Sunteți pe pagina 1din 3

Overview of Rules for

Turbine Operation
I. Unit Operation under varying-load/Off-design
Condition
Rules/Code for
Design condition operation is only possible in tests. In
Turbine Operation practical operation, the operation is under the off-
design condition
Two operation modes:
Dr. Zhouhang Li
sliding-pressure operation condition and constant-
Kunming University of pressure operation condition
Science and Technology

Overview of Rules for Overview of Rules for


Turbine Operation Turbine Operation
sliding-pressure operation of the turbine sliding-pressure operation of the turbine
1.Pure sliding-pressure operating: by regulating 3. Compound sliding-pressure operating has
the boiler; poor response three modes:
2.Throttling sliding-pressure operating: by Sliding-constant pressure compound mode
regulating valves in turbine system; lower
Constant-sliding pressure compound mode
thermal economy
Constant-sliding-constant pressure compound
3.Compound sliding-pressure operating: has
mode
three modes

1
II. Trainings on Operation and
III. Startup of Turbine Unit
Technology Management
1. Change rate of Temperature When the main steam pressure is 4.2 MPa,
temperature is 320 and the temperature of the
2. Temperature Difference between Inner and
reheater is 260, the turbine is ready for
Outer Walls of Cylinder
running
3. Temperature Difference between Upper and
Depending on the cylinder temperature of the
Lower Cylinders
turbine (150-170), the startup can be divided
4. Differential Expansion by:
1.Cold-state startup
2.Hot-state startup

III. Startup of Turbine Unit Cold Startup of Turbine Unit


Parameter Unit Scope Parameter Unit Scope


1. Preparation for the Cold Start-up of Turbine: Reheater MPa 0.1-0.4
Jacking oil pressure
MPa 13.5
pressure

Confirmation of the normal operation of Axial mm -0.90.9

<107
Support bearing temperature
translation
protective systems
-0.75
Differential mm <99
15.75 Thrust bearing temperature
Confirmation of major parameters meeting the expansion

requirements
Pressure of MPa 0.1-0.2 <65
Bearing outlet oil temperature
lubricating oil


Pressure of
MPa 14.50.5 Steam exhaust port temperature of <79
fire-resistant
LP cylinder
oil

Temperature Temperature difference between
4050 <83
of fire- internal and external walls of steam
resistant oil room

2
Cold Startup of Turbine Unit III. Startup of Turbine Unit
2. Running, Speed Increasing and Warming of Hot Start-up of Turbine:
the Turbine
No warm-up is needed
Operation rules and procedures
Before the start, ensure the steam is
Speed: 0 600 r/min 2040 r/min 2950 r/min overheated enough
3000 r/min
Different from the cold startup (gradual
3. Precautions during speed increasing warming up)
Critical speed for specific checks; normal speed
changing rate

III. Startup of Turbine Unit III. Startup of Turbine Unit


1. Preparation for the hot Start-up of Turbine: 3. Operation procedures for the hot Start-up
Confirmation of the parameters and specific Feed-water pump, induced draft fan, flow rate,
operation meeting the requirements fluidization air, secondary air, primary air,
amount of the supply coal
2. Conditions for the hot start-up:
4. Other Precautions for Hot Start-up
Eccentricity, temperature difference, vaccum,
draining, rotating speed and its changing rate, The amount of coal; temperature monitoring;
expansion, displacement, etc. drum pressure; water level of drum, steam
pressure and temperature

S-ar putea să vă placă și