PROPOSED RESIDENTIAL DEVELOPMENT AT

MOOSAPET, HYDERABAD

DESIGN CALCULATIONS
FOR PUMPS & WTP

Clients : M/S Cybercity Builders & Developers Pvt ltd.


Hyderabad

Architects : M/S Genesis Planners Pvt Ltd.


Hyderabad

PHE Services : M/S SampathKumar Associates Pvt Ltd


Consultants Bengaluru.
1.0 PREAMBLE

M/s. Cyber city Developers is coming up with Rainbow vistas proposed Residential Building at

Hyderabad. The proposed project comprises of 13 Blocks namely Block E, F, G, H, I, J, K, L, M, N, O, P &

Q.

Blocks E, F, G, H, I, J, L, M, N, O, P & Q comprises of 2 Basements, ground and 19 upper floors.

Block K comprises of 2 Basements, ground and 25 upper floors.

Block K water supply pumps to be provide separate set of pumps due to increasing of floors

Water demand is calculated based on the guidelines of NBC.

Water demand calculation for E, F, G, H, I, J, L, M, N, O, P & Q block

No of Apartments 2410 Units

Occupancy 5 Persons per apartments

No of Persons 2410 x 5 = 12050 persons

Domestic water demand in lpcd 80

Flushing water demand in lpcd 55

Domestic water reqt in liters/day 4340 x 80 = 9,64,000

Flushing water reqt in liters/day 4340 x 55 = 6,62,750

Total water reqt in liters/day 16,26,750

2.0 DESIGN CALCULATION FOR DOMESTIC WATER DISTRIBUTION HYDROPNUEMATIC PUMPS


SYSTEM

2.1 PUMPS DISCHARGE CALCULATION

Domestic water Demand per day = 964.0 m3

Assuming above demand (cumulative) being consumed during 4.0 hrs in a day, Peak flow in the System

would be

964/4.0 = 241 m3/hr

Assuming 4 Nos. Working + 1 No. stand by pump

= 241/4 pumps
= 60.25 m3/hr of each pump

2.2 HEAD CALCULATION

Head = Suction Head + Static Head + Friction Head + Residual Head

= 0.0 m + 68.0 m + 15.0 + 12.0m

TOTAL Head = 95.0 M

: Recommended duty of pumps for domestic water distribution pumps 67.5 m3/hr at 95.0 mt head

cut - in pressure : 8.5 Bars

cut - off pressure : 9.5Bars

( 4 Nos. Working + 1 No. Stand By )

3.0 DESIGN CALCULATION FOR FLUSHING WATER DISTRIBUTION HYDROPNUEMATIC PUMPS


SYSTEM

3.1 PUMPS DISCHARGE CALCULATION

Flushing water Demand per day = 662.0 m3

Assuming above demand (cumulative) being consumed during 4.0 hrs in a day, Peak flow in the System

would be

662/4 = 165.5 m3/hr

Assuming 4 Nos. Working + 1 No stand by pumps

= 165.5/4 pumps

= 41.375 m3/hr of each pump

3.3 HEAD CALCULATION

Head = Suction Head + Static Head + Friction Head + Residual Head

= 0.0 m + 68.0 m + 15.0 + 12.0m


TOTAL Head = 95.0 M

: Recommended duty of pumps for domestic water distribution pumps 45.0 m3/hr at 95.0 mt head

cut - in pressure : 8.5 Bars

cut - off pressure : 9.5Bars

(4 Nos. Working + 1 No. Stand By )

3.0 DESIGN CALCULATION FOR RAW WATER FILTER FEED PUMP

3.1 PUMPS DISCHARGE CALCULATION

Total Domestic water Demand per day = 1024.0 m3

Assuming above demand being treated during 18 hrs cycle, Peak flow in the System would be

1024/18 = 56.8 m3/hr

Assuming 2 Nos. Working + 1 No. stand by pumps

= 56.80/2 pumps

= 28.4 m3/hr of each pump

Pumps & treatment plant split into modular design having two Working units for ease of operation &

optimum sizes

3.3 HEAD CALCULATION

Head = Minimum 2.5 kg/cm2 pressure required for water treatment process so considered 30m head.

Head losses across the system 0.7 to 1 bar

: Recommended duty of pumps for domestic water distribution pumps 29.0 m3/hr at 30.0 mt head
(2 Nos. Working + 1 No. Stand By )

4.0 DESIGN CALCULATION FOR BASEMENT STORM WATER LIFT PUMPS

4.1 PUMPS DISCHARGE CALCULATION


Storm water tank capacity = 10.0m3

Assuming above demand being pumped during 20 mins, Peak flow in the System would be

10000/1200 sec = 8.0 lps

Assuming 2 Nos. Working

= 8 LPS pump

4.2 HEAD CALCULATION

Head = Suction Head + Static Head + Friction Head + Residual Head

= 0.0 m + 9.0 m + 1.0 + 2.0m

TOTAL Head = 12.0 M

: Recommended duty of pumps for domestic water distribution pumps 0.5 m3 at 12.0 mt head

(2 Nos. Working)

5.0 DESIGN CALCULATION FOR PUMP ROOM WATER LIFT PUMPS

5.1 PUMPS DISCHARGE CALCULATION

Final Capacity of WTP = 55.0 cum/hr

Assuming backwash @ 55m3/30min

Volume collected half flow of WTP Capacity

= 27.0 cum

Assuming 2 Nos. Working pumps

= Each pump capacity 4.0 lps

5.2 HEAD CALCULATION

Head = Suction Head + Static Head + Friction Head + Residual Head

= 0.0 m + 7 m + 1.0 + 2.0m

TOTAL Head = 10.0 M


: Recommended duty of pumps for above mentioned water distribution pumps 0.25 m3 (4 LPS) at 10.0 mt

head (2 Nos. Working)

6.0 DESIGN CALCULATION FOR IRRIGATION WATER LIFT TO IRRIGATION OHT PUMPS

6.1 PUMPS DISCHARGE CALCULATION

Fire water tank capacity = 10.0 m3

Assuming above demand being pumped during 60 min. Peak flow in the System would be

10000/3600 sec = 3.0 lps

Assuming 1 No. Working + 1 No. stand by pumps

= 3.0 lps

6.2 HEAD CALCULATION

Head = Suction Head + Static Head + Friction Head + Residual Head

= 0.0 m + 71.0 m + 4.0 + 5.0m

TOTAL Head = 80.0 M

: Recommended duty of pumps for above mentioned water distribution pumps 3.0 lps at 80.0 mt head

( 1 No Working + 1 No Stand By)

7.0 DESIGN CALCULATION WATER TREATMENT PLANT

7.1 WTP CAPACITY CALCULATION

Domestic water Demand per day = 964.0m3

Assuming above demand being treated during 18 hrs cycle, Peak flow in the System would be

964/18 = 53.5 m3/hr


Assuming 2 Nos. working plant

= 53.5/2 Nos.

= 26.75 m3/hr of each Plant

: Recommended Capacity of WTP for 27.5 m3/hr 2 sets.