WORLDWIDE EPC SOLUTIONS FOR OIL & GAS SINCE 1962

50 years
of experience
SICIM is a Construction Company established in 1962 and
offering all types of services related to the installation of
pipelines and relevant ancillary facilities for the transmission
and distribution of oil and gas on an international basis.
The experience gained as a result of operating for the most
important international Oil & Gas Companies in all types of
logistic, climatic and environmental conditions, has allowed
SICIM to continuously modify and perfect all the relevant
operating procedures and adapt them to the specific technical
and contractual requirements.
On this basis, SICIM can offer the best range of solutions and
the right approach to all types of construction problems. Our
past is a guarantee of success.

Human SICIM policies addressing its human resources are remarkable. It


is the Management convincement that the key to achieve the best

resources
performances and guarantee the satisfaction of its Clients is a well-
trained and motivated workforce.
Personnel motivation, training and integration of different cultures
are an important part of SICIMs human resources management.
We have on our payroll personnel from over than 20 different
Nationalities!
Thanks to these policies and after more than forty-five years of
world-wide experiences, we can guarantee the right persons at all
levels.
Health, safety
and environment
SICIM activities are performed in compliance with
the best HSE recognised codes and standards
in order to safeguard the life and the health of all
personnel involved in the operations.
SICIM Occupational Health and Safety Management
System has been certified according to BS OHSAS
18001:2007 by Moody Intl during 2009.
Sicim Environmental Management System has been
certified according to ISO 14001:2004 by Moody
Intl during 2011.
SICIM OH&S and Environmental certificates cover
all SICIM activities included in its scope: Design,
procurement, construction and installation of
pipelines and associated plants for gas, oil and
water.
OHSAS 18001 and ISO 14001 certifications are only a step
towards continual improvement of our OH&S and Environmental
performances, being our common scope minimizing our impact on
people and environment.
SICIM Management and personnel are fully committed to implement
the Health, Safety and Environmental Plans that are being set out for
each specific Project and activity.
SICIM HSE plans are extended as such to all Clients, Subcontractors,
Visitors and suppliers personnel involved in our operations.
SICIM is convinced that HSE is not a goal to reach but it is an
essential prerequisite of the Companys operations
SICIM Management and personnel are fully committed to implement
the Health, Safety and Environmental Plans that are being set out for
each specific Project and activity.
SICIM HSE plans are extended as such to all Clients, Subcontractors,
Visitors and suppliers personnel involved in our operations.
SICIM is convinced that HSE is not a goal to reach but it is an
essential prerequisite of the Companys operations.
SICIM Quality Assurance System has been
certified in 1994 by the Lloyds Register according
to the ISO 9001 certification.
SICIM certification LRC 180547 covers all ranges
of activities and projects world-wide, including
Turn Key Projects on EPC basis.
To this effect, SICIM has shifted from the
traditional Quality Assurance System to the Quality
Management System.
SICIM quality policies are based on:
continuous research of Client satisfaction;
continuous improvement of the services
provided.
Welding SICIM is certified according
to UNI EN ISO 38342:2006 -
Quality requirements for fusion
welding of metallic materials
Part 2: Comprehensive quality
requirements.

Mechanized welding system


SICIM is fully equipped with a proprietary mainline
mechanized welding system, GPR-FASTWELD, own
designed and developed, which has been employed on our
projects since 2008. This system is especially indicated
for large diameters pipeline projects, but it can be used
starting from a diameter of 6. Average daily productions
can reach over 150 welds (36 pipe).
It s for all the pipeline applications, from 6 to 60 pipe
diameter, including heavy wall thicknesses. It is based
on PLC control for all the features with a wide range of
regulation, to attain optimal welds in all the working
conditions, with significant time saving and high quality.
GPR-FASTWELD is a flexible open system, and can be used
with the following combination of processes and welding
consumables:
GMAW downhill or Pulsed GMAW downhill with solid wire
and narrow-gap bevel with or without backing support
FCAW downhill with metal cored wires for fill and cap runs
FCAW uphill with rutile wires in for filling and capping
SICIM: a worldwide operation field
Northern Ireland
Ireland

France
Canada
Spain

Mexico

Colombia Algeria

Per
Holland
Belgium Germany

Switzerland
Italy

Kazakhstan

Turkmenistan

Iraq

Congo U.A.E.
Libya

Saudi Arabia
Cameroon
Angola
Mozambique

SICIM offices
The availability
availability ofofconstruction
constructionequipment
equipmentis isimpressive:
impressive: SICIM
SICIM owns
owns 118163 pipe-layers
pipe-layers of different
of different sizeca-
size and and
pacity, over 100 pay-welders, 49 excavators, 24 pipe bending machines to cover up to 60 pipes, 39
capacity, over 190 pay-welders, 164 excavators, 55 pipe bending machines to cover up to 60 pipes, 45 cranes trucked
dumpers,
up to 200 27
toncranes just
of lifting to mention
capacity, just atofew.
mention a few.

Plants
Plantsfor
forCivil
CivilWorks
Works N
N 4814 Internal
Wheeledline-up clampsSpecial
Tractors, up to 48
Use
N 61 Internal line-up clamps
N 13 Tractors equipped for sand blasting (Wheeled)
N
N 62 Bulldozers
Bulldozers
N 3 forTractors
automatic weldingforupsand
equipped to 56blasting
N
N 18 8 Front
Frontend loaders
End Loaders N 34 Hydraulic
(Trucked) bevelling machines up to 56
N 161
N 49 Excavators
Excavators uptype
to 50CAT
ton320-up to 345 N
N 12 8 Winches
Tractorsupequipped
to 70 tonfor induction heat
N
N 38 3 Amphibious excavators
Trucked Dumpers N
N 13
12 Test motorpumps
Motor Winch upuptoto70600
tonbar
N 61 Crawler
N 1 Motorgrader dumpers N
N 14
27 Filling motorpumps up to
Motor-Compressors 250.000
7 Bar to 24l/h
Bar to 24
N
N 27 Motorgrader
Mobile Crushing Plant N 2 Motorpump sets
Bar 25 000 l/min
N 76 Mobile
N Mobile Screening
crushing Plant Super Padder
plants N
N 3933 Compressors up to 30.000
Motor-Generators 3.5 Kwl/min
to 250 kW
N 8 Mobile
N Self Loading
screeningScreening
plants Plant N
N 10 Lighting Towers to 250 KW
75 Power Generators up
N 44
N De-watering
8 Self-loading Pumps plants
screening N
N 315 Forklifts
Motorand manlifts
Pumps high pressure up to 750 ATE
N 197 Compacting
N Compacting Rollers
rollers N 12 Lighting plants
N 5 Electrical Pumps high pressure up to 450
N 113 De-water pumps N 7 Hydrotest
ATE Container completed
Plants for Mechanical Works
N 10 with instrumentation
Motor-Pumps medium pressure up to 300
cm/hrs at 50 ATE
Plants for Mechanical works
N 118 Pipelayers 40 120 ton N 2 Motor-Pumps medium/high pressure 150
N 27 Wheeled Cranes 4 x 4 12 to 60 tons Various Motor cm/h at 10 / 200 ATE
Vehicles
N 2 Pipe-layers 120 ton
N 17 Fork Lifts N 6 Hydrotest Container completed with
N 60 Pipe-layers 90 ton
N 12 Pipe Stringing Tractors (Trucked) N 396 Cars,instrumentation
off-road vehicles, trucks and buses
N 101 Pipe-layers 60 ton
N 24 Bending Machines up to 60 N 32 Trailers, weight
N 10 Dead testersand pipe-dollies
semi-trailers
N 3 Pipe-bending machines 60
N 4 Thrust/Auger Bore Machines N 8 Hydrotesting Tanks from 20 to 40 cm
N 6 Pipe-bending machines 48
N 53 Internal Mandrels up to 60 N 8 Volumetric Flowmeters
N 46 Pipe-bending machines up to 42
N 23 Trucked Pay Welders for manual welding
N
N 12 52 Crawler
WheeledpipePay
carriers
Welders for manual welding Camp Facilities
Various Motor Vehicles
N 131 Crawler and wheeled pay-welders
N 28 Trucked Pay Welders for mechanised
forwelding manual welding N
N 11
86 Complete camp Wagons
4WD Station facilities and Pick Ups
N 64 Crawler pay-welders for automatic welding (4500 people total
N 30 4WD Multiservice occupancy)
Trucks type Daily 4x4
N 72 Welding Heads and Accessories for
N 11 Workshop
mechanisedtrucks for automatic
welding - PWT welding N 1 Water Tank Truck
N 69 Motor welding Machines N 47 Utility Trucks
N 4 Computerised programmer for mechanised
N 110 Electrical
weldingwelding machines N 17 Trucks with crane
N 45 Mobile
N 23 Internal cranes
Line up
up to 200 ton
Clamps up to 48 N 3 Greasing Trucks
N
N 25 3 Thrust boring
Internal Line machines
up Clamps for automatic N 7 Workshop Trucks
N 1 Microtunnelling
welding up to plant
56 DN 1460 N 10 Fuel Trucks
N
N 17 54 Sand-blasting
Motor Welding mobile units
Machines N 12 Road Tractors
N
N 21 7 Induction-heating
Electrical Welding mobile units
Machines N 5 Flat Beds
N 7 Coating mobile units
N 77 Pipe Cutting Machines (Ossirotors) up to 56 N 9 Low Beds
N
N 11 25 Farm tractorsBevelling
Hydraulic for special use up to 56
Machines N 4 Busses
N
N 604 Internal Mandrels
Workshop Truck up
4 xto 60mechanised welding
4 for
LEADERS IN PIPELINES CONSTRUCTION SINCE 1962

List
List ofof Human
employees Resources
employees as of
as 30/09/2007
of 30/09/2007
List of employees as of 30/09/2006
List of employees as of 30/09/2006
L O CLAOTCI A
ONT I ON
CLASSIFICATION
CLASSIFICATION REST OF THE
HEAD HEAD OFFICE ITALY EUROPE TOTAL
ITALY FRANCE SPAIN LIBYA IRELAND TOTAL
KAZAKHSTANWORLD
OFFICE

MANAGEMENT
MANAGEMENT 7 8 1 1 1 3 4 1 1313

ENGINEERING
ENGINEERING 5 5 5 10 8 1815

TENDERING
TENDERING / PROPOSALS
/ PROPOSALS 4 5 6 4 11
CLASSIFICATION

PROCUREMENT / MATERIAL
PROCUREMENT HANDLING
/ MATERIAL HANDLING
6 63 1 2 4 4 2 12 1710 4027

QA / QCQA / 4QC 43 3 1 2 25 27 7 4036

UNSKILLED
PROCUREMENT & LOGISTICS

WORKSHOP & WAREHOUSE


ADMINISTRATION & FINANCE

HUMAN RESOURCES

TOTAL
COMMERCIAL & PROPOSAL

LEGAL
PLANNING & COST CONTROLLING

ENGINEERING

PROJECT MANAGEMENT & SUPERVISION

CONSTRUCTION
HEALTH, SAFETY & ENVIRONMENT
TOP MANAGEMENT

ICT
QUALITY
HSE 2
HSE 21 2 2 29 25 2 3431

SCHEDULER
SCHEDULER
/ COST /CONTROLLER 1
COST CONTROLLER 2 1 3 6 1 5 9

4
3
3
3
6
7
9

6
0
5
9

4
32
16
15

122
ADMINISTRATION / PERSONNEL
ADMINISTRATION 13
/ PERSONNEL 2
13 1 2 3 3 3 16 34 5 4352

PROJECT MANAGERS
PROJECT MANAGERS 3 2 3 5 3

0
0

2
0
0
0

0
0
0
1

0
0
0
0
0
1
HEAD OFFICE EUROPE

CONSTRUCTION MANAGERS 2 1 1 3 7
CONSTRUCTION MANAGERS 1 2 5 8
Human Resources

Human Resources

SUPERINTENDENTS 2 1 4 7
L O C A T I ON

SUPERINTENDENTS 2 1 12 15

6
7
91
16
47
40

23
25
36

79
10

943
134
101

3741
2183
SUPERVISORS 6 28 12 46
REST OF

SUPERVISORS 2 10 3 150 165


THE WORLD

CRAFTMENT / SKILLED & UNSKILLED LABOUR 18 85 14 15 15 376 262 785


CRAFTMEN / SKILLED & UNSKILLED LABOUR 15 175 18 1255 1463
22
63
49

30
30
46

83
10
26

10
123

949
137
104

3865
2183
TOTAL

TOTAL 60 107 17 23 24 501 315 1047


TOTAL 62 198 34 1554 1848
Turnover LEADERS IN PIPELINES CONSTRUCTIO
Last five years turnover
(including JVs and partecipated companies)
Turnover
Last three years turnover
(mln/)
LEADERS IN PIPELINES CONSTRUCTION SINC

512,8 (mln/)

(Thousands of Euro)
435,1
400
93,9
101,8

86,0

80,2
216,7
164,5

2004 2005 2006 2007

2011 2012 2013 2014


(forecast)
Works in progress
LENGTH
N CLIENT DESCRIPTION OF WORKS DN YEAR
km
OBC Contract for Construction, Testing, Commissioning & Start up of the Oleoducto Bicentenario de Colombia 2011
1 230 42
(Colombia) Phase 1 Section Araguaney Banadia. 2014
Revamping of the structure and safety system of the Offshore Platforms DP4 and DP5 - Offshore Platform of
ENI CONGO 2011
2 Loango (Republic of Congo). N/A N/A
(Congo) 2014
(J.V. with RENCO)
TCO Master Contract 911318 2011
3 N/A N/A
(Kazakhstan) Production Maintenance Services. 2016
ENI CONGO Design, Supply and Installation of a new oil of drainage tank on DP6 Platform of Loango Field, including 2011
4 N/A N/A
(Congo) complementary activities. 2014
TERASCOM 2011
5 EPC of an 8 Pipeline for the connection of HP Wells at Cluster 500 Bis in MBoundi Field. -- 8
(Congo) 2014
Eni Iraq B.V. EPC Pipelines Installation. Zubair Oil Field Project. 2012
6 N/A N/A
(Iraq) (J.V. with Drake & Scull Internationl) 2014
COTCO 2012
7 Lom Pangar Pipeline Modification Project. 26,6 30
(Cameroon) 2014
Transportadora de
Gas Natural de la TAMAZUNCHALE Gas Pipeline. 2012
8 Huasteca, S. de 233 36/30
(GDI-SICIM PIPELINES S.A. DE C.V.) 2014
R.L. de C.V.
(Mexico)
Consorcio Granja
y Montero - 2012
9 Construccin de las Redes Troncales Sur del Sistema de Distribucin de Gas Natural de Ica. 160 20
Conciviles 2014
(Per)
SNPC Installation de Surface (EPCI). 2013
10 N/A N/A
(Congo) (J.V. with RENCO) 2014
EPC and Installation for the upgrading of an existing 16 Sealine and increase of the Pump Station flow rate
ENI CONGO 2012
11 at Cote Madeve. N/A 16
(Congo) 2014
(J.V. with RENCO)
ENI CONGO 2012
12 Revamping of Eni Congo Headquarter. N/A N/A
(Congo) 2014
Gasoducto de
Aguaprieta, S. de Sonora Pipeline Corridor. 2013
13 831 30/36
R.L. de C.V. (GDI-SICIM PIPELINES S.A. DE C.V.) 2015
(Mexico)
ENI CONGO 2013
14 Additional work for the Revamping of Platforms DP4 DP5. N/A N/A
(Congo) 2015
AgipKCO Kashagan Field Development Experimental Programme. 2013
15 N/A N/A
(Kazakhstan) Mechanical Works for OPF Completion. 2014
TCO Master Contractor Services Contract 1048870. 2013
16 N/A N/A
(Kazakhstan) Future Growth Project (FGP) / Wellhead Pressure Management Project (WPMP). 2014
TCO Master Contract No. 1150430. 2013
17 N/A N/A
(Kazakhstan) FE Construction Services. 2018
Petromar Lda 2013
18 Mafumeira-4 - Pipeline Installation-Mechanical & Painting Works. 1 18
(Angola) 2014
BOSCONGO 2013
19 Litchendjili Onshore Treatment Facilities Project Works. N/A N/A
(Congo) 2015
ENI CONGO Revamping of DCS/ESD/F&D System relating to Mboundi Safety area (ESD automatic). 2013
20 N/A N/A
(Congo) (J.V. with NOVELLO) 2014
ENI CONGO 2013
21 Construction works of a New Firefighting System on Kouakouala Field. N/A N/A
(Congo) 2014
ENI CONGO 2013
22 Globale Maintenance Services for onshore Installations. N/A N/A
(Congo) 2016
ENI CONGO 2013
23 Multidisciplinary Activities on PW1 MBoundi Field. N/A N/A
(Congo) 2014
AgipKCO 2013
24 Mechanical Maintenance and Preservation Works for Start Up and Post Start-Up Activities. N/A N/A
(Kazakhstan) 2014
TCO 2013
25 Master Contractor Services Contract No. 1150792. N/A N/A
(Kazakhstan) 2015
COTCO
26 New Shippers Crude Oil Topping Plant Modifications. N/A N/A 2014
(Cameroon)
RENCO TOTAL CONGO - MOHO NORD FIELD DEVELOPMENT 2014
27 1,3 16
(Congo) Construction of the oshore oil pipeline. 2015
LENGTH
N CLIENT DESCRIPTION OF WORKS DN YEAR
km
RENCO
28 Projet de Traitement des EAux de Production du Terminal Petrolier de Djeno. N/A N/A 2014
(Congo)
WORLEY PARSONS Agip KCO Eskene West Rail Project.
29 N/A N/A 2014
(UK) Supply of Painted Prefabricated Steel for Gondola Shed Covers.
Transportadora De
Gas Natural De La
30 Huasteca, S. De Master Services Agreement No. 10458 N/A N/A 2014
R.L. De C.V.
(Mexico)
AgipKCO Kashagan Field Development Experimental Programme 2014
31 N/A N/A
(Kazakhstan) Pipeline Inspection and Support Services 2015

ENI CONGO Multidisciplinary activities for the realization of well head connection, mechanical installation, steel 2015
32 N/A N/A
(Congo) structures, electrical and instrumentation works for Eni Congo offshore fileds 2017

PETROMAR LDA
33 Fabrication and Trasnportation of Skid Materials for EPCI- 4 Project N/A 2-20 2014
(Angola)
Los Ramones Fase II Sur.
ICA FLUOR 2014
34 Tramo I Y II 183 42"
(Mexico) 2015
(GDI-SICIM PIPELINES S.A. DE C.V.)

Works executed during last ten years


LENGTH
N CLIENT DESCRIPTION OF WORKS DN YEAR
km

PLUSPETROL Construction of the Castanha - Malongo Pipeline EPC. 2012


1 35 6/8/10
(Angola) (SICIM S.p.A. - Kalunga Freedom Oil JV) 2014

OCENSA 2013
2 EPC for River San Jorge Crossing (24") by Horizontal Directional Drilling system. 1,3 24"
(Colombia) 2014

ENI CONGO Service of Global Maintenance for the Onshore Platforms and the Oil Centre of Eni Congo. (J.V. with 2012
3 N/A N/A
(Congo) RENCO) 2014

TCO Master Contract No. 883274 2008


4 N/A N/A
(Kazakhstan) Construction Services - Flowlines. 2013
Laggan - Tormore Development
ALLSEAS 30/18/ 2011
5 Installation of Pipelines & Umbilicals. 12
(UK) 8/2 2013
(SICIM ROADBRIDGE LTD)
Cusiana Project - Lot 2
TGI Construction of a loop of 54km ND 20 between EI Porvenir (Monterrey Municipality, Casanare) and 2011
6 57,2 20
(Colombia) Miraflores (Miraflores Municipality, Boyac). 2013
(CONSORCIO EL PORVENIR - MIRAFLORES)
ECOPETROL 2011
7 Construction of the Gas Pipeline Cupiagua-Cusiana. 40,2 18/20
(Colombia) 2013
TIGF 2012
8 Projet GIRLAND EPC Ligne. 57 36
(France) 2013
TARAHUMARA
PIPELINE S. de R.L. Chihuahua Natural Gas Transmission Pipeline. 2012
9 381 36
de C.V. (GDI-SICIM PIPELINES S.A. DE C.V.) 2013
(Mexico)
Fives Nordon 2012
10 Projet GIRLAND EPC Lussagnet 2,4 various
(France) 2013
BGE Pipeline to Great Island Power Station, Co. Wexford 2012
11 46 16
(Ireland) (SICIM ROADBRIDGE LTD) 2013

EPC and Installation Activities within MBoundi Field Development Project related to: Early Phase Water PLANT &
ENI CONGO Injection (Work Package PW8.3a); Early Phase Water Injection Network (Work Package PW8.3b); Civil 4/8/ 2009
12 PIPELINE
(Congo) Works for Site Preparation, Flare Installation and Short Term Activities (Work Package PW6) 12/16 2013
WORKS
(J.V. with RENCO)

ENI CONGO Well connection and water injection in the Oil Fields of MBoundi, Kouakouala and Loufika. 2011
13 N/A N/A
(Congo) (J.V. with RENCO) 2013

ABB S.p.A. P20030 - PW1 MBoundi. Additional manpower for PW1 Project. 2012
14 N/A N/A
(Congo) PWHT on ABB piping. 2013
ENAGAS Gasoducto Martorell - Figueras Tramo 1. 2010
15 84,6 36
(Spain) (UTE Martorell Gas) 2013
Gasoducto Tivissa Paterna Tr3 (Sud).
ENAGAS 2011
16 Contrato Marco. 64,6 40/32
(Spain) 2012
(UTE SAGUNTO)
N CLIENT DESCRIPTION OF WORKS LENGTH DN YEAR
km

BATEMAN 2008
17 Kashagan Field Development Experimental Program. Power Generation & Utility Plant. Mechanical Works. N/A N/A
(Kazakhstan) 2012

TIGF 2011
18 EPC of the Pipeline Artre du Bearn Projet (EPC Ligne). Lot: Lacq-Lussagnet. 57 32
(France) 2012

Front End Engineering Design (FEED)


CH2M Hill 2011
19 Frontera Aguascalientes Natural Gas Transportation System. 954 30/36
(Mexico) 2012
(GDI SICIM Pipelines S.A. de C.V.)

WINGAS Fernleitung OPAL von Lubmin nach Olbernhau, DN 1400. Lots 11, 12, 13 and 14 (Grossmar - Olbernhau). 2009
20 136,5 56
(Germany) (J.V. with Max Streicher GmbH) 2011

ENI CONGO EPC of the Pipeline for the Development of Zingali Oil Field and related wells connections, electrical and 2010
21 6 6
(Congo) instrumentation activities on Zingali platform. 2011

Kashagan Experimental Programme Project.


AgipKCO Construction of the Underground Piping System in the Gas, Sulphur and Slug Catcher Areas of the Main PLANT 2007
22 N/A
(Kazakhstan) Plant. WORKS 2011
(J.V. with ISKER)

Procurement, Construction and Installation Activities with optional Engineering within MBoundi Oil Centre PLANT &
Eni Congo 2009
23 related to the phase 1 of Gas Valorisation Project & EPC for the New Gas Gathering Network and its PIPELINE 8/10
(Congo) 2011
connections at the 10 pipeline related to phase 2. WORKS

Eni Congo Engineering, Procurement and Construction (EPC) to link water wells and water treatment section in 2009
24 N/A N/A
(Congo) MBoundi. 2011
ENERGIA
OCCIDENTE DE Manzanillo - Guadalajara Gas Pipeline. 2010
25 306 30/24
MEXICO (GDI SICIM Pipelines S.A. de C.V.) 2011
(Mexico)
Snam Rete Gas 2008
26 S.p.A. Construction of Martirano-Morano Calabro Pipeline. Sections: Rende-Tarsia & Tarsia-Morano Calabro. 75 48 2010
(Italy)
BORD GAIS Construction of Curraleigh West to Midleton Gas Pipeline.
27 EIREANN 47,4 24 2009
(SICIM ROADBRIDGE LTD)
(Ireland)
Zueitina Oil Dahab Field Development Phase 1. 2008
28 Company 30 4/8/10
Installation of Oil and Water Flowlines. 2009
(Libya)
Gasoducto Ramal a Castellon.
Enags S.A. 2008
29 Contrato Marco. 15,3 16
(Spain) 2009
(J.V. with COPISA Industrial)
Gasoducto Lorca - Chinchilla Tr2 (Nord).
Enags S.A. 2008
30 Contrato Marco. 93,3 42
(Spain) 2009
(J.V. with COPISA Industrial)
Shell E&P Ireland Corrib Project Onshore Gas Terminal CMC. Provision of Welding, Installation and Inspection to D-1002 Slug 12/ 2008
31 Limited N/A
Catcher. 24/42 2009
(Ireland)
Gasoducto Arbos - Barcelona Tr2 Subtramos 1+2.
Enags S.A.
32 Contrato Marco. 5,8 36 2008
(Spain) (J.V. with COPISA Industrial)

Gaz de France Artre du Nord Est, Lot 1 Petit Tenquin-Cerville et Erching-Obergailbach Gas Pipeline.
33 59 36 2008
(France) (JV with SPAC)

Enags S.A. Construction of BVV Gaspipeline. Section Arbos-Planta de Barcelona. 2007


34 72 36
(Spain) (J.V. with COPISA-G&O-STREICHER - Sicim share 25%) 2008
TOTAL
Infrastructures Gaz Artre de Guyenne. Construction dune Canalisation de Captieux Est Mouliets-et-Villemartin. 2007
35 69,4 36
de France - TIGF (J.V. with SPAC - Sicim share 50%) 2008
(France)
Snam Rete Gas Construction of Martirano Morano Gas Pipeline. 2007
36 S.p.A. 36,3 48
Section Martirano-Rende. 2008
(Italy)
TENGIZCHEVROIL Contract OK201143 - Associated Crude Project & Contract OK200904 - Crude Tank Farm Project. Firewater PLANT 2007
37 (TCO) N/A
Area. Installation of Equipment (pumps, monitors), Structural Steelwork, Piping Supports, Piping. WORKS 2008
(Kazakhstan)

TENGIZCHEVROIL Contract TCO OM200583 & TCO 598947: Pipeline Installation and Repairs, Facilities Engineering. 2006
38 (TCO) 25 6/10
Contract TCO OM201266: Mechanical & Civil Works for 2007-2008 Flip remaining Flowline Replacements. 2008
(Kazakhstan)

Parsons Fluor
Daniel International Contract 01962 - SGP Sulphur Plant. PLANT 2006
39 N/A
LLC (PFD) Various Construction Services. WORKS 2008
(Kazakhstan)
N CLIENT DESCRIPTION OF WORKS LENGTH DN YEAR
km
Parsons Fluor
Daniel International Contract 01960: SGP Sulphur Plant. PLANT 2006
40 N/A
LLC (PFD) Construction Services. WORKS 2007
(Kazakhstan)
Enags S.A. 2006
41 Gasoducto: Falces - Irurzun. 58 14
(Spain) 2008
Snam Rete Gas Gas Pipeline Camisano Vicentino-Zimella 2005
42 S.p.A. 42,2 56
(J.V. SICIM-GHIZZONI-ICOP) 2006
(Italy)
BORD GAIS Mayo to Galway Gas Pipeline - Bellanaboy to Ballymoneen. 2005
43 EIREANN 132 26
(SICIM ROADBRIDGE LTD) 2006
(Ireland)
BORD GAIS South / North Pipeline & Associated Infrastructure. 2005
44 EIREANN Lot A: Gormanston to Newry. 81 18 2006
(Ireland) (SICIM ROADBRIDGE LTD)
Snam Rete Gas 2004
45 S.p.A. Gas Pipeline Vastogirardi - Sulmona. 50 48 2006
(Italy)
Parsons Fluor 2/3/6/
Daniel International SGI Stage 1, SGI Stage 2, Korolev, Tengiz Trunklines and West Ringmain 1 Pipelines of the SGP Next 2005
46 97 8/12/
LLC (PFD) Generation Gathering System (NGGS). 16/18/24
2006
(Kazakhstan)
Snam Rete Gas Gas Pipeline Palmi-Martirano. 2004
47 S.p.A. Section Palmi - Rosarno and Maida- Martirano 47 48 2006
(Italy) (J.V. with Cambareri Giuseppe & C. S.p.A.)
TOTAL FINA ELF Great Mabruk Pipeline - EPSCC1. 4/6/ 2004
48 59
(Libya) Installation of Trunklines, Flowlines, Export Pipelines and Power Cables. 8/10 2005
Parsons Fluor Gas Export Expansion Project for Tengizchevroil.
Daniel International Gas Pipeline from Tengiz Camp to Kulsary Scraper Receiving Facility. 2003
49 121 40
LLC (PFD) Construction and Commissioning of Gas Pipeline. 2005
(Kazakhstan) (J.V. with Bonatti)
Agip Kazakhstan
North Caspian Plant Site Preparation and Piling Installation - Early Works, Experimental Programme, Kashagan East Field CIVIL 2003
50 Operating Company Development, Kazakhstan. N/A
WORKS 2005
N.V. (IGS-SICIM LLC J.V.)
(Kazakhstan)
Agip Kazakhstan
North Caspian Early Works Fuel Gas & Water Pipeline Phase 1A & 1B , Experimental Programme, Kashagan East Field 2003
51 Operating Company Development, Kazakhstan. Civil Works. 51,2 12/16 2005
N.V. (J.V. with Bonatti)
(Kazakhstan)
Agip Kazakhstan
North Caspian Camp Utilities - Early Works, Experimental Programme, Kashagan East Field Development, Kazakhstan. PLANT 2003
52 Operating Company Plant Works. VARIOUS
WORKS 2005
N.V. (J.V. with Bonatti)
(Kazakhstan)
Gaz du Sud Ouest EUSKADOUR Project 2004
53 24 24
(France) Construction of the Biriatou-Arcangues Gas Pipeline 2005
EUPEC
54 Total Forvie Mer du Nord, Welding Works, Double Joint. 32 15/17 2005
(France)
Snam Rete Gas Gasline Pontremoli - Parma. 2003
55 S.p.A. Pipeline installation accross the Appennini Mountains (North of Italy) including execution of approximately 15,5 30 2004
(Italy) 200 m of tunnel with Raise Boring tecnologies
Gas Pipeline to Galway City.
BORD GAIS Lot 1: Cappagh South to Ballymoneen Pipeline
56 EIREANN 30 12/26 2004
Lot 2: Ballymoneen to Ballygarraun Pipeline
(Ireland) (SICIM ROADBRIDGE LTD)
Karachaganak
Petroleum Provision of Telemetry System for Gas and Condensate Export Pipelines UPGRADING 2003
57 VARIOUS
Operating BV (IGS-SICIM LLC J.V.) WORKS 2004
(NL)
Enags S.A. Gas Pipeline Santa Cruz de Mudela-Salida a Cuenca. 2003
58 159 32
(Spain) (J.V. with COPISA Industrial) 2004
Karachaganak
Petroleum Infield Pipelines - Package A 6/10/ 2002
59 36
Operating BV (IGS-SICIM LLC J.V.) 14/20 2003
(NL)
Karachaganak Water Project Phase II - Industrial Water Pumping Station
Petroleum PLANT 2002
60 Installation, Construction, Commissioning and Test for the Industrial Water Intake & Treatment Facilities. N/A
Operating BV WORKS 2003
(IGS-SICIM LLC J.V.)
(NL)
Gaz de France Construction of Gas Pipeline Sections:
61 23,1 10/12 2003
(France) Meslin - Ploufragan and Durrenentzen - Colmar
North America / Mexico

Gasoducto Corredor
Chihuahua
San Isidro - El Encino
Construction of 36 Gas Pipeline from San Isidro
(Cd. Juarez) to El Encino (Chihuahua)

The construction of a 383 km long, 36-inch diameter, natural gas pipeline with
a capacity of up to 850 MMCFD for the provision of natural gas, contemplates
a pipeline commencing at an interconnection receipt point to be located on
Mexican territory near the border with the United States of America, at the
interconnection with the new line of 36 pipeline of El Paso Natural Gas and
ending at the site of the power plant(s) located at El Encino, State of Chihuahua.
Gas transport services was commenced on July 30, 2013. Pipeline is in service
and is able to serve an initial load of 95 MMCFD to the Norte II power plant.
The pipeline System have a guaranteed capacity of 850 MMCFD since the
beginning.

The project has been divided into two sections:


- SECTION NORTH: Starting at the San Isidro Station (U.S. border) up to Pig
trap Station MLV 505 located at the KP. 132+000 (Ojo Caliente).
- SECTION SOUTH: Beginning at the Pig trap Station MLV 505 located at the
K.P. 132+000 (Ojo Caliente) up to the Station El Encino (Chihuahua) at KP.
383+000.
In order to perform the work Sicim used 2 work fronts located in 2 different
camps, each one with 450 persons capacity. The camps have been built on
the KP. 132+000 (Camp of Carrizales) and KP. 208+000 (Camp. Of Terrazas).
Location: Chihuahua North of Mexico

Client: Tharaumara

Consulting CH2M HILL


engineering company:

Project data: Pipe OD: 36 in API 5L X70, with wall thickness between 11.13
mm and 17.47 mm.
Natural gas.
Design conditions: - Pressure: the maximum operating pressure for the pipeline
will be 82.74 bar.
- Temperature: temperatures of GAS at the delivery point shall
be between 10 C and 50 C.
- Pipe roughness: the carbon steel pipe is new, protected
externally with FBE. Pipeline not internally coated. Pipes
delivered by Tubacero (Mexican Contractor) and Berg (US
Contractor).
- Flow: pipeline shall serve an initial flow rate of 95 MMCFD
(2.69 Millions of cubic meters per day) for the first 2 years of
operations and, a flow rate of 850 MMCFD (24.0693 Millions
of cubic meters per day) after the first 2 years.

Scope of work: The construction of a 381 km long, 36-inch diameter pipeline


for the provision of natural gas, to certain CFE power plants in
the State of Chihuahua, Mexico

Completion: January 2012 - July 2013

Project Description: The project consists of the design, procurement & construction,
of a gas pipeline system:
a. 381,000 meters long and 36 of diameter.
b. 14 block valves along the path.
c. At the interconnection, receipt and delivery pig-trap, with a
control valve to be operated and controlled by the SCADA
system.
d. Border interconnection pipe and fitting.
e. 2 intermediate receipt and delivery pig-traps.
f. A measurement, regulation and control station (EMRC) at
the delivery points (El Encino) with a corresponding pig-trap
receiver.
g. Assistance to erection for the interconnection with the El
Paso Natural Gas pipeline within the Mexican territory.
Europe / France

Projet GIRLAND
EPC Ligne
Installation of a pipeline and switching stations, DN 36

The GIRLAND Project consists in the implementation and installation of the DN


900 gas pipeline and its ancillary works, over a distance of about 58,1km from
the Lussagnet to Captieux Est in the South West of France, in order to double
the network capacity (72% parallel to the existing DN700/DN600 pipelines from
the Lussagnet underground storage area to the Captieux Est mainline block
valve station).
The EPC Contract services listed in the TIGF Contract for the implementation of
the Girland projects installations mainly included the following:
- Detailed engineering and preparation of all required documents, including
execution drawings and final documentation,
- Procurement and/or manufacture of equipment and materials, including
monitoring, follow up, inspection, transportation and storage (long term
equipment procurement excluded),
- Reception, and workshop or on-site storage of all TIGF equipment and
materials,
- Optimization of the workshop prefabrication and assembly, including all or part
of the SICIM equipment and materials and all or part of the TIGF equipment
and materials delivered to the SICIM workshop,
- Transportation, unloading, setting up and on-site connection of the
prefabricated spread parts and facilities, and of any other equipment and
materials,
- Pre-commissioning of the on-site installations,
- Technical assistance to TIGF for the commissioning and starting-up of the
installations,
- Any optional service requested by TIGF for this project.

The work consisted of:


- laying of the 58,1km pipeline DN 900 (36) between Lussagnet to Captieux
Est;
- installation of three valve stations: Le Freche, Retjons, Captieux Est ;
- 1 horizontal directional drillings located under the La Douze (650ml);
- 9 horizontal drillings;
- 17 road crossings by open cut for a total of about 360 meters;
- 1 directional microtunnelling for Estampon river for a total length 250ml;
- construction of structures dedicated to collection & management of rainwaters,
etc.
The work was performed in accordance with the TIGF objectives:
- Objectives achieved in terms of Health, Safety and Environment;
- Preservation of the environment by taking into account the Water Act
Dossier;
- Satisfaction of the Administration, especially the DDTM (Direction
Dpartementale des Territoires et de la Mer);
- Compliance with the local content requirements;
- Compliance with key dates targeting the pipeline commissioning.

Location: Saint Justin (Landes) - South West of France

Client: TIGF (Transport Infrastructures Gaz France)

Consulting SICIM France / IDR


engineering company:

Type of contract: EPC Engineering Procurement Construction

Project data: Pipe DN 900 (36), Total length 58,1 km


Pipe Material & Grade:
- L485 MB Cat. B, th=13,78mm mini / 14,5mm nominal
- L485 MB Cat. C, th=20,24mm mini / 21,3mm nominal

Design conditions: - Design pressure: 85 bar


- Hydraulic test pressure: 120 bar
- Drying Dew Point: - 20C

Scope of work: - Laying of the 58,1km pipeline DN 900 (36) between


Lussagnet underground storage area to the Captieux Est
mainline block valve station
- installation of three valve stations: Le Freche, Retjons,
Captieux Est
- Tie-ins at Captieux Est, Retjons and Le Freche to an existing
gas network

Completion: March 2012 October 2013

Project Description: - 17 Roads crossings,


- 17 stream and river crossings including the Midou, Douze
and Estampon rivers,
- 42,3Km = 72% parallel to the existing DN700/DN600
pipelines
- 27 crossing of hot lines DN600 and DN700 existing

Ground Condition: - 15 ha of wetlands primarily along rivers and presence of a


lagoon Retjons
- Project affected by 2 soil facies predominantly. Sandy part of
the Landes between Captieux and St. Justin and clay facies
dominated on the Armagnac part between St. Justin and
Lussagnet
- 2 Natura 2000 protected natual areas: river system of the
tributaries of Midouze and River system of Midou and Ludon

Mainline Welding - Automatic Welding (GMAW)


(width % defects): - Manual Welding (SMAW)

Pipeline protective - L485 MB Cat. B: Polyethylene (3mm) > Line


coating: - L485 MB Cat. C, Polypropylene > Valve stations and HDD
- Concrete coating (150mm) for steam and river crossing

Personnel Hours 422.899


worked:

HSE statistics: Frequency Rate: 2,03


Severity Rate: 83,3
Europe / Spain

Gasoducto Martorell
-Figueres Tramo Sur
Construction of Gas Pipeline from Barcelona to Girona (36)

ENAGS, in order to fulfill social objective, plans to expand transportation


capacity and gas supply in the provinces of Barcelona and Gerona, by building
the pipeline MARTORELL - FIGUERES, starting from the MLV 5D, in the Municipal
District of Castellvi Rosanes (Barcelona) to MLV 5D.10 destination point in the
Municipal District of Avinyonet of Puigvents (Gerona). This end point will be
the source of future pipeline FIGUERES FRENCH BORDER

This schedule list, among others, the gas transport infrastructure to be


developed, considering priority those included in Category A, ie projects
approved without any constraint. The Pipeline MARTORELL - FIGUERES is
included in this category.

The project has been divided into two sections:


- SECTION NORTH: Begining at the start of the position 5D.06 in the TM
Hostalric (Gerona) and ends at the MLV 5D.10 in the TM of Avinyonet of
Puigventos (Gerona).
- SECTION SOUTH: Starting at the MLV 5D of the splitting existing pipeline
Barcelona - Bilbao - Valencia (BBV) LArbo - Barcelona Plant in the TM
Castellvi Rosanes (Barcelona) and ends at the position in the MLV 5D.06
Hostalric (Gerona).
Location: Barcelona North East of Spain

Client: ENAGS

Consulting HYMO
engineering company:

Type of contract: EPC Engineering Procurement Construction

Project data: Pipe OD: 36 in API 5L X70, with wall thickness between
11.1mm and 19.1mm.
Natural gas will be transported.

Design conditions: - PRESSURE


The maximum operating pressure for the pipeline will be 80
bar
- TEMPERATURE
Temperatures are considered as boundaries of the transported
natural gas, the following:
Maximum: 45 C (in the first 30 km of line) 12 C approx.
(for the rest of the line)
Minimum 0 C (over the route)
A hydraulic calculation purposes use a temperature of 15 C.
- PIPE ROUGHNESS
The carbon steel pipe is new, protected internally with
Epoxy. Considered roughness throughout the pipeline is
0,015mm.
- FLOW
We have obtained the maximum admissible flow, so that the
final pressure is at least 50 bar and a maximum gas velocity
of 10 m/s.

Scope of work: Construction of 89 Km of new high pressure 36-inch gas


pipeline, crossing the provinces of Barcelona and Girona.

Completion: October 11 August 12

Project Description: - The pipeline originates in the existing MLV 5D split Pipeline
BBV Tramo LArbo-Plant Barcelona, located in Castellvi of
Rosanes.
- The end of the line is MLV 5D.06 in Hostalric, province of
Girona.
- There are 6 MLVs and 51 crossing (bored and open cut).

Mainline Welding: - Automatic Welding (GTAW) (according to API 1104)


- Manual Welding (SMAW) (according to API 1104)
Europe / Italy
Asia
Asia//Kazakhstan
Kazakhstan

Kulsary
SGI/SGP project
Kossagyl
Tengiz field
EP
40 GE

Oil gathering and gas flowlines of various diameters


from 2 up to 24
Karaton Additional trunklines/flowlines.
Fabbrication, installation and testing of piping works
Caspian Sea

Tengiz

TENGIZ FIELD

o
40 GEEP

6
16

The Tengiz Field, in western Kazakhstan, is located in the swamplands along the
northeast shores of the Caspian Sea. Discovered in 1979, the Tengiz oil field is one
of the largest discoveries in recent history. The city of Atyrau, 350 kilometres north
of Tengiz, is the main transport hub of Tengiz oil.
The Tengiz field will be entering a new phase of production with the construction of
the Second Generation Project (SGP) and the introduction of Sour Gas Injection
(SGI). This development started in 2004 and expected to require a total investment
of $3 billion (SGP $2.2 billion and SGI $800 million) by the scheduled completion
date of 2007.
6
Subsequent to the successful installation of the 40-inch Gas Expansion Export pipe-
6 line (GEEP), SICIM S.p.A. was awarded a contract for the installation of approxima-
tely 96 km of various diameter pipelines (up to 24). Mainly Oil Gathering Flowlines
and Trunklines in sour service and Fuel Gas Lines plus all related A.G.I. (Metering
Stations, Junctions and Manifolds).
These works were executed in the period from August 2006 to April 2006, when all
hydrotest activities were completed, all lines dewatered and finally commissioned
with the product.
Thanks to the excellent performances on this Project, either in terms of safety (0 LTI),
quality and progress, PFD/TCO expanded the original scope of work to include the
installation of additional pipelines and facilities, the testing and pre-commissioning
of pipelines and plants pipe works installed by others and all other activities required
to bring up to stream the oil field gathering system and the SGP Process Plant.
The contract duration was consequently extended to Summer 2007
In carrying out this work, SICIM S.p.A developed and implemented a Project Mana-
gement System which incorporated Quality, Safety, Environmental, Employee Re-
lations and Plant Management for all projects. The key element is the use of core
procedures and core mechanisms from UNI EN ISO 9001:2000 to make our plans
more dynamic and to ensure that all objectives are identified and achieved.

Location: Tengiz Field, Atyrau Region, Republic of Kazakhstan

Client: PARSONS FLUOR DANIEL JV (PFD)/TENGIZCHEVROIL


(TCO)

Type of contract: Lump Sum plus re-measurable and T&M activities

Project data: Pipe O.D. (from 2 up to 24) km 96


API 5L X60/API 5L X52 Thk: 3.9 up to 17.5 mm
Scope of work: SGP Second Generation Project NGGS Next Genera-
tion Gathering System

Original Scope of Work


(PFD Contract No. 571502-4-1922):
23 Lines of various diameters from 2 up to 24 Oil
Gathering and Gas Flowlines for a total length of 96 km,
including installation of relevant pipeworks and facilities
in Wellsites, Metering Stations and Manifolds

Additional Scope of Work


(PFD Contract No. 571500-4-1960/1962):
Additional trunklines, flowlines, fuel gas lines and high
pressure sour gas lines for a total length of 50 km.
Pre-commissioning activities (Hydrotest and drying) for
several pipelines installed by others (approx. 150km).
Fabrication. installation, testing and reinstatement of
piping works (diameter up to 56) within the Flare Area
and the SGP Plant .
Completion: June, 2006 extended to July 2007

Ground condition: Sand and silty ground in warm season, frosty ground in
winter season.
Mainline welding: Manual welding (SMAW) (according to API 1104)
Manual welding (GTAW) (according to API 1104)

Pipeline Phenolic Epoxy


protective coating:

Personnel 400 (average) 600 (peak) 1,800,000 man-hours worked


Hours worked: up to December 2006 2,500,000 estimate total to com-
pletion
Europe / Italy
SICIM BRANCHES SICIM
PARTICIPATED COMPANIES
SICIM S.p.A.
Succursale de France SICIM IRELAND LTD
11, Avenue de lEurope Gray Office Park,
67300 Schiltigheim - France Headford Road,
phone: +33 3 88 62 04 01 Galway
fax: +33 3 88 62 08 13 phone: +353 91 511474
fax: +353 91 511497
SICIM S.p.A.
Sucursal en Espaa SICIM ROADBRIDGE LTD
Registered Office 1 Mount Kennett Place
Calle Principe de Vergara nr. 126 Henry Street
Planta 1 E-F Limerick - Ireland
28002 Madrid - Spain phone: +353 61 414874
phone: +34 671745617 fax: +353 61 414767
SICIM S.p.A. SICIM ANGOLA LDA
Zweigniederlassung Deutschalnd Rua Kwamme Nkrumah n 256
Am Waldschlchen 2 Ingombota - Luanda
01099 Dresden - Deutschland Republica de Angola
phone: +49 3732 315378128
SICIM MOAMBIQUE, LIMITADA
SICIM S.p.A. Moambique, Maputo Cidade
Succursale Cameroun DISTRITO URBANO 1
164, rue Toyota Bonapriso Bairro Central, Av. Zedequias
Douala - Cameroon Manganhela N 267, Edificio Jat
IV 5 Andar
SICIM S.p.A.
Succursale de Congo SICIM LIBYA FOR OIL SERVICES
153, Avenue Stephane Tchitchielle Angila
BP 700 - Pointe Noire P.O. Box 84471
Rpublique Du Congo Tripoli - Libya
phone: +242 0535 72225 phone: +218 21 7154895
fax: +218 21 4863518
SICIM S.p.A.
Libyan Branch GDI-SICIM PIPELINES S.A. DE C.V.
Gargaresh Street - Abu Navas Calle Fermin G. Riestra # 1598-A
P.O. Box 84471 Col. Moderna
Tripoli - Libya C.P. 44190
phone: +218 91 3223759 Guadalajara, Jalisco - Mexico
fax: +218 21 4863518 phone: +52 33 3810 3302

SICIM S.p.A. CONSTRUCTORA SICIM S.A. DE C.V.


Boulevard Avila Camacho 40
Kazakhstan Branch Torre Esmeralda 1, piso 10
Industrial Base 12 Colonia Lomas de Chapultepec
Karabatan Station Industrial Area 11000 Distrito Federal Mexico
060011 Atyrau phone: +52 55 26237101
Republic of Kazakhstan
phone: +7 7122 550080 SICIM CANADA LTD.
fax: +7 7122 550080 1200 Waterfront Centre
200 Burrard Street
SICIM S.p.A. Vancouver BC V6C 3L6
Turkmenistan Branch Canada
Yimpash Business Centre, Office #61
54 Turkembashi Shayoly Avenue SICIM PIPELINES PVT. LTD
Ashgabat 744017, Turkmenistan Registered Office
mobile phone: +993 65 718248 No. 29, Bowring Hospital Road
office phone: +993 12 456444 Maliks Building, 1st Floor
Bangalore 560 001 - India
SICIM S.p.A. phone: +91 80 22862521, 22862522
Iraq Branch fax: +91 80 22862523
Abu a khaseeb
Bradeah No. 14/32
County No. 29
Basrah
Iraq
Phone: +964 7809249601
SICIM S.p.A.
Sucursal del Per
Calle Martir Jos Olaya, 129 WORLDWIDE EPC SOLUTIONS FOR OIL & GAS SINCE 1962
3 piso Oficina 303
Miraflores Lima
Per
phone: +51 242 5511 SICIM S.p.A.
SICIM COLOMBIA Via Consolatico Superiore, 96 - 43011 Busseto (PR) - Italy
Sucursal de SICIM S.p.A. Tel. +39 0524 930211 - Fax +39 0524 930082