Date: 15-Sept-2017
From To
00:00 01:00
01:00 06:00
06:00 12:00
12:00 13:00
13:00 18:00
18:00 20:30
20:30 21:00
21:00 00:15
Date: 16-Sept-2017
From To
00:15 01:15
01:15 02:30
02:30 05:30
Pits Capacity
PIT#1 580
PIT#2 580
PIT#3 380
PIT#4 A 170
PIT#4 B 94
PIT#4 C 94
PIT#6 80
PIT#7 360
PIT#8 225
PIT#9 150
PIT#10 460
PIT#11 460
PIT#12 500
PIT#13 480
Sand traps 600
Reserve PIT#1 460
Reserve PIT#2 460
Brine Tank 2300
TRIP Tank 50
Mixing Pump Manifold
STRIP TANK
Transfer Pump Manifold
Mud Pump Manifold/Buffe
Choke Manifold
Kill Manifold
Marine Manifold
PIT CLEANING TIMELINE
017
Details
Opening PTW and mobilizing equipment to clean Pit 3.
Cleaning Pit-3 , Gumbo box, ditches, shakers with 8 personnel.
Cleaning tanks Pit 3 & Pit 7 & Manifold
Filtration unit made ready
Filtration of Brine
Preparing Brine 11.2 ppg , inspecting lines , Pits ( density & NTU )
Held PJSM for Filtered Brine Displacement while circulating SW ( NTU out of the well
-13 )
Displaced the well with Filtered CaCl2 brine 11.2 ppg ( Pits Avg NTU - 14 ). Total
strokes 12000. Filtered CaCl2 brine out of the well - NTU 27.
017
Details
Circulated 866 bbl (7250 stk) of Filtered brine from the well to Pit # 2 > Filtration
Equipment > Pit # 1 > Mud Pumps. Filtration Equipment were capable to handle 450 -
500 gpm on the fly. NTU out of the well : 01:30 = 25 , 02:00 = 25 , 02:15 = 21 , 02:30 =
19 . NTU out of the Filtration Eqpt = 7.
P.O.O.H.
CLEANED
CLEANING IS IN PROGRESS
DIRTY
MW (ppg)
11.2
10.5
11.4
11.2
PIT CLEANING TIMELINE
Date: 19-Aug-2017
From To
18:00 24:00
Date: 20-Aug-2017
From To
0000 10:00
10:00 20:00
20:00 24:00
Date: 21-Aug-2017
From To
0000 06:00
06:00 20:00
20:00 24:00
Date: 22-Aug-2017
From To
0000 03:00
03:00 06:00
06:00 12:00
12:00 24:00
Date: 23-Aug-2017
From To
0000 10:30
09:30 10:30
10:30 12:00
Pits Capacity
PIT#1 580
PIT#2 580
PIT#3 380
PIT#4 A 170
PIT#4 B 94
PIT#4 C 94
PIT#6 80
PIT#7 360
PIT#8 225
PIT#9 150
PIT#10 460
PIT#11 460
PIT#12 500
PIT#13 480
Sand traps 530
Reserve PIT#1 460
Reserve PIT#2 460
Brine Tank
Note: We have TEN more tanks yet to be cleaned denoted by Red Colour.
PIT CLEANING TIMELINE
017
Details
Cleaning Pit-1
017
Details
Cleaning Pit-1
Cleaning Pit-2
Mixed PHG in Pit-1 & Pit-2
017
Details
Mixed PHG & clear the Bentonite plugged line
Cleaning Pit-3
Cleaning Pit-4A
017
Details
Cleaning Pit-4A
Backload SOBM to OSV Fulmar
Resumed Cleaning Pit-4A & Sand Traps, Gumbo Ditch
Cleaning Pit-4B
017
Details
Cleaning Pit-4C & WBM mixing in Pit-3 (Personnel working on Mud Pumps)
Cleaning Santrap Tanks (Personnel Moved to Rig floor)
Cleaning Pit-4C & Filling Seawater / Baraklean in Pit # 4A & 4B
CLEAN TANKS
CURRENTLY CLEANING IN PROGRESS
YET TO BE CLEANED
Note: We have TEN more tanks yet to be cleaned denoted by Red Colour.