Sunteți pe pagina 1din 7
TECHNICAL DATA SHEET (To 8 FILLED UP By THE MANUFACTURER /BIDDER) Page 1 of8 DETAILS / PARTS (GCGI TECHNICAL REQUIREMENTS BID OFFER — 1.0 Design Specification Shell and Tube Type HE 14 Shell ide a Fluid 'sove a2 COMPLY b. Quantity om COMPLY c.Inlet Temperature esc COMPLY 4. Outlet Temperature 45c COMPLY e ure Drop 4.0mmbg 4.0mAq 4. Design Pressure 124g/en? @ COMPLY g. Test Pressure ‘18kgiem? G COMPLY h. Design Temperature 7c COMPLY a vgeay o.49/s60 COMPLY 7 No.of passes a COMPLY (Kon 41, ManufactureiBidder by using ONLY. sments of EDC on the column marked 1 "FOLLOWED". Symbols oF chi such as “DITTO” of MARKS are NOT ACCEPTABLE, Should the Bieder deviate fom the requirements of EDX tsk ‘he space provided. Supporting documentation must be provided 2. Incase the provided spaces are nat enough, use additonal sheet and indicate “SEE ATTACHED" on the space provided 3. Unless otherwise speci requirements are brand new and the specifications stated above are the minimum. ID OFFER: UOTATION indicate the exact offer on 4 Failure to provide the necessary information/data required inthis Technical Data Sheet may cause the disqualification of bid. Bidder's Name: KOKUSAI COMMERCE CO., LTD Authorized Signatory: TOSHINARI KAWAHARA __ Authorized Signatory: KATSUTOSHI SHOJI Manufacturer's Name: FUJI ELECTRIC CO., LTD. Designation: MANAGER Designation: GENERAL MANAGER Date: FFB? 101 Dat a FOR GREEN CORE GEOTHERMAL, ING. USE ONLY Decora Tie RS) Cog | SEN CORE GPOTHERMAL ING: TURBINE OIL COOLER Shell and Tube type Heat Exchanger; 71m! Tao = Sean Fave | Papmnay_| — edad oy [Rape MuMerculo | GET Maniac | WC Audion TECHNICAL DATA SHEET (10 Be FILLED UP BY THE MANUFACTURER / BIDDER) Page 2 of 6 [ DETAILS / PARTS [_scei TecHNicAl REQUIREMENTS SID OFFER 12 Tube side | a. Fluid CT. Water COMPLY [ b. Quantity 123m‘/H 120m3/h net Tempurature 3580 CaRLY d, Outlet Temperature 37.7C COMPLY e. Pressure Drop 3.0 mmHg, 3.0mAq f. Design Pressure ‘Skglom? G COMPLY g. Test Pressure 7.5kglom? G COMPLY | __h_ Design Temperature wc COMPLY | 7 veloaty ian COMPLY al 7 Wo. of passes i COMPLY 1.3 Capacity 322980 koa COMPLY 1.4 Surface Area Tm? COMPLY 1.5 Volume (m*) 0.902 COMPLY (NoTEs:, a 1. ManufecturerBider shal cat ts compliance tote Technical Requremerts of EDG on te colzmn mared BID OFFER aii te NOTAGEEPTABLE Steud to Bote es Toss Pr Ee a fe UTA TION the space provided, Supporting documentation must be provided, 2, Incase the provided spaces are not enough, use addtional sheet and indicate “SEE ATTACHED’ on the space provided. 3. Unless otherwise specified, requirements are brand new and the specifications stated above are the minimum. 4, Failure to provide the necessary information/data required in this Technical Data Sheet may cause the disqualification of bid Bidders Name: KOKUSAI COMMERCE CO.,LTD Manufacturer's Name: FUJI ELECTRIC CO, LTD. Authorized Signatory: TOSHINARI KAWAHARA Authorized Signatory: KATSUTOSHI SHOJI Designation: MANAGER Designation: __GENERAL MANAGER | Slonatuw: 2 Signature Date Date Febranry 2), 20) 7 FOR GREEN CORE GEOTHERMAL, INC. USE ONLY Dosiment Tie TURBINE OIL COOLER Shell and Tube type Heat Exchange Revion Date Deserpion PRNanber | Preparedby | Checked by | Approved by ML Merculo | GETMatulac | WC Auditor GREEN CORE GEOTHERMAL, INC. oon NIGBU- PALINPINON TECHNICAL DATA SHEET (10 Be FILLED UP BY THE MANUFACTURER / BIDDER) Page 3.of6 DETAILS | PARTS {GCGI TECHNICAL REQUIREMENTS BID OFFER 1.6 Weight (dry). 2170 kg COMPLY 1.7 Weight (wet) S070 kg COMPLY 2.0 Material Specification “eI 2: Tube usa0sTe.AC COMPLY Zi 2.2 Tube Sheet ‘SUS304 COMPLY 2.3 Floating Tube sheet susso4 COMPLY 2.4 Shell (9mm thick) ‘SS41P ‘SS400P | 2.5 Water Chamber (fm thick) SUSaO4L COMPLY. 26 Water Chamber (5mm thick) sussoa COMPLY 2.7 Cover ‘SUS304 COMPLY 2.8 Buffle Plate ss4iP SS400P 2.9 Buffl | ‘SGP3/4B COMPLY 2.10 Spacer spas COMPLY 2.11 Te rod and nut ‘$8418 Din. 1,12 SS400B Dia. 12M12 [Nores: 1, Manufacturer/Bidder shal bby using ONLY ED". §) F characte “DITTO” chical Requirements of EDC on the column marked "BID OFFER’ QUOTATION MARKS are NOT ACCEPTABLE. Should the Bidder deviate from the requiremenls of EDC, i snall Indicate the exact offer on the space provided. Supporting documentation must be provided. 2, Incase the provided spaces are not enough, use additional sheet and indicate “SEE ATTACHED" on the space provided. 3. Unless otherwise specified, requirements are brand new and the specifications stated above are the minimum, 4. Failure to provide the necessary information/data required in this Technical Data Sheet may cause the disqualification of bid Bidiers Name: KOKUSAI COMMERCE CO.,LTD Manufeetuer’s Name: FUJI ELECTRIC CO., LTD. Authorized Signatory: _ TOSHINART KAWAHARA Authorized Signatory: KATSUTOSHI SHOJI Febraar; Designation MANAGER Designation. GENERAL MANAGER Signature: Zo. Signature: Date FEB.21. 2017 Date 21291] FOR GREEN CORE GEOTHERMAL, INC, USE ONLY GREEN CORE GEOTHERMAL, INC. Document Tale ug GED RATINGS TURBINE OIL COOLER Shell and Tube type Heat Exchanger; 71m? Tem Sa Deamon PR Namba] Prparedy | —Chectnd by | Tonreved by Mu Mercuto | GETNtulac | WC Avior TECHNICAL DATA SHEET (ro Be FILLED UP BY THE MANUFACTURER / BIDDER) Page 40f6 [ DETAILS / PARTS ‘GCGI TECHNICAL REQUIREMENTS BID OFFER 2.42 Spacer ssuiP COMPLY 2.13 Packing NITRILE BUTADIENE RUBBER COMPLY 2.14 Packing CHLOROPRENE RUBBER COMPLY 2.15 Packing CCHLOROPRENE RUBBER COMPLY 218 ang - NITRILE BUTADIENE RUBBER COMPLY 2.47 Base set ss400 2.8 Plug ‘SUS304 18. COMPLY. 2.49 Plug 88904 %8 S400 1/2B 2.20 Stud Bolt 841 M24 175 ss400 M24x175 2.24 Stud Bolt 8961 Ma4x700 $8400 M24X160 2.2 Bolt ‘8841 M24 X 90 $8400 M24x90 223 Bolt ~ss41 wea x80 $8400 M24X80 2.24 Jack bolt S841 M16 X40 $8400 M16X40 2.25 Nut S41 Mas $8400 M24 Pe 2.20 Eye bolt ssi M10 $8400 M10 NOTES: ] 1. ManufacturerBidder shal indicate is compliance to the Technical Requirements of EDC on the column marked "BID OFFER" by using 1e_words “COMPLY” or “FOLLOWED”. Symbols or characters such as “DITTO” or QUOTATION MARKS are NOT ACCEPTABLE. Should the Bidder deviate rom the requirements of EOC, i shallindate the exact offer on the space provided. Supporting documentation must be provided. 2, Incase the provided spaces are not enough, use additonal sheet and indicate “SEE ATTACHED" on the space provided, 3. Unless otherwise specified, requirements are brand new and the specifications stated above are the minimum. 4. Failure to provide the necessary information'data required inthis Technical Data Sheet may cause the disqualification of bid. Bidders Name:_ KOKUSAI COMMERCE CO.,LTD Manufacturer's Name: FUJI ELECTRIC CO., LTD. Authorized Signatory: TOSHINARI KAWAHARA Authorized Signatory: _ KATSUTOSHI SHOJI Designation MANAGER Designation: MANAGER ‘Signature: he Signature: Late? “ Dat: Fen aaah ate Pebrenry 21,2917] FOR GREEN CORE GEOTHERMAL, INC. USE ONLY Cocoa Ta ©oceg) | ORFEN CORE GEOTHERMAL, INC. WORDING ON CGorER NIGBU- PALINPINON Shell and Tube type Heat Exchanger: 71m? en Ta Daca Pana | Pepaedoy | Chesed [Fane MLtlercuio | GETMatuiec | WC A TECHNICAL DATA SHEET (10 6¢ FILLED UP BY THE MANUFACTURER / BIDDER) Page Sof 6 DETAILS / PARTS (GCGI TECHNICAL REQUIREMENTS BID OFFER ] 2.27 Name Plate us304 COMPLY 2:28 Nut ssa wee COMPLY 2.29 Plug ‘SUS 304 1/48, SUS 304 3/4B 2.30 Foundation Bolt nut washer S41 Mae xeis COMPLY 231 Blind flange 841 JIS 10K ~ 63, RF $5400 JSIOK 6B RF 2.92 Packing ‘ASBESTOS JOINT SHEET ion-Asbestos Joint Sheet 2.33 Bolt ‘$841 M20 X70 $S400 M20X70 2.34 Nut ‘$841 M20 $8400 M20 3.0 Manufacturer Tada Electric Co. Ltd. COMPLY Provide all drawngldesign deals poration ‘end maintenance. manuals, sp Ss on oe troubeshooting "guide. and” oher 40° Drewings and Docurnantat information necessary for the design COMPLY assessment, peraon and maintenanes of the heat exchanger English language shall be used throughout al Gravings, “and documentation. However, descritons | COMPLY ‘on drawings may be in other languages, provided English translations are given, [NOTES 1, ManufecturerBidder shall indicate its compliance to the Technical Requirements of EDC on the column marked “BID OFFER" by using ONLY the “COMPLY” or “FOLLOWED”. Symbols or charac hh as “DITTO” or QUOTATION MARKS are NOT ACCEPTABLE. Should the Bidder deviate fom tne requirements of EDC, it hall indcate The exact offer on the space provided. Supporting documentation must be provided. 2. Incase the provided spaces are not enough, use additional sheet and indlate “SEE ATTACHED" on the space provided. 3. Unless otherwise specified, requirements are brand new and the specifications stated above are the minimum, 4, Fellure to provide the necessary informationata required in this Technical Data Sheet may cause the disqualification of bid Bidders Nome _KOKUISATCOMMERCE CO_ LTD _Manvfactuers Name! FI] ELECTRIC CO. LTD. Auhorzed Sionaton TOSHINARI KAWAHARA Authored Signatoy: _ KATSUTOSHI SHOIL Designation: MANAGER war Zoe Sgeain Sous Lao Date: FEB, 2 1,2 Date: ebrasryy 2) 2017 FOR GREEN CORE GEOTHERMAL, INC. USE ONLY ~] Document Tite gad cogi |" OPN) CORE GPOTHERMAL, INC. TURBINE OIL COOLER Shell and Tube type Heat Exchanger; 71m? Ranson Dae Dessipton PANnber [Prepared by | — Ghacked by | Anproved by MUMerculo | GETMatuiae | WC Auditor TECHNICAL DATA SHEET (10 8€ FLED UP BY THE MANUFACTURER /BIODER) Page bof DETAILS / PARTS (G66! TEGHNICAL REQUIREMENTS BID OFFER Ee Testing =| 54 Hydrostatic Te Vendors shal guarantee the performance of the Specified in the specification sheet for ‘one year of operation. equipment as COMPLY In the event the performances are not ‘achieved, vendor shall make all required ‘modifications at his expenses unti | COMPLY ‘Quaranieed performance is attained Engineer 7.0 Other requirements ‘Vendors original certificate of origin COMPLY Test Contficates COMPLY Material Mil Certifcates COMPLY FAT and Technical accoplance tobe ‘Conducted by Facility Maintenance COMPLY [NoTEs: i} 1. Manufacturer/Bidder shall indicate its compliance to the Technical Requirements of EDC on the column marked “BID OFFER" by using ONLY the words “COMPLY” or “FOLLOWED”. Symbols or characters such as “DITTO” or QUOTA MARKS are NOT ACCEPTABLE. Should the Bidder deviate From the requirements of EDC, i shall indicate te exact oferet the space provided. Supporting documentation must be provided. 2. Incase the provided spaces are not enough, use adcitional sheet and indicate “SEE ATTACHED" on the space provided 3. Unless otherwise specified, requirements are brand new and the specifications stated above are the minimum, 4. Failure to provide the necessary informationidata required inthis Technical Data Sheet may cause the disqualification of bid Bidders Neme:_KOKUSAI COMMERCE CO.,LTD _ Menufacturer’s Name’ FUJI ELECTRIC CO., LTD. Authorized Signatory: TOSHINARI KAWAHARA Authorized Signatory: KATSUTOSHI SHOJI Designation: MANAGER Designation: GENERAL MANAGER Sienate: 2 Sina Date: FEB, 2-7 2017 Date: Febyaney 2) ,20] 7 FOR GREEN CORE GEOTHERMAL, INC, USE ONLY Docu Tae Ree a eT TURBINE OIL COOLER Shell and Tube type Heat Exchanger 71m? Raion oa Sas FRTanber | Prepaedby | — Grae by [Rapa MuMereuio | GETMatuiac | we Audtor TECHNICAL DATA SHEET (10 Be FILLED UP BY THE MANUFACTURER / BIDDER) Page 7 of DETAILS / PARTS GCGI TECHNICAL REQUIREMENTS BID OFFER [NoTES: J 1, ManufacturerBidder shall indicate its compliance to the Technical Requirements of EDC on the column marked “BID OFFER by using ONLY the “COMPLY” or “FOLLOWED”. Symbols or characters such as." ‘ot QUOTATION 4. Fe MARKS are NOT ACCEPTABLE. Should tne Bidder deviate from the requirements of EDC, itshaTindcate U the space provided. Supporting documeniation must be provided, ‘exact offer on Incase the provided spaces are not enough, use additional sheet and indicate “SEE ATTACHED" on the space provided. Unless otherwise specified, requirements are brand new and the specifications staled above are the minimum. re to provide the necessary information/data equred in this Technical Data Sheet may cause the disqualification of bid Bidders Name: _KOKUSAI COMMERCE CO.,LTD Manufacturers Name: FUJI ELECTRIC CO, LTD. Authorized Signatory: TOSHINART KAWAHARA Authorized Signatory: KATSUTOSHI SHOJI Designation: MANAGER Designation: GENERAL MANAGER Signature Signature Date: FEB71, 2017 Date: ZFebraney LY Lol] FOR GREEN CORE GEOTHERMAL, INC, USE ONLY Document Tie GREEN CORE GEOTHERMAL, INC, og I ceo TURBINE OIL COOLER ‘Shell and Tube type Heat Exchanger; 71m? Reviion Date Deeaoion Pa Naber [Prepared | — Graced by | Fapoved by MLMercuto | GETMatuiac | WiC Audtor

S-ar putea să vă placă și