Lab Tanah Sentul 1
Lab Tanah Sentul 1
Juni 17
0.00
Lempung, coklat
Contoh : I (- 0,80 - 1,20) m
Lempung, coklat
- 3.00
KETERANGAN :
Muka Air Tanah (MAT) tidak dijumpai.
PROJECT : PROYEK DETAIL DESAIN DAM PARIT DAS BEKASI HULU BORING NO : HB-2 (dua)
LOCATION : (-6.6176,106.9037), JAWA BARAT ELEVATION : 0,00 m (MTS) SHEET NO : 1
STANDARD PENETRATION TEST qu
CORE
DEPTH BORING N = Number of Blows P = Penetration (cm) POCKET
DATE RECOVERY LITHOLOGIC DESCRIPTION
(m) PROFILE N PENETRO
N/P N/P N/P Remark %
0 10 20 30 40 50 60 METER
Juni 17
0.00
Lempung, coklat
Contoh : I (- 1,00 - 1,40) m
- 1.60
Batu lempung
- 2.00
KETERANGAN :
Muka Air Tanah (MAT) tidak dijumpai.
PROJECT : PROYEK DETAIL DESAIN DAM PARIT DAS BEKASI HULU BORING NO : HB-3 (tiga)
LOCATION : (-6.5648,106.958), JAWA BARAT ELEVATION : 0,00 m (MTS) SHEET NO : 1
STANDARD PENETRATION TEST qu
CORE
DEPTH BORING N = Number of Blows P = Penetration (cm) POCKET
DATE RECOVERY LITHOLOGIC DESCRIPTION
(m) PROFILE N PENETRO
N/P N/P N/P Remark %
0 10 20 30 40 50 60 METER
Juni 17
0.00
Lempung pasiran
Contoh : I (- 0,40 - 0,80) m
- 1.20
Batu lempung
Batas akhir pemboran (> -1.20m)
KETERANGAN :
Muka Air Tanah (MAT) tidak dijumpai.
PROJECT : PROYEK DETAIL DESAIN DAM PARIT DAS BEKASI HULU BORING NO : HB-4 (empat)
LOCATION : (-6.6206,106.9084), JAWA BARAT ELEVATION : 0,00 m (MTS) SHEET NO : 1
STANDARD PENETRATION TEST qu
CORE
DEPTH BORING N = Number of Blows P = Penetration (cm) POCKET
DATE RECOVERY LITHOLOGIC DESCRIPTION
(m) PROFILE N PENETRO
N/P N/P N/P Remark %
0 10 20 30 40 50 60 METER
Juni 17
0.00
Lempung pasiran, coklat
Contoh : I (- 0,40 - 0,80) m
- 1.20
Batu lempung
Batas akhir pemboran (> -1.20m)
KETERANGAN :
Muka Air Tanah (MAT) tidak dijumpai.
PROJECT : PROYEK DETAIL DESAIN DAM PARIT DAS BEKASI HULU BORING NO : HB-5 (lima)
LOCATION : (-6.6214,106.9085), JAWA BARAT ELEVATION : 0,00 m (MTS) SHEET NO : 1
STANDARD PENETRATION TEST qu
CORE
DEPTH BORING N = Number of Blows P = Penetration (cm) POCKET
DATE RECOVERY LITHOLOGIC DESCRIPTION
(m) PROFILE N PENETRO
N/P N/P N/P Remark %
0 10 20 30 40 50 60 METER
Juni 17
0.00
Lempung pasiran
Contoh : I (- 0,80 - 1,20) m
- 1.40
Batu lempung
- 1.60
KETERANGAN :
Muka Air Tanah (MAT) tidak dijumpai.
PROJECT : PROYEK DETAIL DESAIN DAM PARIT DAS BEKASI HULU BORING NO : HB-6 (enam)
LOCATION : (-6.5715,106.9544), JAWA BARAT ELEVATION : 0,00 m (MTS) SHEET NO : 1
STANDARD PENETRATION TEST qu
CORE
DEPTH BORING N = Number of Blows P = Penetration (cm) POCKET
DATE RECOVERY LITHOLOGIC DESCRIPTION
(m) PROFILE N PENETRO
N/P N/P N/P Remark %
0 10 20 30 40 50 60 METER
Juni 17
0.00
Lempung pasiran
Contoh : I (- 0,80 - 1,20) m
- 1.20
- 1.40
Batu lempung
Batas akhir pemboran (> -1.40 m)
KETERANGAN :
Muka Air Tanah (MAT) tidak dijumpai.
FIELD WORK CONE PENETRATION Date : JUNI 2017
0 0 0 10 FR
0 150 300 450 Tf
0 2 4 6 Fs
0
Qc 10 20 30 40 Qc
50 60 70 80 90 100
Qc 110 120 130 140 150
Qc 160 170 Qc
180
0.00
0.50
1.00
1.50
2.00
Depth in meter
2.50
3.00
3.50
4.00
4.50
5.00
Sounding No : S-01 Project : DETAIL DESAIN DAM PARIT DAS BEKASI HULU
Depth in meter : 5.40 Location : (-6.6205,106.9064), JAWA BARAT
qc (Kg/cm2) : 150 Koordinat : X = 699092.734 Y = 9254256.890 Z = 483.780 (Elev.)
Fs (Kg/cm2) : 1.00 Elevasi : 0.00 Area Of Manth : 150.00 Area Of Cone : 10.00
Tf (Kg/cm) : 437.33 Tested By : Obay Operator : -
FR [fs/qc (%)] : 0.87 Keterangan :
SOUNDING TEST RESULT
Date of test : JUNI 2017
KETERANGAN :
0 0 0 10 FR
0 100 200 300 Tf
0 2 4 6 Fs
0
Qc 10 20 30 40 Qc
50 60 70 80 90 100
Qc 110 120 130 140 150
Qc 160 170 Qc
180
0.00
0.20
0.40
0.60
0.80
1.00
1.20
Depth in meter
1.40
1.60
1.80
2.00
2.20
2.40
2.60
Fs = 2.93 FR = 3.22
Tf = 192.00
2.80
qc >= 150
3.00
Sounding No : S-02 Project : DETAIL DESAIN DAM PARIT DAS BEKASI HULU
Depth in meter : 2.80 Location : (-6.6176,106.9037), JAWA BARAT
qc (Kg/cm2) : 150 Koordinat : X = 699092.734 Y = 9254256.890 Z = 483.780 (Elev.)
Fs (Kg/cm2) : 2.93 Elevasi : 0.00 Area Of Manth : 150.00 Area Of Cone : 10.00
Tf (Kg/cm) : 192.00 Tested By : Obay Operator : -
FR [fs/qc (%)] : 3.22 Keterangan :
SOUNDING TEST RESULT
Date of test : JUNI 2017
KETERANGAN :
0 0 0 10 FR
0 100 200 300 Tf
0 2 4 6 Fs
0
Qc 10 20 30 40 Qc
50 60 70 80 90 100
Qc 110 120 130 140 150
Qc 160 170 Qc
180
0.00
0.20
0.40
0.60
0.80
Depth in meter
1.00
1.20
1.40
Tf = 238.67
1.60
Fs = 3.67 FR = 3.67
1.80
qc >= 150
2.00
Sounding No : S-03 Project : DETAIL DESAIN DAM PARIT DAS BEKASI HULU
Depth in meter : 1.80 Location : (-6.5648,106.958), JAWA BARAT
qc (Kg/cm2) : 150 Koordinat : X = 699092.734 Y = 9254256.890 Z = 483.780 (Elev.)
Fs (Kg/cm2) : 3.67 Elevasi : 0.00 Area Of Manth : 150.00 Area Of Cone : 10.00
Tf (Kg/cm) : 238.67 Tested By : Obay Operator : -
FR [fs/qc (%)] : 3.67 Keterangan :
SOUNDING TEST RESULT
Date of test : JUNI 2017
KETERANGAN :
0 0 0 10 FR
0 100 200 300 Tf
0 2 4 6 Fs
0
Qc 10 20 30 40 Qc
50 60 70 80 90 100
Qc 110 120 130 140 150
Qc 160 170 Qc
180
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
Depth in meter
0.80
0.90
1.00
1.10
1.20
1.30
1.40
Fs = 2.33 FR = 1.87 Tf = 233.33
1.50
1.60
qc >= 150
1.70
Sounding No : S-04 Project : DETAIL DESAIN DAM PARIT DAS BEKASI HULU
Depth in meter : 1.60 Location : (-6.6206,106.9084), JAWA BARAT
qc (Kg/cm2) : 150 Koordinat : X = 699092.734 Y = 9254256.890 Z = 483.780 (Elev.)
Fs (Kg/cm2) : 2.33 Elevasi : 0.00 Area Of Manth : 150.00 Area Of Cone : 10.00
Tf (Kg/cm) : 233.33 Tested By : Obay Operator : -
FR [fs/qc (%)] : 1.87 Keterangan :
SOUNDING TEST RESULT
Date of test : JUNI 2017
KETERANGAN :
0 0 0 15 FR
0 100 200 300 Tf
0 2 4 6 Fs
0
Qc 10 20 30 40 Qc
50 60 70 80 90 100
Qc 110 120 130 140 150
Qc 160 170 Qc
180
0.00
0.20
0.40
0.60
0.80
1.00
Depth in meter
1.20
1.40
1.60
1.80
2.00 FR = 1.29
Fs = 1.47 Tf = 204.00
2.20
qc >= 150
2.40
Sounding No : S-05 Project : DETAIL DESAIN DAM PARIT DAS BEKASI HULU
Depth in meter : 2.20 Location : (-6.6214,106.9085), JAWA BARAT
qc (Kg/cm2) : 150 Koordinat : X = 699092.734 Y = 9254256.890 Z = 483.780 (Elev.)
Fs (Kg/cm2) : 1.47 Elevasi : 0.00 Area Of Manth : 150.00 Area Of Cone : 10.00
Tf (Kg/cm) : 204.00 Tested By : Obay Operator : -
FR [fs/qc (%)] : 1.29 Keterangan :
SOUNDING TEST RESULT
Date of test : JUNI 2017
KETERANGAN :
0 0 0 10 FR
0 50 100 150 Tf
0 2 4 6 Fs
0
Qc 10 20 30 40 Qc
50 60 70 80 90 100
Qc 110 120 130 140 150
Qc 160 170 Qc
180
0.00
0.10
0.20
0.30
0.40
0.50
0.60
Depth in meter
0.70
0.80
0.90
1.00
1.10
1.20
Fs = 1.67 Tf = 108.00 FR = 4.17
1.30
1.40
qc >= 150
1.50
Sounding No : S-06 Project : DETAIL DESAIN DAM PARIT DAS BEKASI HULU
Depth in meter : 1.40 Location : (-6.5715,106.9544), JAWA BARAT
qc (Kg/cm2) : 150 Koordinat : X = 699092.734 Y = 9254256.890 Z = 483.780 (Elev.)
Fs (Kg/cm2) : 1.67 Elevasi : 0.00 Area Of Manth : 150.00 Area Of Cone : 10.00
Tf (Kg/cm) : 108.00 Tested By : Obay Operator : -
FR [fs/qc (%)] : 4.17 Keterangan :
SOUNDING TEST RESULT
Date of test : JUNI 2017
KETERANGAN :