSSMANN GB25150032320014 LINK


E E

LK4 STS/COOPER BUSSMANN GB25150032320014 LINK

LK5 STS/COOPER BUSSMANN GB25150032320014 LINK

LK6 STS/COOPER BUSSMANN GB25150032320014 LINK

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 005 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BILL OF MATERIALS CONTROL PANEL REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 006
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-GL-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

BILL OF MATERIALS FOR REAR VIEW EQUIPMENTS

DESIGNATION MANUFACTURER MATERIAL DESCRIPTION


` COMMENT
A A
LK271 STS/COOPER BUSSMANN GB25150032320014 LINK

LK277 STS/COOPER BUSSMANN GB25150032320014 LINK

LK171 STS/COOPER BUSSMANN GB25150032320014 LINK

MCB1 SCHNEIDER ELECTRIC A9N61531 + A9N26924 DOUBLE POLE MCB WITH AUX CONTACT: 1 C/O, 500V DC, 16A

B B
MCB2 SCHNEIDER ELECTRIC A9N61526 + A9N26924 DOUBLE POLE MCB WITH AUX CONTACT: 1 C/O, 500V DC, 6A
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

MCB3 SCHNEIDER ELECTRIC A9N61526 + A9N26924 DOUBLE POLE MCB WITH AUX CONTACT: 1 C/O, 500V DC, 6A

MCB4 SCHNEIDER ELECTRIC A9N61528 + A9N26924 DOUBLE POLE MCB WITH AUX CONTACT: 1 C/O, 500V DC, 10A

MCB5 SCHNEIDER ELECTRIC A9N61528 + A9N26924 DOUBLE POLE MCB WITH AUX CONTACT: 1 C/O, 500V DC, 10A

C MCB6 SCHNEIDER ELECTRIC A9N61528 + A9N26924 DOUBLE POLE MCB WITH AUX CONTACT: 1 C/O, 500V DC, 10A C

FOR ISOLATOR I/L & AUX. RELAY


MCB7 SCHNEIDER ELECTRIC A9N61526 + A9N26924 DOUBLE POLE MCB WITH AUX CONTACT: 1 C/O, 500V DC, 6A
CKT.

MCB8 SCHNEIDER ELECTRIC A9N61526 + A9N26924 DOUBLE POLE MCB WITH AUX CONTACT: 1 C/O, 500V DC, 6A FOR MASTER TRIP RELAY CKT.

MCB9 SCHNEIDER ELECTRIC A9N61524 + A9N26924 DOUBLE POLE MCB WITH AUX CONTACT: 1 C/O, 500V DC, 4A FOR EFS

D MCB10 SCHNEIDER ELECTRIC A9N61526 + A9N26924 DOUBLE POLE MCB WITH AUX CONTACT: 1 C/O, 500V DC, 6A FOR LBB TRIP RELAY CKT. D

MCB11 SCHNEIDER ELECTRIC A9N61524 + A9N26924 DOUBLE POLE MCB WITH AUX CONTACT: 1 C/O, 500V DC, 4A FOR EFS

MCB91 SCHNEIDER ELECTRIC A9N2P16C + A9N26924 DOUBLE POLE MCB WITH AUX CONTACT: 1 C/O, 415V AC, 16A FOR 230V AC SUPPLY

X1 CONNECTWELL / ELMEX CMDT4 / CLTDM4 DISCONNECTING TERMINAL

X2 CONNECTWELL / ELMEX CMDT4 / CLTDM4 DISCONNECTING TERMINAL


E E

X3 CONNECTWELL / ELMEX CMDT4 / CLTDM4 DISCONNECTING TERMINAL

X4 CONNECTWELL / ELMEX CSTSB4/N4 / CATM4 NON-DISCONNECTING TERMINAL

X5 CONNECTWELL / ELMEX CSTSB4/N4 / CATM4 NON-DISCONNECTING TERMINAL

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 006 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BILL OF MATERIALS CONTROL PANEL REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 007
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-GL-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

BILL OF MATERIALS FOR REAR VIEW EQUIPMENTS

DESIGNATION MANUFACTURER MATERIAL DESCRIPTION


` COMMENT
A A
X6 CONNECTWELL / ELMEX CSTSB4/N4 / CATM4 NON-DISCONNECTING TERMINAL

X7 CONNECTWELL / ELMEX CSTSB4/N4 / CATM4 NON-DISCONNECTING TERMINAL

X200 CONNECTWELL / ELMEX CMDT4 / CLTDM4 DISCONNECTING TERMINAL

X201 CONNECTWELL / ELMEX CSTSB4/N4 / CATM4 NON-DISCONNECTING TERMINAL

B B
X-BCPU-DIU-L CONNECTWELL / ELMEX CKT4U / KULTD4 DISCONNECTING TERMINAL
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

X-BCPU-DIU-M CONNECTWELL / ELMEX CKT4U / KULTD4 DISCONNECTING TERMINAL

X-BCPU-DIU-N CONNECTWELL / ELMEX CKT4U / KULTD4 DISCONNECTING TERMINAL

X-BCPU-DIU-O CONNECTWELL / ELMEX CKT4U / KULTD4 DISCONNECTING TERMINAL

C X-BCPU-DIU-P CONNECTWELL / ELMEX CKT4U / KULTD4 DISCONNECTING TERMINAL C

X-BCPU-DOU-D CONNECTWELL / ELMEX CKT4U / KULTD4 DISCONNECTING TERMINAL

X-BCPU-DOU-E CONNECTWELL / ELMEX CKT4U / KULTD4 DISCONNECTING TERMINAL

X-BCPU-DOU-F CONNECTWELL / ELMEX CKT4U / KULTD4 DISCONNECTING TERMINAL

D X-BCPU-PS-A CONNECTWELL / ELMEX CF4UL / KUDF4 DISCONNECTING TERMINAL D

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 007 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BILL OF MATERIALS CONTROL PANEL REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: NIL
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-GL-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

SHEET DESCRIPTION SHEET DESCRIPTION

A 000 INDEX SHEET 039 BCPU-INPUT CARD A


001 LIST OF SYMBOLS 040 BCPU-INPUT CARD
002 SLD & TRIP LOGIC 041 BCPU-INPUT CARD
003 TRIP LOGIC 042 BCPU-OUTPUT CARD
004 AC DISTRIBUTION 043 BCPU-OUTPUT CARD
005 DC DISTRIBUTION 044 BCPU-OUTPUT CARD
006 DC DISTRIBUTION CKT. 045 CONTACT DISTRIBUTION
007 CVT DISTRIBUTION CKT. 046 SPARE CONTACTS DISTRIBUTION
008 CT DISTRIBUTION CKT. 047 SWITCH CONTACT DISTRIBUTION
B B
009 CT DISTRIBUTION CKT. 048 TEST BLOCK DISTRIBUTION
010 METERING CKT. 049 BCPU INTERLOCK LOGICS
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

011 DIFF. PROTN.-CT CKT. 050 BCPU INTERLOCK LOGICS


012 DIFF. PROTN.-VT CKT. 051 BCPU INTERLOCK LOGICS
013 DIFF. PROTN.-OPTO INPUT CKT. 052 TERMINAL BLOCK DISTRIBUTION
014 DIFF. PROTN.-OPTO INPUT CKT. 053 TERMINAL BLOCK DISTRIBUTION
015 DIFF.RELAY DEVICE REFERENCE 054 TERMINAL BLOCK DISTRIBUTION
016 87L RELAY I/O DETAILS 055 TERMINAL BLOCK DISTRIBUTION
C 017 CARRIER RECEIVE AND SEND CKT. C

018 DIRECT TRIP SEND CIRCUIT


019 SINGLE PHASE TRIP RELAY CKT
020 TRIP RELAY-86 CKT.
021 LBB TRIP RELAY 96 CKT.
022 CB CLOSING CKT.
023 CB CLOSING & TC-1 CKT.
024 CB TC-2 CKT.
D 025 TRIP COIL CON. MUL. CKT. D
026 ISOLATOR CONTROL CKT.
027 ISOLATOR CONTROL CKT.
028 AUXILIARY RELAY CKT.
029 BCPU CARD DETAILS
030 BCPU POWER SUPPLY UNIT
031 BCPU CT & PT CKT.
032 BCPU-INPUT CARD

E 033 BCPU-INPUT CARD E


034 BCPU-INPUT CARD
035 BCPU-INPUT CARD
036 BCPU-INPUT CARD
037 BCPU-INPUT CARD
038 BCPU-INPUT CARD

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 000 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. INDEX SHEET REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 001
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

LIST OF STANDARD SYMBOLS TERMINAL GROUP STANDARDS


SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION
A TB REF FUNCTION A

COMPACT NORMALLY X1 AC/DC CIRCUITS

+
FLOURESCENT PUSH BUTTON OPEN CONTACT CIRCUIT X2 CT CIRCUITS
LAMP NO CONTACT SELF RESET BREAKER
POWER SUPPLY X3 PT CIRCUITS
NORMALLY X4 CONTROL INPUTS (TO OPTO/CONT MUL. RELAY)
DOOR/HEATER PUSH BUTTON CLOSE
SWITCH NC CONTACT CONTACT SELF
- X5 CONTROL OUTPUTS (TO CB CONTROL)
RESET M X6 CONTROL OUTPUTS (TO ISOL./ESW. CONTROL)
CHANGEOVER X7 SPARE OUTPUTS
B HEATER TEST BLOCK CONTACT SELF X8 B
TEMP SCANNER/SCADA/RTU/DCS CKTS
RESET ISOLATOR
X9 INDICATION/ANNUNCIATON CKTS
DIGITAL OPTO
INPUT X-BCU
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

SW POWER CONTROL NORMALLY M


SOCKET WITH SELECTOR OPEN CONTACT DIU-SLOT BCU DI INPUTS
SWITCH SWITCH HAND RESET X-BCU
DOU-SLOT BCU DO INPUTS
X-BCU
NORMALLY EARTH
POTENTIAL CLOSE SWITCH AIU-SLOT BCU AI INPUTS
THERMOSTAT CLIO OUTPUT
TRANSFORMER CONTACT HAND X10 FOR INTER PANEL CABLES
C RESET C
LIGHTINING X100 BUS WIRING CT/PT CKTS (INTRA-BAY)
ARRESTER X101-X109
CHANGEOVER BUS WIRING CONTROL CKTS (INTRA-BAY)
CURRENT
FUSE CONTACT HAND CLIO INPUT X200 BUS WIRING CT/PT CKTS (INTER-BAY)
TRANSFORMER
RESET
X201-X209 BUS WIRING CONTROL CKTS (INTER-BAY)
WAVE TRAP

INDICATING
LINK SEMAPHORE
LAMPS SELF-RESET FERRULE NUMBERING STANDARDS
COIL WITH/
D WITHOUT FLAG FERRULE CIRCUIT D
GENERATOR
TB PRIMARY
ANNUNCIATOR
RESISTOR EQUIPMENTS "A" CT CIRCUIT-MAIN PROTECTION
WINDOW INPUT
"B" CT CIRCUIT-BUSBAR PROTECTION
NON-
DISCONNETING "C" CT CIRCUIT-BACKUP PROTECTION
TB "D"
POTENTIO DIODE
HAND-RESET CT CIRCUIT-METERING
NON- COIL WITH/ TRANSFOMER
METER "E" VT CIRCUIT-PROTECTION/METERING
DISCONNETING WITHOUT FLAG
TB FOR SCADA/
"G" VT CIRCUIT-SYNCHRONISING
BCU "H" AUXILARY AC CIRCUIT
E BUS WIRE E
MCB REPRESENTATION "J" AUXILARY DC CIRCUIT
SOURCE / TARGET DISCONNETING
TB "K" CONTROL CIRCUIT
SELF-RESET
CAPACITIVE
SLOW "L" INDICATION & ALARM CIRCUITS
NON- VOLTAGE
OPERAING COIL
DISCONNETING TRANSFOMER "P" DC CIRCUIT- BUSBAR PROTECTION CIRCUIT
NORMAL WIRE WITH REVERSE/
METROSIL
REPRESENTATION TB FOR INTER FORWARD FLAG "S" SCADA/EVENT LOGGER/DAS CIRCUITS
SOURCE / TARGET PANEL BUS
WIRING
"U" SPARE CONTACTS

NOTE: RELAY CONTACTS SHOWN WITH CONTACT DE ENERGIZED CONDITION.


F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 001 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. LIST OF SYMBOLS REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 002
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

132KV, 800A,50Hz MAIN BUS, 31.5KA FOR 1 SEC BUSBAR


A A

89A 89AE

89A-BPT

89AE

132KV BUS PT
52

WDG-1 WDG-2
B B
LINE CT
TVM
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

P1
P1
CORE-3

MICOM P543
DIFF. PROTN(87L)

C CORE-2
C

132KV BUS PT 132KV BUS PT


WDG-1 WDG-2
RATIO: 132kV/3/110V/3 RATIO: 132kV/3/110V/3
51/50,67N,50LBB CLASS: 0.2 CLASS: 3P
(BCPU) BURDEN: 150VA BURDEN: 50VA
C264P

CORE-1

P2

LINE-CVT LINE-CVT
WDG-1 WDG-2
D D
RATIO: 132kV/3/110V/3 RATIO: 132kV/3/110V/3
CLASS: 0.2 CLASS: 3P
FUTURE USE
(FOR SYNCHRONISING)

BURDEN:150VA BURDEN:50VA

89L

LINE CT LINE CT LINE CT


CORE-1 CORE-2 CORE-3
89LE
1 2 RATIO : 600-300/1A RATIO : 600-300/1A RATIO : 600-300/1A
CLASS : 5P20 CLASS : PS CLASS : 0.2S
E BURDEN:20VA RCT<6 Ohms@600/1A BURDEN: 20VA E
LINE-CVT ISF/ALF:20 iexc(max.) AT Vk/2:100 ISF/ALF: <=5

ADOPTED CT RATIO:600/1A* ADOPTED CT RATIO:600/1A* ADOPTED CT RATIO:600/1A*

120KV,10KA
LA

NOTE:* ADOPTED CT RATIO TO BE CONFIRMED BY CUSTOMER


132KV LINE

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 002 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. SLD & TRIP LOGIC REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 003
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

A A

DIFFERENTIAL
BACKUP PROTECTION AUTO RECLOSE
PROTECTION TRIP RELAY PLCC
{MICOM C264P} {MiCOM C264P}
{MiCOM P543}

CARRIER RECEIVED
OPTD. AND Z2 WITH

DIST. PROTN. OPTD

CB AUTO RECLOSE
SOTF,PROTECTION

3-PH MASTER TRIP


LINE DIFF., DIST 21

1-PH TRIP RELAY


OVER CURRENT

LBB TRIP RELAY


AUTO RECLOSE
EARTH FAULT.
Z2,Z3 FAULTS,

DIRECTIONAL

DIRECT TRIP
LBB PROTN
OPERATED

LOCK OUT

RELAY (86)

RECEIVE
B B

PROTN.
PROTECTION TRIP LOGIC FOR
132KV LINE

(21X)
(96)
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

RELAY CODE 21 21 21 50LBB 51/50 67N 79 79 86 96 21X

1/3-
PROTECTION TRIP 1-PH 3-PH 3-PH 3-PH 3-PH 1-PH
PH

TO CB TRIP COIL-1 TP IP TP TP TP

TO CB TRIP COIL-2 TP IP TP TP TP

LBB PROTN INITIATION IP IP IP IP


C C
C
AUTO RECLOSE
B IP
INITIATION

BLOCK AUTO RECLOSE IP IP IP

CLOSE MAIN CB IP RS RS

3-PH MASTER TRIP(86) RELAY IP IP IP IP IP

DIRECT TRIP SEND IP IP

CARRIER SEND IP
D D
LBB TRIP RELAY(96) IP

1-PH TRIP RELAY (21X) IP

DR IP IP IP IP IP IP IP IP

IP -INDICATES INITIATION FROM PROTECTION FUNCTION

TP -INDICATES TRIP FROM PROTECTION FUNCTION


E E
RS -INDICATES RESET STATUS FOR CB CLOSING

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 003 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. TRIP LOGIC REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 004
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

+ACDB

A A

230V AC, 50HZ

** **
PH N

+1L3 +ADJACENT PANEL

B X1 X1 3 3 B
1 2 1 2 1 2
4 4
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

H1

H2
3 3
1 2 1 2
4 4

MCB91
1 2

3
.3C
C MCB91 C
.5C 3 4

4
16A
12
14 11 /038.3D

H3

H4

1 1

D DS HS 2 D
VD2X
2 2
80AC AC
.5E
H5

H7

1 1

SW

TH PS

2 2 80AC
3 2 AC 1 .5D
H9

E E
TO BCPU CKT. 11 /039.3D
CIL 7 3

SPARE 12 /046.6C
1 8 4
4 HT
SPARE 13 /046.7C
9 5
2
14
10 6

NOTE: ** - TERMINALS TO BE IDENTIFY AT SITE

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 004 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. AC DISTRIBUTION REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 005
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

+DCDB

A 220V DC SOURCE A

** **
+Ve -Ve

NOTE: ** - TERMINALS TO BE IDENTIFIED AT SITE

+1L3
X1 X1
3 4

B B
J1

J2
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

MCB1
.1E
2

16A

J11
/006.2A

C C

J12
/006.2B
1

3
MCB2 MCB3 MCB4 MCB5 MCB6
.2E .3E .4E .5E .6E
2

4
6A 6A 10A 10A 10A

D D
1S101

1S102
K101

K102

K701

K702
K51

K52
K1

K2
/013.1B

/028.2B

/028.2E

/023.1B

/023.1B

/024.1B

/024.1B

/026.1B

/026.1B
/013.1F

TO MAIN PROTN. TO BCPU CKT. TO TRIP COIL-1 TO TRIP TO ISOLATOR


(87L) CKT. & AUX. RELAY & CLSG. CKT. COIL-2 CKT. CTRL. CKT.

E E
MCB1 MCB2 MCB3 MCB4 MCB5 MCB6
1 2 1 2 1 2 1 2 1 2 1 2
.1B .1D .2D .3D .5D .6D
3 4 3 4 3 4 3 4 3 4 3 4
12 12 12 12 12 12
14 11 /045.4C 14 11 /038.4D 14 11 /014.2C 14 11 /038.5D 14 11 /038.5D 14 11 /038.7D

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 005 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. DC DISTRIBUTION REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 006
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

+1L3
A A

220V DC SUPPLY
/005.7C J11 J11

/005.7C J12 J12

B B
2

3
MCB7 MCB8 MCB10 MCB9 RELVD1X220
.1E .2E .4E .3E 80DC DC
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

2 6A

4
6A 6A 4A .7E
1

K901

K902
1 2
K801

K802

K401

K402

P101

P102
+Ve -Ve
C C
EFS-B1
/043.1C

/043.1D

/020.1C

/021.1C
/020.1F

/021.1F
+Ve -Ve
3 4
AUX RELAY CKT. TO MASTER TRIP TO LBB TRIP RELAY
RELAY CKT. CKT.

MCB11

K903

K904
.5E
X1

DC SOURCE - 2
2 1

(FUTURE USE)
K906
5

D D
X1
4 3 K905
4A 6

MCB7 MCB8 MCB9 MCB10 MCB11 80DC


2 DC 1 .6B
1 2 1 2 1 2 1 2 1 2
E .2B .3B .5B .4B .5D DC FAIL TO TRAFO-1 BCPU 11 /045.2C E
7 3
3 4 3 4 3 4 3 4 3 4
SPARE 12 /046.1C
12 12 12 12 12 8 4
14 11 /038.6D 14 11 /039.2D 14 11 /045.3C 14 11 /039.2D 14 11 /045.5C 13
SPARE 5 /046.2C
9
14
10 6

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 006 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. DC DISTRIBUTION CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 007
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

LINE-CVT +CVT MB +1L3

132kV LINE
A B C
A A

** X3
E411 E411
/031.2E

TO BCPU
1

** E431 E431
/031.2E
2
B B

**
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

** E371
LINE-CVT
4
RATIO: 132kV/3/110V/3 1
CLASS: 0.2
BURDEN:150VA E4

C 2 C

X3
**
5

D ** D

FUTURE USE
6

**
7

** E471
8
RATIO: 132kV/3/110V/3 1
CLASS: 3P
BURDEN:50VA E5
E E
2

NOTE:* TERMINAL DETAILS TO BE IDENTIFIED AT SITE

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 007 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. CVT DISTRIBUTION CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 008
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+1L3
Version 1.0

LINE CT +CTJB

BUS SIDE
A A
P1
X2
3S1-R XX D111
/010.3A
1
3S2-R XX
2
3S3-R XX

TO METERING CIRCUIT
3S1-Y XX D131
/010.3A
CORE-3 3
3S2-Y XX
RATIO : 600-300/1A
CLASS : 0.2S 4
ISF/ALF: <=5 3S3-Y XX
B ADOPTED CT RATIO:600/1A* B
3S1-B XX D151
/010.3B
5
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

3S2-B XX
6
3S3-B XX
D171
/010.3B
7 E1
D171S 1 2
8

C C

X2
2S1-R XX A111
/011.2B
9
2S2-R XX
10

TO DIFF. PROTN. RELAY CIRCUIT


D 2S3-R XX D
2S1-Y XX A131
/011.2C
CORE-2 11
2S2-Y XX
RATIO : 600-300/1A
CLASS : PS 12
iexc(max.) AT Vk/2:100 2S3-Y XX
ADOPTED CT RATIO:600/1A*
2S1-B XX A151
/011.2C
13
2S2-B XX
14
2S3-B XX
E A171
E
/011.2D
15 E2
P2 A171S 1 2
16
LINE SIDE

NOTE:-
*ADOPTED CT RATIO TO BE CONFIRMED BY CUSTOMER
**TERMINALS TO BE IDENTIFIED AT SITE

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 008 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. CT DISTRIBUTION CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 009
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

A A

LINE CT +CTJB +1L3

B BUS SIDE
B

P1
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

X2
1S1-R XX C111
/031.2A
17
1S2-R XX
18
1S3-R XX

TO BCPU CIRCUIT
1S1-Y XX C131
/031.2B
C CORE-1 19 C
1S2-Y XX
RATIO : 600-300/1A
CLASS : 5P20 20
ISF/ALF:20 1S3-Y XX
ADOPTED CT RATIO:600/1A*

1S1-B XX C151
/031.2B
21
1S2-B XX
22
1S3-B XX
C171
/031.2C
23 E3
2
D C171S 1 D
24
P2
LINE SIDE

E E

NOTE:-
*ADOPTED CT RATIO TO BE CONFIRMED BY CUSTOMER
**TERMINALS TO BE IDENTIFIED AT SITE

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 009 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. CT DISTRIBUTION CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 010
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

+1L3

TTB
A 1
D113 A
/008.6A D111 D111
2
D171
3 3

FROM LINE CT CORE-3


D133
4
/008.6B D131 D131
5
D171
6 6

D153
7
/008.6B D151 D151
8
D171
9 9

B B
/008.6C D171 D171
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

TWISTED PAIR CABLE

1S 1L 2S 2L 3S 3L
S251

RS485 COMM
/030.5D S1

TO BCPU
C S252 C
/030.5D S2 TVM

S253
/030.5D SC
+132kV BUS PT DB
R Y B NS
X3

9
BUS VT WDG-1

**
132kV

** 10

** 11

D ** 12 D

X200 TTB
FS111
1 E111 1 2 E113 E115
A2 A1
4A
X200
FS131
1 2
SPARE

2 E131 E133 E135


B2 B1
4A
X200
FS151
3 E151 1 2 E153 E155
E C2 C1 E
4A
X200
LK171
4 E171 1 2 E173 E175
N2 N1
NOTE:* ADOPTED CT RATIO TO BE CONFIRMED BY CUSTOMER

** TERMINAL TO BEIDENTIFIED AT SITE

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 010 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. METERING CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 011
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

A A
+1L3

P543
87L
/015.1A
B B
BLKA 5A 1A A179
C1 C2
/048.3C
S3 R3
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

/008.6D A111 A111 A113


C3

5A 1A
C4 C5
FROM LINE CT CORE-2

/048.3C
A131 A131 S4 R4 A133
/008.6D
C6

5A 1A
C C7 C8 C
/048.3C
A151 A151 S5 R5 A153
/008.6E
C9

5A 1A
C10 C11
/048.3C
A171 A171 S6 R6 A175
/008.6E
C12

A181
26
**

COMPENSATION
A177
D 27 D

MUTUAL
X2

25
**
28

E E

NOTE: ** SHORTING LINKS WILL BE REMOVED IN


FUTURE, IF CONNECTION FROM PARALLEL LINE
PANEL IS DONE AS SHOWN

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 011 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. DIFF. PROTN.-CT CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 012
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

+1L3

A A

+132kV BUS PT DB
X3

13

BUS VT WDG-2
**

132kV
** 14

** 15

16
B ** B
P543
BLKB 87L
/015.3A
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

X200
FS211 /048.4C
5 E211 1 2 E213 S3 R3 E215 VA

4A C19
X200
FS231 /048.4C
SPARE

6 E231 1 2 E233 S4 R4 E235 VB

4A C20
X200
FS251 /048.4C
7 E251 1 2 E253 S5 R5 E255 VC

C 4A C21 C
X200
LK271 /048.4C
8 E271 1 2 E273 S6 R6 E275 VN
C22

V NEUTRAL
C23

C24

D D
E211
/031.2C

E231
/031.2D
TO BCPU

E251
/031.2D

E271
/031.2D

E E

NOTE: ** TERMINALS TO BE IDENTIFIED AT SITE

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 012 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. DIFF. PROTN.-VT CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 013
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

CB CB DIRECT TRIP TRIP RELAY 86


CARRIER FAIL LBB TRIP RELAY OPTD CARRIER RECEIVED BCPU UNHEALTHY
OPEN CLOSE RECEIVED OPTD

+52 CB
A A
DRG. REF: CG-145GO-WIR, SHT: 1/2, R0

TB-36 TB-16

TB-37 TB-17

NOTE: ** - TERMINALS TO BE IDENTIFIED AT SITE


+1L3
B B

/005.1D K101 K101


/017.1D
X4
1
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

S2 2 3
BLKA
/048.3C
R2

K103
/014.1B

K103
C C

/030.3C
50 51
11 7 12 8 50 51 11 7 RL5
RL5 86
/020.7C
RX COX 96 85X
/017.6E /017.4E /021.7C /017.2E
5

/030.3C
3 4 5 3
K103

K105

K107

K109

K111

K113

K119
K113A

K117
D D
P543
+

J2 D2 D4 D6 D8 D10 D12 D14 D16


87L
/015.1D

P543
87L
/015.4D

- D1 D3 D5 D7 D9 D11 D13 D15


J1

E E
K104

K104
/014.1E
R2
BLKB
/048.4C
S2

/005.2D K102 K102


/017.1D

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 013 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. DIFF. PROTN.-OPTO INPUT CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 014
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

LED RESET COMMAND CARRIER SW. IN OUT


SOTF INITIATION BCPU MCB TRIP SARE SARE SARE SARE
FROM BCPU POSITION

A A

+1L3
B B
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

/013.8C K103

X4 X4
4 7

K103
/042.6C
11 7 1 12 14 3
TRIP IN
CSS
C 52XC 52CS
AT
AC MCB3 /047.5C OUT C
/047.3C CLOSE 4
/043.2D /005.3E

/042.6C
2
3 11
X4 X4 X4 X4
5 6 8 9

K125
K121

K123

K129

K131

K133

K135

K137
D D
P543 F2 F4 F6 F8 F10 F12 F14 F16
87L
/015.3D

F1 F3 F5 F7 F9 F11 F13 F15

E E
/013.8E K104

NOTE: ** TERMINAL TO BE IDENTIFY AT SITE

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 014 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. DIFF. PROTN.-OPTO INPUT CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 015
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+1L3

87L 87L
A A

C1
VA H1 G1
5A
/017.5C /046.3C
C19 DIST.Z1 OPTD TO CARRIER SEND CKT. H2 RL1 RL8 G2 SPARE
C2
1A
VB
C3
C4 C20 H3 G3
/020.2D /046.4C
5A LINE DIFF., DIST (Z2/Z3), SOTF OPTD. & DT H4 RL2 RL9 G4 SPARE
VC RECEIVED TO 86 TRIP RELAY
C5
1A C21
/012.7B
H5 G5
C6 /019.5C /046.4C
/011.5B C7 VN LINE DIFF., DIST 21 OPTD. AND Z2 WITH H6 RL3 RL10 G6 SPARE
B C22 CARRIER RECEIVED TO 21X RELAY B
5A

C8
1A H8 G8
C23 H7 G7
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

/037.2D /046.5C
C9 A/R INITIATION TO BCPU SPARE
C10 H9 RL4 RL11 G9
(DIST. Z-1 OPTD.)
V NEUTRAL
5A
C24
C11
1A H11 G11
/037.4D H10 G10 /023.5C
C12 LBB INITIATION TO BCPU RL5 RL12 LINE DIFF., DIST 21 OPTD. AND Z2 WITH
H12 G12
(DIST. Z-1 OPTD.) CARRIER RECEIVED TO TC-1

C13
C 5A H14 G14 C
/046.5E H13 G13 /024.5C
C14 GENERAL TRIP TO TEST KIT LINE DIFF., DIST 21 OPTD. AND Z2 WITH
H15 RL6 RL13 G15
1A CARRIER RECEIVED TO TC-2
MICOM P543 LED CONFIGARATION
C15 (DEDICATED LED's)
H17 G17
/046.2C H16 G16
SPARE
TRIP
D1 F1 H18 RL7 RL14 G18
D2 F2 ALARM

D3 F3 OUT OF SERVICE
D4 F4 J11
WD1 /036.4D
J12 HEALTHY
D RELAY FAULTY TO BCPU D
D5 F5 J2 +
D6 F6 /013.1D
J1 - J13
D7 F7 WD2 J14 MICOM P543 LED CONFIGARATION
D8 F8 (USER PROGRAMMABLE LED's)

/013.2D /014.2D
D9 F9
LINE DIFF PROTN OPTD
D10 F10

DIST.Z1 OPTD (R-PH)


D11 F11
D12 F12
DIST.Z1 OPTD (Y-PH)
E D13 F13
E
DIST.Z1 OPTD (B-PH)
D14 F14

DIST.Z2 OPTD
D15 F15
D16 F16
DIST.Z3 OPTD

SOTF OPTD

VT FUSE FAIL

F CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A F
SHT : 015
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. DIFF.RELAY DEVICE REFERENCE REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 016
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

OPTO INPUT
SL.NO 87L (MiCOM P543)
I/P-1 I/P-2 I/P-3 I/P-4 I/P-5 I/P-6 I/P-7 I/P-8 I/P-9 I/P-10 I/P-11 I/P-12 I/P-13 I/P-14 I/P-15 I/P-16

A A

SOTF INITIATION
FOR STATUS

FOR STATUS

FOR STATUS

FOR STATUS

FOR STATUS

FOR STATUS

FOR STATUS
FOR DR

FOR DR

FOR DR

FOR DR

SPARE

SPARE

SPARE

SPARE
01 CB STATUS a a
02 CARRIER RECEIVED a
B B
03 DIRECT TRIP RECEIVED a
04 BCPU UNHEALTHY a
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

05 CB CLOSE COMMAND a
06 86 TRIP RELAY OPTD a
07 LBB TRIP RELAY OPTD a
08 CARRIER FAIL a
C 09 BCPU MCB TRIP a C

10 LED RESET a
11 CARRIER IN/OUT POSITION a
12 SPARES a a a a

SL.NO 87L (MiCOM P543) OUTPUT


RL1 RL2 RL3 RL4 RL5 RL6 RL7 RL8 RL9 RL10 RL11 RL12 RL13 RL14 WD1 WD2
TO CARRIER SEND CKT.

TO SINGLE PHASE TRIP


TO TRIP RELAY 86 CKT.

D D

TO BCPU CKT.
TO TC-1 CKT.

TO TC-2 CKT.
FOR STATUS
TO BCPU.

TO BCPU.

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE
RELAY

01 DIST. Z1 OPERATED a a
02 LBB INITIATION a
E 03 A/R INITIATION a E

04 DIST. PROTN.(Z2,Z3,DEF & SOTF ) OPTD a


05 TRIP TO TEST KIT a
06 RELAY FAULTY a
LINE DIFF., DIST 21 OPRTD AND Z2 WITH
07 CARRIER RECEIVED a a
08 SPARES a a a a a a a
F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 016 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. 87L RELAY I/O DETAILS REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 017
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

CARRIER RECEIVE CARRIER FAIL / OUT OF DIRECT TRIP


DC SUPPLY CARRIER SEND
TO DISTANCE RELAY SERVICE RECEIVED

A +PLCC +PLCC +PLCC +PLCC A

* * * *

CS

* * * *
NOTE: * - TERMINALS TO BE IDENTIFIED AT SITE
+1L3
B B
X4 X4 X4 X4 X4 X4 X4
10 11 12 13 14 15 16
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

K141

K145

K147

K149
H1
RL1
87L
/015.4A
C C
H2
K139

K115

K143
2 2
1 RAAS4F 7 2 5 9 RAAS4F
CSS IN
85X COIL CSS IN
RAAS4F CSS IN
CSS IN
RX COIL
/047.5C OUT /047.5C OUT /047.5C OUT /047.5C OUT
2 .2E 8 COX COIL 6 10 .6E
1 .4E 1
1

D D
/013.1B K101 K101
/018.2E

/013.1F K102 K102


/018.2F

85X COX RX
2 2 2
COIL 1 .2C COIL 1 .3D COIL 1 .7C

TO 87L RELAY OPTD. 11 /013.6D CARRIER FAIL TO BCPU 11 /036.2D DT RECEIVED TO 87L RELAY 11 /013.4D
7 3 7 3 7 3

SPARE 12 /046.7C CARRIER FAIL TO 87L RELAY 12 /013.4D TO TRIP RELAY 86 12 /020.4D
E 8 4 8 4 8 4 E
13 SPARE 13 /046.4B TO BCPU DT RECEIVED 13 /036.5D
9 5 9 5 9 5
14 SPARE 14 /046.4B SPARE 14 /046.5B
10 6 10 6 10 6

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 017 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. CARRIER RECEIVE AND SEND CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 018
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

DEF PROTN OPTD TO BCPU-DIRECT TRIP DIRECT TRIP


DC SUPPLY LBB TRIP MANUAL TRIP CUSTOMER USE
FROM BCPU SEND COMMAND

A A
+PLCC

DTS

B * B

NOTE: * - TERMINALS TO BE IDENTIFIED AT SITE


This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

+1L3
X4 X4
17 18

K153

C C

K153
K153
/043.3C

/036.6D
60 61 11 7 11 X4
TRIP 19
RL6 AT
96 52XT 52CS AC
/047.3C CLOSE
/021.7C /043.2E
D 12 D

/036.7D
/043.3C
6 3 X4
20

K102
K151
E E
LK3
K101 1 2 K151 K151
/017.7D /019.4B

K102 K102
/017.7D /019.4E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 018 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. DIRECT TRIP SEND CIRCUIT REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 019
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

LINE DIFF., DIST 21 OPTD. AND Z2 WITH


DC SUPPLY
CARRIER RECEIVED

A A

+1L3

/018.6E K151

B B
S8
BLKA
/048.3C
R8
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

K155
H5
RL3
C 87L C
/015.4B 21X
d
H6 COIL a .5D
10
TO CB TRIP COIL-1 CKT. /023.4C
11 1
20
TO CB TRIP COIL-2 CKT. /024.4C
21 2
30
SPARE /046.4E
31 3

K157
40
SPARE /046.4E
41 4
50
51 5
60
61 6
D d 70 D
RAXSH8 71 7
21X COIL 80
.6C 81 8

/018.7F K102

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 019 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. SINGLE PHASE TRIP RELAY CKT REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 020
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

LINE DIFF.., DIST. DIRECTIONAL O/C & AUTO RECLOSE


TRIP RELAY 86 TRIP RELAY RESET FROM
DC SUPPLY PROTN.(Z2,Z3,DEF & E/F PROTN. OPTD. LOCKOUT FROM DIRECT TRIP RECEIVED CUSTOMER USE
SUPERVISION BCPU
SOTF ) OPTD. FROM BCPU BCPU

A A

B B
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

+1L3

X4 X4
21 22
86
K401 b
/006.3C OP a .2E
1 1 d
RE c .6E
S7
C BLKA
LK4 LK5 TO CB CLSG. I/L
10
/022.3C C
/048.3C 11 1
20
R7 2 2 TO CB TC-1 CKT /023.3C
21 2
30
TO CB TC-2 CKT /024.4C
K403

K413

K415

K401

K401
31 3
40
TO BCPU A/R BLOCK /037.2D
41 4
/042.3C

/042.4C

/037.6D

/042.2C
50
H3 12 8 TO 87L RELAY (DR PURPOSE) /013.7C
51 5
RL2 60
87L RX 61 6
/015.4B /017.6E 70
SPARE /046.1B
71 7
H4 4 80
SPARE /046.2B

/037.7D

/042.2C
81 8
/042.4C
/042.4C

D D
K405

K405

K405

K405

K409
b d

E BAXBH8 BAXBH8 E
86 OP 86 RE
.7C .7C

a c

/006.3C K402

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 020 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. TRIP RELAY-86 CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 021
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

LBB PROTN.
LBB PROTN. LBB TRIP RELAY (96) LBB TRIP RELAY(96) RESET
DC SUPPLY DC SUPPLY TO ADJ.PANEL OPERATED FROM/TO CUSTOMER USE
OPERATED FOR OWN BAY SUPVN. TO BCPU FROM BCPU
OTHER BAYS

A A
+ADJACENT PANEL

B B
+1L3
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

X201 X201 X201


X4 X4
1 2 3 23 24

P103
P101

P102

C C
/006.4C P101
1

LK6

P101

P101
2 96
P101A

b
OP a .3E

/038.2D

/042.5C
d
RE c .6E
10
/042.5C

TO CB CLOSING I/L /022.3D


11 1
20
TO CB TC-1 CKT. /023.4C
D 21 2 D
30

/038.3D

/042.6C
TO CB TC-2 CKT. /024.4C
31 3
/042.5C

40
TO BCPU A/R BLOCK /037.3D
41 4
50
TO 87L RELAY (DR PURPOSE) /013.5D

P103

P107
51 5
60
P103

TO DIRECT TRIP SEND CKT /018.3D


61 6
70
71 7
80
SPARE /046.5C
81 8
b
d

E E
BAXBH8
96 OP BAXBH8
.7C 96 RE
.7C

a
c

/006.4C P102 P102

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 021 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. LBB TRIP RELAY 96 CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 022
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

TRIP RELAY 86 , LBB TRIP RELAY REMOTE / LOCAL CLOSE,REMOTE AUTO RECLOSE
96 NOT OPTD. TC-1 & TC-2 SYNCH.PERMISSIVE & LOCAL COMMAND
HEALTHY SYNCH. PERMISSIVE FROM BCPU

A +1L3 A

K7

13 9

195
/023.4D
9
TRIP
5 AT
52CS AC
/047.3C CLOSE

K31
10
B B

13 9
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

295
/024.4E

K33
5

X5
4

K29
10 11 X5
C 5 C
RL1
86
/020.7C

K5

K9
/042.1C
10 11
RL1

K7
D 96 12 8 D
/021.7C

/042.3C
/042.2C
1 52XC
/043.2D

K27

/042.3C
K3

K11
E X5
3
X5
6 7
E

+52 CB

** TB-3 **

+Ve REMOTE CLOSE


DRG. REF: CG-145GO-WIR, SHT: 1/2, R0 AUTO RECLOSE NOTE: ** - TERMINALS TO BE IDENTIFY AT SITE

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 022 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. CB CLOSING CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 023
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

LBB TRIP LINE DIFF., DIST 21 LINE DIFF., DIST 21


COMMON +VE REMOTE TRIP - TRIP RELAY-86 FUTURE POST CLOSE SUPVN. /
TC-1 DC SUPPLY LOCAL TRIP RELAY-96 OPTD. AND Z2 WITH OPTD. AND Z2 WITH PRE- CLOSE SUPVN.
FOR TC-1 HMI OPTD. CARRIER RECEIVED TRIP CARRIER RECEIVED PROTN. TRIP
OPTD.

A A

NOTE: ** - TERMINALS TO BE IDENTIFIED AT SITE


+1L3

/005.3D K1 K1
/025.2B

B B
/005.4D K2 S9
BLKB
/048.4C
R9
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

K39
X5
13
20 21 20 21 10 11 G10 G11
RL2 RL2 RL12 1
86 96 21X 87L
/020.7C /021.7C /019.6C /015.6C
12 8 3 X5 4
C TRIP 14 C
AT 2 2 1 G12 VD3X220 VD3X220
52XT 52CS AC
/047.3C CLOSE 195 COIL K1 195 COIL K2
/043.2E .4D .4D
4
4 8

12 2

K2
/025.3D
D D
K15

LK1 195
1 COIL K1 12 .6C
2
4 COIL K2 8 .7C

K19

K23

K21
13
K2

K13

K17

TO CB CLOSING I/L 5 /022.3B


9
TO CON. MULTI RELAY 14 /025.3C
10 6

E X5
1 2 8 9
X5
12
X5
10
X5
11
E

+52 CB

TB-1 TB-2 ** TB-6 TB-7 TB-8 TB-9

+VE DRG.REF.NO:CG-145GO-SCH
-Ve REMOTE TRIP-1 POST CLOSE PRE CLOSE
+Ve
SUPERVISION SUPERVISION

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 023 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. CB CLOSING & TC-1 CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 024
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

LINE DIFF., DIST 21 LINE DIFF., DIST 21


COMMON +VE FUTURE POST- CLOSE SUPVN /
TC-2 DC SUPPLY REMOTE TRIP TRIP RELAY-86,96 OPTD. OPTD. AND Z2 WITH OPTD. AND Z2 WITH PRE CLOSE SUPVN
FOR TC-2 CARRIER RECEIVED TRIP CARRIER RECEIVED PROTECTION TRIP

A A

NOTE: ** - TERMINALS TO
+1L3 BE IDENTIFY AT SITE

K51 K51
/005.5D /025.5B

B B
/005.5D K52

S10
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

BLKB
/048.4C
R10

K71
1
C C
30 31 30 31 20 21 X5 G13 G14
22
13 9 15 RL3 RL3 RL13
TRIP
A/T
86 96 21X 87L 4
52CS /020.7C /021.7C /019.6C /015.6C VD3X220
52XT /047.3D
A/C
295 COIL K1
/043.2E CLOSE VD3X220
16 3 3 2 X5 G15 .4E 295 COIL K2
23 .4E
5
8
12 2

D D
K55

K52
/025.5D

1
295
LK2
1 COIL K1 12 .6C

2 4 COIL K2 8 .7C
K51

K52

TO CB CLOSING I/L 13 /022.3B


K53

K57

K59

K63

K61
9 5
E TO CON. MULTI RELAY 14
10 6 /025.5C E
X5 X5 X5 X5
15 16 17 18 21 19 20

+52 CB

** ** TB-10 TB-11 TB-12 TB-13


**

DRG.REF.NO:CG-145GO-SCH
REMOTE TRIP-2 POST CLOSE PRE CLOSE
+Ve -Ve +VE SUPERVISION SUPERVISION

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 024 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. CB TC-2 CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 025
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

195 RELAY CONTACT 295 RELAY CONTACT


DC SUPPLY DC SUPPLY
MULTIPLICATION MULTIPLICATION

A +1L3 A

/023.6B K1 /024.6B K51

B B
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

14 10 14 10

195 295
/023.4D /024.4E

6 6

K67

K69
C C

A1 A1

195X COIL 295X COIL


.2D .5D
A2 A2

D /023.6D K2 /024.6D K52 D

195X 295X
A1 COIL A2 .3C A1 COIL A2 .5C

TO BCPU 12 12
14 11 /036.2D TO BCPU
14 11 /036.3D

SPARE 22 22
24 21 /046.1E SPARE
24 21 /046.2E

SPARE 32 32
34 31 /046.2E SPARE
34 31 /046.3E
42 42
44 41 44 41
E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 025 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. TRIP COIL CON. MUL. CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 026
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

DC SUPPLY ISOLATOR-89A EARTH SWITH-89AE ISOLATOR-89L LINE EARTH SWITH-89LE

A A

+1L3

K701 K701
/005.6D /027.1B

K702 K702
/005.6D /027.1B

B B
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

/043.4C

/043.5C
/043.3C

/043.5C
K705

K713
K703

K711
/043.4C

/043.6C
/043.4C

/043.6C
C C

K709

K717
K707

K715
12 14 12 14 12 14 12 14

89A-O 89A-C 89L-O 89L-C


/044.1D /044.2D /044.3D /044.4D

11 11 11 11

D D
K701

K702

K731

K733

K735

K701

K702

K741

K743

K745
X6 X6 X6 X6 X6 X6 X6 X6 X6 X6 X6 X6 X6 X6 X6 X6 X6 X6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

+89A MB +89AE MB +89L MB +89LE MB


TB1-1 TB1-2 TB1-7 TB1-8 TB1-9 TB1-3 TB1-6 TB1-25 TB1-26 TB1:27 TB1:28 TB1-1 TB1-2 TB1-7 TB1-8 TB1-9 TB1-3 TB1-6 TB1-25 TB1-26 TB1:27 TB1:28

E E

CLOSE
OPEN
COMMON
CLOSE
COMMON

OPEN

+VE

-VE

+VE

-VE
I/L PERMISSIBLE I/L PERMISSIBLE I/L PERMISSIBLE I/L PERMISSIBLE
+VE

-VE

-VE
+VE

ISOL.&E/S DRAWING REF.NO: 4.MTS13,4.NTS15

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 026 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. ISOLATOR CONTROL CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 027
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

DC SUPPLY BUS PT ISOLATOR-89A BUS EARTH SWITH-89BE

A A

+1L3

/026.8B K701

/026.8B K702

B B
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

/043.6C
/043.6C

K721
K719

/043.7C
/043.7C
C C

K725
K723
12 14 12 14

189-O 189-C
/044.5D /044.6D

11 11
K751

K753

K755

D D

X6 X6 X6 X6 X6 X6 X6 X6 X6
19 20 21 22 23 24 25 26 27

+BUS PT ISOL. +89BE MB


TB1-1 TB1-2 TB1-7 TB1-8 TB1-9 TB1-3 TB1-6

E E
CLOSE
COMMON

OPEN

+VE

-VE

I/L PERMISSIBLE I/L PERMISSIBLE


+VE

-VE

ISOL.&E/S DRAWING REF.NO: 4.MTS13,4.NTS15

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 027 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. ISOLATOR CONTROL CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 028
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

SPARE SPARE SPARE CONTACTS

A A
+1L3

/005.2D 1S101 1S101


/030.6C

B X4 X4 B
25 27 86AT
12 14 22 24
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

FUTURE USE

FUTURE USE
.2E .2E

11 21

U1

U2

U3

U4
X7 X7 X7 X7
1 2 3 4
X4 X4
C 26 28 C

86BT
1S155

1S157
12 14 22 24

.4E .4E

11 21

A1 A1
D D

U5

U6

U7

U8
86AT COIL 86BT COIL
.2E .4E X7 X7 X7 X7
5 6 7 8
A2 A2

/005.3D 1S102 1S102


/030.6C

86AT 86BT
A1 COIL A2 .3D A1 COIL A2 .4D
E E
SPARE 12 12
14 11 .6B SPARE
14 11 .6D

SPARE 22 22
24 21 .7B SPARE
24 21 .7D

TO FAULT REC. SYS. 32 TO FAULT REC. SYS. 32


34 31 34 31
42 42
44 41 44 41

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 028 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. AUXILIARY RELAY CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 029
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization. Version 1.0

C
E

A
F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD.
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017

PROJECT
1

1
: DEVELOPMENT OF 50 MW SOLAR POWER PLANT
AT SERIPALLE (KM PALLY) TELANGANA (INDIA)

+1L3
BCPU
TMU210
SLOT-Q
SLOT-Q
/031.6A TMU

Q
SPARE
2

2
DIU200
/032.2E SLOT-P
SLOT-P
DIGITAL INPUT CARD

P
/033.2E SPARE

DIU200
SLOT-O
CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD.

CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI.

/034.2E SLOT-O
DIGITAL INPUT CARD

O
/035.2E SPARE

DIU200
/036.2E SLOT-N
SLOT-N
DIGITAL INPUT CARD

N
/037.2E SPARE
3

3
DIU200
/038.2E SLOT-M
SLOT-M
DIGITAL INPUT CARD

M
/039.2E SPARE

DIU200
/040.2E SLOT-L
SLOT-L
DIGITAL INPUT CARD

L
/041.2E SPARE

SLOT-K

K
SPARE
4

4
SLOT-J

J
SPARE

SLOT-I

I
SPARE

SLOT-H

H
SPARE

SLOT-G
5

5
G

SPARE
DOU201

SLOT-F
SLOT-F
/044.1A DIGITAL OUTPUT CARD
F
PANEL TYPE : +1L3

TITLE : 132KV LINE CONTROL & PROTECTION PANEL

SPARE
DOU201

SLOT-E
BCPU CARD DETAILS
WITH LINE DIFFERENTIAL PROTECTION

SLOT-E
/043.1A DIGITAL OUTPUT CARD
E

SPARE
DOU201

SLOT-D
SLOT-D
/042.1A DIGITAL OUTPUT CARD
D

SPARE
6

6
SLOT-C
SLOT-C
DSP CARD
C

SPARE
CPU270

SLOT-B
B

CPU BOARD
BIU261

SLOT-A
SLOT-A
/030.2E POWER SUPPLY UNIT
A

POWER SUPPLY UNIT CARD


DRG. NO.: IN-8023274-S-01
APPROVED : RVN
REVIEWED : DSS
PREPARED : MK
7

7
DATE: 23-02-2017

REVISION: A
8

8
CONT: 030

SHT : 029

C
E

A
F
1 2 3 4 5 6 7 8
Version 1.0

BCPU FAULTY TO 87L DIFF. PROTN. RELAY

A A

+1L3

B B
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

BCU INPUT CKT.


AUX. RELAY CKT
C C
/013.7C
1S101 1S101
/013.7D

/028.5B /032.1C

/028.5E 1S102 1S102


/032.1C
K103
K117

RS485 COMM

/010.6C

/010.6C

/010.6C
D D

S253

S251

S252
8
X-BCPU-PS-A 3 4 X-BCPU-PS-A 7 9 X-BCPU-PS-A 1 2 X-BCPU-PS-A 5 6
K117A

K103A

S253A

S251A

S252A

1S101A

1S102A

2S301A

2S302A
C264P 1 2 3 4 5 6 7 9 8 15 16 17 18 19 20 21 23 24 22 10 11
BCPU

R-(RS422)
SLOT-A

RXD/T+

RTS/R+
TXD/T-
/029.7B
E E
GND

DCD
CTS
RS232/
RS422/
RS485

O2 O1 WATCH DOG DI1 DI2 SERIAL LINK-1 POWER POWER


SUPPLY-S1 SUPPLY-S2

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 030 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU POWER SUPPLY UNIT REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 031
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+1L3
Version 1.0

A C264P A
BCPU
SLOT-Q
BLKC /029.2B

/048.5C
C111 C111 S1 R1 C113 C175
/009.7B
15 16

/048.5C
S2 R2
FROM LINE CT CORE-1

/009.7C C131 C131 C133


11 12

B B

/048.5C
C151 C151 S3 R3 C153
/009.7C
7 8
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

/048.5C
C171 C171 S4 R4 C173
/009.7D
3 4

C C
FS217 /048.5C
E211 1 2 E217 S5 R5 E219
/012.3D
4A 21

FS237 22
BUS VT SUPPLY

/048.5C
E231 1 2 E237 S6 R6 E239
/012.3D
4A 23

FS257 24
/048.5C
S7 R7
D /012.3E E251 1 2 E257 E259 D
4A 25

LK277 /048.5C
E271 1 2 E277 S8 R8 E279
/012.3E
26

FS317 /048.5C
E411 1 2 E413 S9 R9 E415
/007.7B
SUPPLY
LINE VT

4A 27

FS337 /048.5C
E431 1 2 E433 S10 R10 E435
/007.7B
4A 28

E E

** NOTE: TERMINALS ARE INDENTIFIED AT SITE.

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 031 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU CT & PT CKT. REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 032
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

LOW GAS PRESSURE LOW GAS PRESSURE DC SUPPLY FAILURE AC SUPLLY FAILURE
CB OPEN CB CLOSE SPRING CHARGED CB REMOTE MODE
ALARM (6.5Kg/sq.cm) LOCKOUT (6.0Kg/sq.cm) ALARM ALARM

A A
+52 CB
DRG.REF.NO:CG-145GO-SCH/ SHT NO.1

+VE
/033.1A

TB-38 TB-18 X1-17 X1-32 X1-45 X1-39 X1-34


**

B B
TB-39 TB-19 X1-18 X1-33 X1-46 X1-40 X1-35
**
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

NOTE :-
** - TERMINALS TO BE IDENTIFIED AT SITE
+1L3

X-BCPU-DIU-P 25

/030.7C 1S101 1S101


/033.1C

C C

/030.7C 1S102 1S102


/033.1C

D D

X-BCPU-DIU-P 1 2 3 4 5 6 7 8 9 10 11 12

BCPU-DIU200-SLOT-P

C264P 1 2 3 4 5 6 7 8 9 10 11 12
E BCPU E
SLOT-P
/029.2B

DI1 DI2 DI3 DI4 DI5 DI6 DI7 DI8

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 032 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU-INPUT CARD REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 033
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

CB IN ISOLATOR 89A ISOLATOR 89A ISOLATOR 89A ISOLATOR 89A


CB HEALTHY STAND BY SUPPLY FAIL SPARE
LOCAL MODE OPEN CLOSE LOCAL REMOTE

A A
+52 CB +89A MB
ISOL.DRAWING REF.NO: 4.MTS12

+VE
/032.7A

TB3-17 TB3-1 ** **
** ** **

B B
TB3-18 TB3-2 ** **
** ** **
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

NOTE :-
+1L3 ** - TERMINALS TO BE IDENTIFIED AT SITE

X-BCPU-DIU-P 26 X-BCPU-DIU-P 27

/032.7C 1S101 1S101


/034.1C

C C

/032.7C 1S102 1S102


/034.1C

D D

X-BCPU-DIU-P 13 14 15 16 17 18 19 20 21 22 23 24

BCPU-DIU200-SLOT-P

C264P 13 14 15 16 17 18 19 20 21 22 23 24
E BCPU E
SLOT-P
/029.2B

DI9 DI10 DI11 DI12 DI13 DI14 DI15 DI16

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 033 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU-INPUT CARD REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 034
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

ISOLATOR 89L ISOLATOR 89L ISOLATOR 89L ISOLATOR 89L


E/S 89AE OPEN E/S 89AE CLOSED E/S 89LE OPEN E/S 89LE CLOSED
OPEN CLOSE LOCAL REMOTE

A A
+89AE MB +89L MB +89LE MB
E/S DRAWING REF:4.NTS15 ISOL.DRAWING REF.NO: 4.MTS12 E/S DRAWING REF:4.NTS15

TB1-13 TB1-1 TB3-17 TB3-1 ** ** TB1-13 TB1-1

B B
TB1-14 TB1-2 TB3-18 TB3-2 ** ** TB1-14 TB1-2

NOTE :-
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

** - CONTACTS TO BE IDENTIFIED AT
SITE
+1L3

X-BCPU-DIU-O 25 X-BCPU-DIU-O 26 X-BCPU-DIU-O 27

/033.7C 1S101 1S101


/035.1C

C C
/033.7C 1S102 1S102
/035.1C

D D

X-BCPU-DIU-O 1 2 3 4 5 6 7 8 9 10 11 12

BCPU-DIU200-SLOT-O

C264P 1 2 3 4 5 6 7 8 9 10 11 12
E BCPU E
SLOT-O
/029.2B

DI1 DI2 DI3 DI4 DI5 DI6 DI7 DI8

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 034 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU-INPUT CARD REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 035
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

BUSPT ISOLATOR BUSPT ISOLATOR BUSPT ISOLATOR BUSPT ISOLATOR BUS E/S 89BE BUS E/S 89BE
CARRIER SPEECH FAIL SPARE
(132-89A-PT) OPEN (132-89A-PT) CLOSE (132-89A-PT) LOCAL (132-89A-PT) REMOTE OPEN CLOSED

A NOTE :- A
+BUS PT ISOL. +89BE MB +PLCC ** - TERMINALS TO BE IDENTIFIED AT SITE
ISOL.DRAWING REF.NO: 4.MTS12 E/S DRAWING REF:4.NTS15

TB3-17 TB3-1 ** ** TB1-13 TB1-1

**

B B
TB3-18 TB3-2 ** ** TB1-14 TB1-2
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

+1L3

X-BCPU-DIU-O 28 X-BCPU-DIU-O 29 X-BCPU-DIU-O 30

/034.7C 1S101 1S101


/036.1C

C C
/034.7C 1S102 1S102
/036.1C

D D

X-BCPU-DIU-O 13 14 15 16 17 18 19 20 21 22 23 24

BCPU-DIU200-SLOT-O

C264P 13 14 15 16 17 18 19 20 21 22 23 24
E BCPU E
SLOT-O
/029.2B

DI9 DI10 DI11 DI12 DI13 DI14 DI15 DI16

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 035 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU-INPUT CARD REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 036
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

CARRIER SELECTOR
CARRIER CHANNEL FAIL TC-1 FAULTY TC-2 FAULTY 87L-RELAY FAULTY DIRECT TRIP RECEIVED DIRECT TRIP SEND
SWITCH IN POSITION

A A

B B
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

+1L3

/035.7C 1S101 1S101


/037.1C

C C

/035.7C 1S102 1S102


/037.1C

/018.6C

/018.6D
11 7 12 14 12 14 J11 13 13 9
IN
WD1 CSS

K153

K102
/047.5D OUT
COX 195X 295X 87L 14 RX
/017.4E /025.2D /025.5D /015.6D /017.6E

3 11 11 J12 5
D D

1S109

1S111

1S113
1S107

1S103

1S105

X-BCPU-DIU-N 1 2 3 4 5 6 7 8 9 10 11 12

BCPU-DIU200-SLOT-N

C264P 1 2 3 4 5 6 7 8 9 10 11 12
E BCPU E
SLOT-N
/029.3B

DI1 DI2 DI3 DI4 DI5 DI6 DI7 DI8

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 036 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU-INPUT CARD REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 037
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

TRIP RELAY-86 LBB TRIP RELAY-96


A/R INITIATION DIFF. PROTN. OPTD. MANUAL CLOSE MANUAL TRIP 86 TRIP RELAY SUPERVISION
OPERATED OPTD.

A A

B B

+1L3
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

/036.8C 1S101 1S101


/038.1C

C C
/036.8C 1S102 1S102
/038.1C

/020.5C

/020.5D
40 41 H7 H8 40 41 H10 H11 5 7

K401

K405
TRIP TRIP
RL4 RL4 RL4 RL5 AT AT
86 87L 96 87L 52CS AC 52CS AC
/047.3C CLOSE /047.3C CLOSE
/020.7C /015.4B /021.7C /015.4C 1
6 8
4 H9 4 H12 R86
3.3K
D D
2
1S121

1S115

1S119

1S139

1S123

1S125

K411
X-BCPU-DIU-N 13 14 15 16 17 18 19 20 21 22 23 24

BCPU-DIU200-SLOT-N

C264P 13 14 15 16 17 18 19 20 21 22 23 24
E BCPU E
SLOT-N
/029.3B

DI9 DI10 DI11 DI12 DI13 DI14 DI15 DI16

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 037 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU-INPUT CARD REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 038
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

(87L)DIFF.
CB TC-2 CKT. MCB ISOL. CTRL CKT. MCB
LBB TRIP RELAY 96 SUPVN. AC MCB TRIP PROTECTION RELAY CB TC-1 CKT. MCB TRIP AUX. RELAY CKT. MCB TRIP
TRIP TRIP
CKT. MCB TRIP

A A

B B

+1L3
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

X-BCPU-DIU-N 27

/037.8C 1S101 1S101


/039.1C

C /037.8C 1S102 1S102 C


/039.1C
/021.5D
/021.5C

12 14 12 14
12 14 12 14
P101

P103

MCB2 12 14 MCB7 12 14
/005.2E /006.1E
MCB91 MCB5
/004.5C /005.5E
1 11 MCB4 11 MCB6
/005.4E /005.6E
R96 11 11
D 3.3K 11 11 D
2
1S117

1S131

1S127

1S133

1S135

1S129
P105

X-BCPU-DIU-M 1 2 3 4 5 6 7 8 9 10 11 12

BCPU-DIU200-SLOT-M

C264P 1 2 3 4 5 6 7 8 9 10 11 12
E BCPU E
SLOT-M
/029.3B

DI1 DI2 DI3 DI4 DI5 DI6 DI7 DI8

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 038 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU-INPUT CARD REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 039
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FROM TRAFO -2 BAY
Version 1.0

MASTER TRIP RELAY CKT. LBB TRIP RELAY CKT.


AC SUPPLY FAIL TRAFO-2 TRAFO-2 EFS DC SOURCE-2 MCB EFS DC SOURCE-2 MCB
MCB TRIP MCB TRIP EFS FAULTY
HV DC SOURCE FAIL LV DC SOURCE FAIL TRIP TRIP

A A
+1TR2A

B B
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

+1L3

X201 X201 X201 X201 X201 X201


X-BCPU-DIU-M 25 22 23 27 24 25 26

/038.7C 1S101 1S101


/040.1C

C C

/038.7C 1S102 1S102


/040.1C

12 14 12 14 11 7

MCB8 MCB10 80AC


/006.2E /006.4E /004.5E

11 11 3

D D
1S137

1S141

1S143

1S163

1S171

1S165

1S167

1S169
X-BCPU-DIU-M 13 14 15 16 17 18 19 20 21 22 23 24

BCPU-DIU200-SLOT-M

C264P 13 14 15 16 17 18 19 20 21 22 23 24
E BCPU E
SLOT-M
/029.3B

DI9 DI10 DI11 DI12 DI13 DI14 DI15 DI16

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 039 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU-INPUT CARD REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 040
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE

A A

B B

+1L3
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

X-BCPU-DIU-L 25 X-BCPU-DIU-L 26

/039.7C 1S101 1S101


/041.1C

C /039.7C 1S102 1S102 C


/041.1C

D D

X-BCPU-DIU-L 1 2 3 4 5 6 7 8 9 10 11 12

BCPU-DIU200-SLOT-L

C264P 1 2 3 4 5 6 7 8 9 10 11 12
E BCPU E
SLOT-L
/029.3B

DI1 DI2 DI3 DI4 DI5 DI6 DI7 DI8

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 040 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU-INPUT CARD REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 041
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE

A A

B B

+1L3
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

X-BCPU-DIU-L 27

/040.7C 1S101 1S101

C /040.7C 1S102 1S102 C

D D

X-BCPU-DIU-L 13 14 15 16 17 18 19 20 21 22 23 24

BCPU-DIU200-SLOT-L

C264P 13 14 15 16 17 18 19 20 21 22 23 24
E BCPU E
SLOT-L
/029.3B

DI9 DI10 DI11 DI12 DI13 DI14 DI15 DI16

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 041 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU-INPUT CARD REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 042
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

DIR. OC / EF PROTN.
CB SYNCH CHECK AUTO RECLOSE DIFF. RELAY LED
86 TRIP RELAY RESET CB AUTO RECLOSE OPTD TO TRIP LBB OPERATED LBB TRIP RELAY RESET SPARE SPARE
PERMISSIVE LOCKOUT RESET
RELAY
+1L3
A A
C264P
BCPU
SLOT-D
/029.6B
DO1 DO2 DO3 DO4 DO5 DO6 DO7 DO8 DO9 DO10

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 19 20 21 22 23 24

BCPU-DOU201-SLOT-D
B B

X-BCPU-DOU-D
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 19 20 21 22 23 24

C C

P101A
K401

K409

K413

K405

K415

K405

P103

P101

P107

K103

K125
K27

K11
K9

K7
/022.4D

/020.6C

/022.5D

/020.2C

/020.3C

/021.3D

/021.6C

/014.3C
/020.6D

/020.2D

/020.3D

/021.6D

/014.3C
/022.4E

/022.5E

/021.3E
D D

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 042 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU-OUTPUT CARD REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 043
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

DEF PROTN OPTD TO ISOL. 89A I/L E/S 89AE I/L ISOL. 89L I/L E/S 89LE I/L BUS PT ISOL. 189 I/L BUS E/S 89BE I/L
CB REMOTE CLOSE CB REMOTE OPEN SPARE
DT SEND CKT. PERMISSIBLE PERMISSIBLE PERMISSIBLE PERMISSIBLE PERMISSIBLE PERMISSIBLE

A +1L3 A

C264P
BCPU
SLOT-E
/029.5B
DO1 DO2 DO3 DO4 DO5 DO6 DO7 DO8 DO9 DO10

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 19 20 21 22 23 24
B B

BCPU-DOU201-SLOT-E
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

X-BCPU-DOU-E 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 19 20 21 22 23 24
K803

K805

/006.2C K801 K801


/044.1C

C C
2 2

RAAS4F RAAS4F

K153

K705

K709

K713

K717

K721

K725
K151

K703

K707

K711

K715

K719

K723
52XC COIL 52XT COIL
.2D .2E
1 1
/018.5D

/026.2C

/026.4C

/026.6C

/026.8C

/027.2C

/027.4C
/018.5C

/026.3C

/026.4C

/026.7C

/026.8C

/027.3C

/027.4C
/006.2C K802 K802
/044.1D

52XC
2
COIL 1 .2C

SOTF INI. TO DIFF. PROTN. 11 /014.2C


D 7 3 D
REMOTE CLOSE 12 /022.4D
8 4

SPARE 13 /046.2B
9 5
SPARE 14 /046.3B
10 6

52XT
2
COIL 1 .2C

TO DIRECT TRIP SEND 11 /018.3D


7 3

REMOTE OPEN TO CB TC-1 12 /023.2C


8 4
E REMOTE OPEN TO CB TC-2 13
5 /024.3C E
9
SPARE 14 /046.6B
10 6

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 043 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU-OUTPUT CARD REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 044
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

ISO. 89A OPEN ISO. 89A CLOSE ISO. 89L OPEN ISO. 89L CLOSE ISO. 189 OPEN ISO. 189 CLOSE SPARE SPARE SPARE SPARE

A +1L3 A

C264P
BCPU
SLOT-F
/029.5B
DO1 DO2 DO3 DO4 DO5 DO6 DO7 DO8 DO9 DO10

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 19 20 21 22 23 24
B B

BCPU-DOU201-SLOT-F
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

X-BCPU-DOU-F 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 19 20 21 22 23 24
K807

K809

K811

K813

K815

K817
/043.2C K801

C C
A1 A1 A1 A1 A1 A1

89A-O COIL 89A-C COIL 89L-O COIL 89L-C COIL 189-O COIL 189-C COIL
.1D .2D .3D .4D .5D .6D
A2 A2 A2 A2 A2 A2

/043.2D K802

D D
89A-O 89A-C 89L-O 89L-C 189-O 189-C
A1 A1 A1 A1 A1 A1
COIL A2 .2C COIL A2 .2C COIL A2 .3C COIL A2 .4C COIL A2 .4C COIL A2 .5C

ISO. OPEN 12 12 12 12 12 12
14 11 /026.2D ISO. CLOSE 14 11 /026.2D ISO. OPEN
14 11 /026.6D ISO. CLOSE
14 11 /026.6D ISO. OPEN
14 11 /027.2D ISO. CLOSE
14 11 /027.2D

SPARE 22 SPARE 22 SPARE 22 SPARE 22 SPARE 22 SPARE 22


24 21 24 21 24 21 24 21 24 21 24 21

TO FAULT REC. SYS. 32 32 32 32 32 32


34 31 TO FAULT REC. SYS. 34 31 TO FAULT REC. SYS. 34 31 TO FAULT REC. SYS.
34 31 TO FAULT REC. SYS. 34 31 TO FAULT REC. SYS.
34 31
42 42 42 42 42 42
44 41 44 41 44 41 44 41 44 41 44 41

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 044 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU-OUTPUT CARD REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 045
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
TO TRAFO-1 BCPU-HV
Version 1.0

MAIN DC
DC SUPPLY FAIL EFS SOURCE-1 MCB FAIL EFS SOURCE-2 MCB FAIL EFS FAULTY
MCB TRIP

A A

+1L3

B B
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

5S101

11 7 12 14 12 14 12 14 4

C 80DC MCB9 MCB1 MCB11 EFS-B1 C


/006.7E /006.3E /005.1E /006.5E

3 11 11 11 6
5S153
5S151

5S155

5S157

5S159
X201 X201 X201 X201 X201 X201

14 18 19 20 21 28

D D
+1TR1A

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 045 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. CONTACT DISTRIBUTION REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 046
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+1L3
Version 1.0

A A

86 52XC COX RX CSS

70 71 80 81 13 9 14 10 13 9 14 10 14 10 14 10 11 15
IN IN
RL7 RL8 OUT OUT
52XT /047.5D /047.5D
12 16
/020.7C /020.7C /043.2D /043.2D /017.4E /017.4E /017.6E /043.2E

7 8 5 6 5 6 6 6
U9

U10

U11

U12

U13

U14

U15

U16

U17

U18

U19

U20

U21

U22

U23

U24

U25

U26

U27

U28
B X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 B
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

80DC 87L 80AC


12 8 13 9 H16 H17 G1 G3 G5 G7 G8 80 81 12 8 13 9 12 8
C C
RL7 RL8 RL9 RL10 RL11 RL8
96 85X
/006.7E /006.7E /015.4C /015.6A /015.6B /015.6B /015.6B /021.7C /004.5E /004.5E /017.2E

4 5 H18 G2 G4 G6 G9 8 4 5 4
U29

U30

U31

U32

U33

U34

U35

U36

U37

U38

U39

U40

U41

U42

U43

U44

U45

U46

U47

U48

U49

U50
X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7
29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

D D

195 295 21X


22 24 32 34 22 24 32 34 30 31 40 41 H13 H14
RL6
195X 195X 295X 295X 87L
/025.2D /025.2D /025.5D /025.5D /019.6C /019.6C /015.4C

E 21 31 21 31 3 4 H15 E
U51

U52

U53

U54

U55

U56

U57

U58

U59

U60

U61

U62

U63

U64
X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7 X7
51 52 53 54 55 56 57 58 59 60 61 62 63 64

GENERAL TRIP TO
TEST KIT

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 046 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. SPARE CONTACTS DISTRIBUTION REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 047
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

A A

+1L3

B B
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

52CS

CLOSE
CSS

TRIP

AC
AT

OUT
IN
SOTF INITIATION TO 87L 1 2 /014.2C
TO CARRIER RECEIVE CKT 1 2 /017.2D
TO CB TRIP TO TC-1 CKT 3 4 /023.3C
CARRIER SW. IN OUT POSITION TO 21 3 4 /014.4C
CB MANUAL CLOSE TO BCPU 5 6 /037.5D
C C
TO CARRIER SEND CKT 5 6 /017.5D
CB MANUAL TRIP TO BCPU 7 8 /037.6D
TO CARRIER OUT OF SERVICE 7 8 /017.3D
TO CB CLOSING CKT 9 10 /022.4B
TO DIRECT TRIP IN CKT 9 10 /017.6D
CB TRIP TO DT SEND CKT 11 12 /018.4D
SPARE CKT 11 12 /046.7A
13 14
SWITCH 'IN' POSITION TO BCPU 13 14 /036.5D
CB REMOTE TRIP TO TC-2 CKT 15 16 /024.3C
SPARE CKT 15 16 /046.7A
17 18
D D
19 20

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 047 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. SWITCH CONTACT DISTRIBUTION REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 048
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

A A

B B
+1L3
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

BLKA BLKB BLKC


S1 R1 S1 R1 S1 R1 /031.4A

S2 R2 /013.1B S2 R2 /013.1E S2 R2 /031.4B

S3 R3 /011.3B S3 R3 /012.6B S3 R3 /031.4B


C C
S4 R4 /011.3C S4 R4 /012.6C S4 R4 /031.4C

S5 R5 /011.3C S5 R5 /012.6C S5 R5 /031.4C

S6 R6 /011.3D S6 R6 /012.6C S6 R6 /031.4D

S7 R7 /020.2C S7 R7 S7 R7 /031.4D

S8 R8 /019.5B S8 R8 S8 R8 /031.4D

S9 R9 S9 R9 /023.5B S9 R9 /031.4E

S10 R10 S10 R10 /024.5B S10 R10 /031.4E

D D

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 048 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. TEST BLOCK DISTRIBUTION REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 049
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

A A

ISOLATOR INTERLOCK: .89A . 9L


ISOLATOR INTERLOCK: 8

89AE BUS E/SW. OPEN


& 89A INTERLOCK PERMISSIVE 52 OPEN
52 OPEN & 89L INTERLOCK PERMISSIVE
89LE OPEN

B B

& 89L OPEN ORDER


& 89A OPEN ORDER 89L OPEN REQUEST
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

89A OPEN REQUEST

& 89L CLOSE ORDER


& 89A CLOSE ORDER 89L CLOSE REQUEST
89A CLOSE REQUEST

C C

EARTHSWITCH INTERLOCK: 89AE


. . 9LE
ISOLATOR INTERLOCK: 8
D D
89L OPEN
89A OPEN & 89AE INTERLOCK PERMISSIVE & 89LE INTERLOCK PERMISSIVE
@ DEAD LINE(UNDER VOLTAGE OPERATED)
FROM 21 RELAY

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 049 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU INTERLOCK LOGICS REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 050
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

A A

ISOLATOR INTERLOCK: .89A-BPT

89AE BUS E/SW. OPEN & 89A-BPT INTERLOCK PERMISSIVE

B B

& 89A-BPT OPEN ORDER


This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

89A-BPT OPEN REQUEST

& 89A-BPT CLOSE ORDER


89A-BPT CLOSE REQUEST

C C

EARTHSWITCH INTERLOCK: 89AE


.
D D
LINE-1 89A OPEN

TRAFO-1 89A OPEN


& 89AE INTERLOCK PERMISSIVE
TRAFO-2 89A OPEN

FUTURE BAY ISOL.89 (IF ANY)

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 050 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU INTERLOCK LOGICS REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 051
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

CIRCUIT BREAKER REMOTE OPERATION :52


A A

PROTECTION TRIP RELAYS OPERATED


&
LBB TRIP RELAY OPERATED

CB TC-1 HEALTHY &


&
CB TC-2 HEALTHY

B DEAD LINE CHARGING MODE B


&
DEAD LINE
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

>=
& 52 CLOSE ORDER
LIVE LINE CHARGING MODE

SYNCHRO CHECK (LIVE LINE/LIVE BUS;


&
LIVE LINE/DEAD BUS; DEAD LINE/LIVE BUS)

52 CLOSE REQUEST
C C
52 REMOTE MODE

52 OPEN REQUEST & 52 OPEN ORDER-1

52 OPEN ORDER-2

D D
CIRCUIT BREAKER A/R LOCKOUT:52

A/R INITIATION
& A/R LOCKOUT
CARRIER FAIL/OUT OF SERVICE
>=
BCPU A/R OFF

E E

A/R BLOCK

86 TRIP RELAY OPTD.


>= A/R BLOCK
96 LBB TRIP RELAY OPTD.

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 051 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. BCPU INTERLOCK LOGICS REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 052
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

+1L3

TAG REF TAG REF


A X200 : 1 /010.3D X201 : 1 /021.2B A
X200 : 2 /010.3E X201 : 2 /021.2B
X200 : 3 /010.3E X201 : 3 /021.4B
X200 : 4 /010.3E X201 : 4
X200 : 5 /012.2B X201 : 5
X200 : 6 /012.2C X201 : 6
X200 : 7 /012.2C X201 : 7
X200 : 8 /012.2C X201 : 8
X201 : 9
X201 : 10
X201 : 11
X201 : 12
X201 : 13
B B
X201 : 14 /045.1D
X201 : 15
X201 : 16
X201 : 17
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

X201 : 18 /045.2D
X201 : 19 /045.3D
X201 : 20 /045.4D
X201 : 21 /045.5D
X201 : 22 /039.3C
X201 : 23 /039.4C
X201 : 24 /039.5C
X201 : 25 /039.6C
C X201 : 26 /039.7C C
X201 : 27 /039.5C
X201 : 28 /045.5D

D D

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 052 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. TERMINAL BLOCK DISTRIBUTION REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 053
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

+1L3

TAG REF TAG REF TAG REF TAG REF TAG REF TAG REF TAG REF TAG REF
A X1 : 1 /004.3B X2 : 1 /008.5A X3 : 1 /007.4B X4 : 1 /013.2B X5 : 1 /023.1E X6 : 1 /026.1D X7 : 1 /028.6C X7 : 51 /046.1E A
X1 : 2 /004.3B X2 : 2 /008.5A X3 : 2 /007.4B X4 : 2 /013.2B X5 : 2 /023.1E X6 : 2 /026.1D X7 : 2 /028.6C X7 : 52 /046.1E
X1 : 3 /005.1B X2 : 3 /008.5B X3 : 3 /007.4B X4 : 3 /013.3B X5 : 3 /022.3E X6 : 3 /026.1D X7 : 3 /028.7C X7 : 53 /046.2E
X1 : 4 /005.1B X2 : 4 /008.5B X3 : 4 /007.4C X4 : 4 /014.5B X5 : 4 /022.4C X6 : 4 /026.2D X7 : 4 /028.7C X7 : 54 /046.2E
X1 : 5 /006.6D X2 : 5 /008.5B X3 : 5 /007.4D X4 : 5 /014.5C X5 : 5 /022.4C X6 : 5 /026.2D X7 : 5 /028.6D X7 : 55 /046.2E
X1 : 6 /006.6D X2 : 6 /008.5B X3 : 6 /007.4D X4 : 6 /014.6C X5 : 6 /022.4E X6 : 6 /026.2D X7 : 6 /028.6D X7 : 56 /046.3E
X1 : 7 SPARE X2 : 7 /008.5C X3 : 7 /007.4D X4 : 7 /014.7B X5 : 7 /022.5E X6 : 7 /026.3D X7 : 7 /028.7D X7 : 57 /046.3E
X1 : 8 SPARE X2 : 8 /008.5C X3 : 8 /007.4E X4 : 8 /014.6C X5 : 8 /023.2E X6 : 8 /026.4D X7 : 8 /028.7D X7 : 58 /046.3E
X2 : 9 /008.5D X3 : 9 /010.3C X4 : 9 /014.7C X5 : 9 /023.2E X6 : 9 /026.4D X7 : 9 /046.1B X7 : 59 /046.4E
X2 : 10 /008.5D X3 : 10 /010.3D X4 : 10 /017.2B X5 : 10 /023.7E X6 : 10 /026.5D X7 : 10 /046.1B X7 : 60 /046.4E
X2 : 11 /008.5D X3 : 11 /010.3D X4 : 11 /017.2B X5 : 11 /023.7E X6 : 11 /026.5D X7 : 11 /046.2B X7 : 61 /046.4E
X2 : 12 /008.5D X3 : 12 /010.3D X4 : 12 /017.3B X5 : 12 /023.6E X6 : 12 /026.5D X7 : 12 /046.2B X7 : 62 /046.5E
X2 : 13 /008.5E X3 : 13 /012.2A X4 : 13 /017.5B X5 : 13 /023.5C X6 : 13 /026.6D X7 : 13 /046.2B X7 : 63 /046.5E
B B
X2 : 14 /008.5E X3 : 14 /012.2B X4 : 14 /017.5B X5 : 14 /023.5C X6 : 14 /026.6D X7 : 14 /046.3B X7 : 64 /046.6E
X2 : 15 /008.5E X3 : 15 /012.2B X4 : 15 /017.6B X5 : 15 /024.1E X6 : 15 /026.6D X7 : 15 /046.3B X7 : 65 SPARE
X2 : 16 /008.5E X3 : 16 /012.2B X4 : 16 /017.7B X5 : 16 /024.1E X6 : 16 /026.7D X7 : 16 /046.3B X7 : 66 SPARE
X2 : 17 /009.5B X3 : 17 SPARE X4 : 17 /018.6B X5 : 17 /024.2E X6 : 17 /026.8D X7 : 17 /046.4B X7 : 67 SPARE
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

X2 : 18 /009.5C X3 : 18 SPARE X4 : 18 /018.7B X5 : 18 /024.3E X6 : 18 /026.8D X7 : 18 /046.4B X7 : 68 SPARE


X2 : 19 /009.5C X3 : 19 SPARE X4 : 19 /018.5D X5 : 19 /024.7E X6 : 19 /027.1D X7 : 19 /046.4B X7 : 69 SPARE
X2 : 20 /009.5C X3 : 20 SPARE X4 : 20 /018.5D X5 : 20 /024.7E X6 : 20 /027.1D X7 : 20 /046.5B X7 : 70 SPARE
X2 : 21 /009.5C X4 : 21 /020.4C X5 : 21 /024.6E X6 : 21 /027.2D X7 : 21 /046.5B X7 : 71 SPARE
X2 : 22 /009.5D X4 : 22 /020.5C X5 : 22 /024.5C X6 : 22 /027.2D X7 : 22 /046.6B X7 : 72 SPARE
X2 : 23 /009.5D X4 : 23 /021.4B X5 : 23 /024.5C X6 : 23 /027.2D X7 : 23 /046.6B X7 : 73 SPARE
X2 : 24 /009.5D X4 : 24 /021.4B X5 : 24 SPARE X6 : 24 /027.2D X7 : 24 /046.6B X7 : 74 SPARE
X2 : 25 /011.7D X4 : 25 /028.3B X5 : 25 SPARE X6 : 25 /027.3D X7 : 25 /046.7B X7 : 75 SPARE
C X2 : 26 /011.7D X4 : 26 /028.3C X5 : 26 SPARE X6 : 26 /027.4D X7 : 26 /046.7B X7 : 76 SPARE C
X2 : 27 /011.7D X4 : 27 /028.4B X5 : 27 SPARE X6 : 27 /027.4D X7 : 27 /046.7B X7 : 77 SPARE
X2 : 28 /011.7D X4 : 28 /028.4C X5 : 28 SPARE X6 : 28 SPARE X7 : 28 /046.8B X7 : 78 SPARE
X2 : 29 SPARE X4 : 29 SPARE X6 : 29 SPARE X7 : 29 /046.1D
X2 : 30 SPARE X4 : 30 SPARE X6 : 30 SPARE X7 : 30 /046.1D
X2 : 31 SPARE X4 : 31 SPARE X6 : 31 SPARE X7 : 31 /046.2D
X2 : 32 SPARE X4 : 32 SPARE X6 : 32 SPARE X7 : 32 /046.2D
X2 : 33 SPARE X4 : 33 SPARE X6 : 33 SPARE X7 : 33 /046.2D
X2 : 34 SPARE X4 : 34 SPARE X6 : 34 SPARE X7 : 34 /046.3D
X6 : 35 SPARE X7 : 35 /046.3D
X7 : 36 /046.3D
X7 : 37 /046.4D
D X7 : 38 /046.4D D
X7 : 39 /046.4D
X7 : 40 /046.4D
X7 : 41 /046.5D
X7 : 42 /046.5D
X7 : 43 /046.5D
` X7 : 44 /046.6D
X7 : 45 /046.6D
X7 : 46 /046.6D
X7 : 47 /046.7D
X7 : 48 /046.7D
X7 : 49 /046.7D
X7 : 50 /046.8D
E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 053 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. TERMINAL BLOCK DISTRIBUTION REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 054
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

+1L3

TAG REF TAG REF TAG REF TAG REF TAG REF TAG REF
A X-BCPU-DIU-L : 1 /040.2D X-BCPU-DIU-M : 1 /038.2D X-BCPU-DIU-N : 1 /036.2D X-BCPU-DIU-O : 1 /034.2D X-BCPU-DIU-P : 1 /032.2D X-BCPU-DOU-D : 1 /042.1B A
X-BCPU-DIU-L : 2 /040.2D X-BCPU-DIU-M : 2 /038.2D X-BCPU-DIU-N : 2 /036.2D X-BCPU-DIU-O : 2 /034.2D X-BCPU-DIU-P : 2 /032.2D X-BCPU-DOU-D : 2 /042.2B
X-BCPU-DIU-L : 3 /040.3D X-BCPU-DIU-M : 3 /038.3D X-BCPU-DIU-N : 3 /036.3D X-BCPU-DIU-O : 3 /034.3D X-BCPU-DIU-P : 3 /032.3D X-BCPU-DOU-D : 3 /042.2B
X-BCPU-DIU-L : 4 /040.3D X-BCPU-DIU-M : 4 /038.3D X-BCPU-DIU-N : 4 /036.3D X-BCPU-DIU-O : 4 /034.3D X-BCPU-DIU-P : 4 /032.3D X-BCPU-DOU-D : 4 /042.2B
X-BCPU-DIU-L : 5 /040.4D X-BCPU-DIU-M : 5 /038.4D X-BCPU-DIU-N : 5 /036.4D X-BCPU-DIU-O : 5 /034.4D X-BCPU-DIU-P : 5 /032.4D X-BCPU-DOU-D : 5 /042.3B
X-BCPU-DIU-L : 6 /040.4D X-BCPU-DIU-M : 6 /038.4D X-BCPU-DIU-N : 6 /036.4D X-BCPU-DIU-O : 6 /034.4D X-BCPU-DIU-P : 6 /032.4D X-BCPU-DOU-D : 6 /042.3B
X-BCPU-DIU-L : 7 /040.5D X-BCPU-DIU-M : 7 /038.5D X-BCPU-DIU-N : 7 /036.5D X-BCPU-DIU-O : 7 /034.5D X-BCPU-DIU-P : 7 /032.5D X-BCPU-DOU-D : 7 /042.3B
X-BCPU-DIU-L : 8 /040.5D X-BCPU-DIU-M : 8 /038.5D X-BCPU-DIU-N : 8 /036.5D X-BCPU-DIU-O : 8 /034.5D X-BCPU-DIU-P : 8 /032.5D X-BCPU-DOU-D : 8 /042.4B
X-BCPU-DIU-L : 9 /040.6D X-BCPU-DIU-M : 9 /038.6D X-BCPU-DIU-N : 9 /036.6D X-BCPU-DIU-O : 9 /034.6D X-BCPU-DIU-P : 9 /032.6D X-BCPU-DOU-D : 9 /042.4B
X-BCPU-DIU-L : 10 /040.6D X-BCPU-DIU-M : 10 /038.6D X-BCPU-DIU-N : 10 /036.6D X-BCPU-DIU-O : 10 /034.6D X-BCPU-DIU-P : 10 /032.6D X-BCPU-DOU-D : 10 /042.4B
X-BCPU-DIU-L : 11 /040.7D X-BCPU-DIU-M : 11 /038.7D X-BCPU-DIU-N : 11 /036.7D X-BCPU-DIU-O : 11 /034.7D X-BCPU-DIU-P : 11 /032.7D X-BCPU-DOU-D : 11 /042.5B
X-BCPU-DIU-L : 12 /040.7D X-BCPU-DIU-M : 12 /038.7D X-BCPU-DIU-N : 12 /036.7D X-BCPU-DIU-O : 12 /034.7D X-BCPU-DIU-P : 12 /032.7D X-BCPU-DOU-D : 12 /042.5B
X-BCPU-DIU-L : 13 /041.2D X-BCPU-DIU-M : 13 /039.2D X-BCPU-DIU-N : 13 /037.2D X-BCPU-DIU-O : 13 /035.2D X-BCPU-DIU-P : 13 /033.2D X-BCPU-DOU-D : 13 /042.5B
B B
X-BCPU-DIU-L : 14 /041.2D X-BCPU-DIU-M : 14 /039.2D X-BCPU-DIU-N : 14 /037.2D X-BCPU-DIU-O : 14 /035.2D X-BCPU-DIU-P : 14 /033.2D X-BCPU-DOU-D : 14 /042.6B
X-BCPU-DIU-L : 15 /041.3D X-BCPU-DIU-M : 15 /039.3D X-BCPU-DIU-N : 15 /037.3D X-BCPU-DIU-O : 15 /035.3D X-BCPU-DIU-P : 15 /033.3D X-BCPU-DOU-D : 15 /042.6B
X-BCPU-DIU-L : 16 /041.3D X-BCPU-DIU-M : 16 /039.3D X-BCPU-DIU-N : 16 /037.3D X-BCPU-DIU-O : 16 /035.3D X-BCPU-DIU-P : 16 /033.3D X-BCPU-DOU-D : 16 /042.6B
X-BCPU-DIU-L : 17 /041.4D X-BCPU-DIU-M : 17 /039.4D X-BCPU-DIU-N : 17 /037.4D X-BCPU-DIU-O : 17 /035.4D X-BCPU-DIU-P : 17 /033.4D X-BCPU-DOU-D : 17 SPARE
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

X-BCPU-DIU-L : 18 /041.4D X-BCPU-DIU-M : 18 /039.4D X-BCPU-DIU-N : 18 /037.4D X-BCPU-DIU-O : 18 /035.4D X-BCPU-DIU-P : 18 /033.4D X-BCPU-DOU-D : 18 SPARE
X-BCPU-DIU-L : 19 /041.5D X-BCPU-DIU-M : 19 /039.5D X-BCPU-DIU-N : 19 /037.5D X-BCPU-DIU-O : 19 /035.5D X-BCPU-DIU-P : 19 /033.5D X-BCPU-DOU-D : 19 /042.7B
X-BCPU-DIU-L : 20 /041.5D X-BCPU-DIU-M : 20 /039.5D X-BCPU-DIU-N : 20 /037.6D X-BCPU-DIU-O : 20 /035.5D X-BCPU-DIU-P : 20 /033.5D X-BCPU-DOU-D : 20 /042.7B
X-BCPU-DIU-L : 21 /041.6D X-BCPU-DIU-M : 21 /039.6D X-BCPU-DIU-N : 21 /037.6D X-BCPU-DIU-O : 21 /035.6D X-BCPU-DIU-P : 21 /033.6D X-BCPU-DOU-D : 21 /042.7B
X-BCPU-DIU-L : 22 /041.6D X-BCPU-DIU-M : 22 /039.6D X-BCPU-DIU-N : 22 /037.6D X-BCPU-DIU-O : 22 /035.6D X-BCPU-DIU-P : 22 /033.6D X-BCPU-DOU-D : 22 /042.7B
X-BCPU-DIU-L : 23 /041.7D X-BCPU-DIU-M : 23 /039.7D X-BCPU-DIU-N : 23 /037.7D X-BCPU-DIU-O : 23 /035.7D X-BCPU-DIU-P : 23 /033.7D X-BCPU-DOU-D : 23 /042.8B
X-BCPU-DIU-L : 24 /041.7D X-BCPU-DIU-M : 24 /039.7D X-BCPU-DIU-N : 24 /037.7D X-BCPU-DIU-O : 24 /035.7D X-BCPU-DIU-P : 24 /033.7D X-BCPU-DOU-D : 24 /042.8B
X-BCPU-DIU-L : 25 /040.2B X-BCPU-DIU-M : 25 /039.1C X-BCPU-DIU-N : 25 SPARE X-BCPU-DIU-O : 25 /034.1C X-BCPU-DIU-P : 25 /032.1C
C X-BCPU-DIU-L : 26 /040.6B X-BCPU-DIU-M : 26 SPARE X-BCPU-DIU-N : 26 SPARE X-BCPU-DIU-O : 26 /034.3C X-BCPU-DIU-P : 26 /033.4C C
X-BCPU-DIU-L : 27 /041.2B X-BCPU-DIU-M : 27 SPARE X-BCPU-DIU-N : 27 /038.6B X-BCPU-DIU-O : 27 /034.6C X-BCPU-DIU-P : 27 /033.7C
X-BCPU-DIU-L : 28 SPARE X-BCPU-DIU-M : 28 SPARE X-BCPU-DIU-N : 28 SPARE X-BCPU-DIU-O : 28 /035.1C X-BCPU-DIU-P : 28 SPARE
X-BCPU-DIU-L : 29 SPARE X-BCPU-DIU-M : 29 SPARE X-BCPU-DIU-N : 29 SPARE X-BCPU-DIU-O : 29 /035.4C X-BCPU-DIU-P : 29 SPARE
X-BCPU-DIU-L : 30 SPARE X-BCPU-DIU-M : 30 SPARE X-BCPU-DIU-N : 30 SPARE X-BCPU-DIU-O : 30 /035.6C X-BCPU-DIU-P : 30 SPARE

D D

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 054 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. TERMINAL BLOCK DISTRIBUTION REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: 055
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Version 1.0

+1L3

TAG REF TAG REF TAG REF


A X-BCPU-DOU-E : 1 /043.1B X-BCPU-PS-A : 1 /030.6D X-BCPU-DOU-F : 1 /044.1B A
X-BCPU-DOU-E : 2 /043.2B X-BCPU-PS-A : 2 /030.6D X-BCPU-DOU-F : 2 /044.2B
X-BCPU-DOU-E : 3 /043.2B X-BCPU-PS-A : 3 /030.3D X-BCPU-DOU-F : 3 /044.2B
X-BCPU-DOU-E : 4 /043.2B X-BCPU-PS-A : 4 /030.3D X-BCPU-DOU-F : 4 /044.2B
X-BCPU-DOU-E : 5 /043.3B X-BCPU-PS-A : 5 /030.7D X-BCPU-DOU-F : 5 /044.3B
X-BCPU-DOU-E : 6 /043.3B X-BCPU-PS-A : 6 /030.7D X-BCPU-DOU-F : 6 /044.3B
X-BCPU-DOU-E : 7 /043.3B X-BCPU-PS-A : 7 /030.5D X-BCPU-DOU-F : 7 /044.3B
X-BCPU-DOU-E : 8 /043.4B X-BCPU-PS-A : 8 /030.5D X-BCPU-DOU-F : 8 /044.4B
X-BCPU-DOU-E : 9 /043.4B X-BCPU-PS-A : 9 /030.5D X-BCPU-DOU-F : 9 /044.4B
X-BCPU-DOU-E : 10 /043.4B X-BCPU-PS-A : 10 SPARE X-BCPU-DOU-F : 10 /044.4B
X-BCPU-DOU-E : 11 /043.5B X-BCPU-DOU-F : 11 /044.5B
X-BCPU-DOU-E : 12 /043.5B X-BCPU-DOU-F : 12 /044.5B
X-BCPU-DOU-E : 13 /043.6B X-BCPU-DOU-F : 13 /044.6B
B B
X-BCPU-DOU-E : 14 /043.6B X-BCPU-DOU-F : 14 /044.6B
X-BCPU-DOU-E : 15 /043.6B X-BCPU-DOU-F : 15 /044.6B
X-BCPU-DOU-E : 16 /043.6B X-BCPU-DOU-F : 16 /044.6B
X-BCPU-DOU-E : 17 SPARE X-BCPU-DOU-F : 17 SPARE
This document is the exclusive property of Schneider Electric and shall not be used, copied or communicated to third parties without prior authorization.

X-BCPU-DOU-E : 18 SPARE X-BCPU-DOU-F : 18 SPARE


X-BCPU-DOU-E : 19 /043.7B X-BCPU-DOU-F : 19 /044.7B
X-BCPU-DOU-E : 20 /043.7B X-BCPU-DOU-F : 20 /044.7B
X-BCPU-DOU-E : 21 /043.7B X-BCPU-DOU-F : 21 /044.7B
X-BCPU-DOU-E : 22 /043.8B X-BCPU-DOU-F : 22 /044.8B
X-BCPU-DOU-E : 23 /043.8B X-BCPU-DOU-F : 23 /044.8B
X-BCPU-DOU-E : 24 /043.8B X-BCPU-DOU-F : 24 /044.8B

C C

D D

E E

F CUSTOMER : TELANGANA STATE TRANS. CORP. LTD. CONTRACTOR:STERLING AND WILSON PVT. LTD, MUMBAI. TITLE : 132KV LINE CONTROL & PROTECTION PANEL PREPARED : MK REVISION: A SHT : 055 F
WITH LINE DIFFERENTIAL PROTECTION
PROJECT : DEVELOPMENT OF 50 MW SOLAR POWER PLANT CLIENT:SURYAKIRAN RENEWABLE RESOURCES PVT. LTD. TERMINAL BLOCK DISTRIBUTION REVIEWED : DSS
DATE: 23-02-2017
AT SERIPALLE (KM PALLY) TELANGANA (INDIA) APPROVED : RVN CONT: NIL
PO. No.& Date: SW/SKYPOWER/2401-C,DATED:24.01.2017
PANEL TYPE : +1L3 DRG. NO.: IN-8023274-S-01
1 2 3 4 5 6 7 8

S-ar putea să vă placă și