6 CHW Pump - KW
HVAC
S.No Description Te
PCHWP -01 TO 4 - constant speed - 30.71 l/s @ 150 Kpa - 1.5 SPP/ B& G
Bar - ( 3 Duty & 1 Stand By) /Flowserve
SCHWP -01 TO 4 - With VFD - 30.71 l/s @ 400 Kpa - 4.0 Bar ( 3
Duty & 1 Stand By)
Aluminium Cladding
HVAC
S.No Description Te
Ducting
Piping
Acoustic Lining
VAV Box
13 Air Outlets
SAD - Supply Air Diffuser
14 Dampers
VCD
HVAC
S.No Description Te
FD
HVAC
S.No Description Te
MSFD
NRD
HVAC
S.No Description Te
15 SA - Sound Attenuator
16 Louvers
EAL - Exhaust Air Louver
17 CO Sensor
Control Panel
CO2 Sensor
70% Fittings
HVAC
S.No Description Te
CHW Pipe Insulation - Supply Fibre Glass
19 insulation
50% Fittings
50,000.00
1 Item 45,000.00
Size in MM
150 x 150 2 No's 50.00 100.00
225 x 225 13 No's 60.00 780.00
250X100 1 No's 60.00 60.00
300 x 300 57 No's 80.00 4,560.00
350X350 3 No's 100.00 300.00
450X450 78 No's 100.00 7,800.00
-
225 x 225 12 No's 45.00 540.00
300 x 300 53 No's 55.00 2,915.00
350X350 3 No's 75.00 225.00
450X450 120 No's 100.00 12,000.00
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
20 No's 110.00 2,200.00
28 No's 100.00 2,800.00
8 No's 110.00 880.00
1 No's 320.00 320.00
4 No's 110.00 440.00
1 Item 250,000.00
-
Dia 200 122 No's 30.00
150 x 100 122 No's 40.00 4,880.00
250 x 150 28 No's 50.00 1,400.00
250 x 200 6 No's 55.00 330.00
300 x 200 18 No's 70.00 1,260.00
300 x 250 12 No's 70.00 840.00
350 x 250 19 No's 70.00 1,330.00
400 x 200 46 No's 80.00 3,680.00
400 x 250 14 No's 80.00 1,120.00
450 x 250 3 No's 80.00 240.00
500 x 250 120 No's 120.00 14,400.00
500 x 300 2 No's 120.00 240.00
550 x 350 17 No's 120.00 2,040.00
600x300 7 No's 140.00 980.00
650x300 4 No's 140.00 560.00
650x350 2 No's 140.00 280.00
700x350 1 No's 160.00 160.00
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
700x400 3 No's 160.00 480.00
700x350 1 No's 160.00 160.00
750x500 1 No's 160.00 160.00
900 x 500 1 No's 250.00 250.00
1000 x 550 1 No's 300.00 300.00
1100 x 500 1 No's 320.00 320.00
1650 x 500 1 No's 550.00 550.00
1900x500 1 No's 600.00 600.00
-
200 x 150 41 No's 100.00 4,100.00
300 x 200 18 No's 100.00 1,800.00
300 x 250 13 No's 100.00 1,300.00
400 x 200 48 No's 120.00 5,760.00
400 x 250 1 No's 120.00 120.00
500 x 300 9 No's 150.00 1,350.00
600x550 7 No's 180.00 1,260.00
750x450 3 No's 180.00 540.00
800 x 450 3 No's 200.00 600.00
900 x500 2 No's 320.00 640.00
1000 x 550 5 No's 350.00 1,750.00
1400x650 8 No's 380.00 3,040.00
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
350x200 1 No's 100.00 100.00
400x250 4 No's 120.00 480.00
450x250 1 No's 120.00 120.00
500x250 8 No's 180.00 1,440.00
550x250 4 No's 180.00 720.00
500x400 5 No's 180.00 900.00
600x250 1 No's 200.00 200.00
650x350 1 No's 200.00 200.00
700x350 4 No's 200.00 800.00
700x400 4 No's 200.00 800.00
900 x 350 1 No's 1,200.00 1,200.00
900 x 500 2 No's 1,500.00 3,000.00
950x950 1 No's 1,500.00 1,500.00
1150x500 3 No's 1,800.00 5,400.00
-
500x400 1 No's 400.00 400.00
650x350 1 No's 700.00 700.00
900x500 1 No's 900.00 900.00
1150x500 1 No's 700.00 700.00
1200x550 2 No's 700.00 1,400.00
-
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
2100X500 1 No's 2,500.00 2,500.00
1200X500 1 No's 1,800.00 1,800.00
1500X800 1 No's 1,800.00 1,800.00
600X300 5 No's 1,000.00 5,000.00
-
-
250x250 11 No's 80.00 880.00
2100X500 1 No's 2,300.00 2,300.00
1200X500 1 No's 1,100.00 1,100.00
1500X800 1 No's 1,300.00 1,300.00
15 mm 29 Rmt
20 mm 131 Rmt 14.00 1,827.83
25 mm 388 Rmt 20.00 7,757.42
32 mm 711 Rmt 26.00 18,485.90
40 mm 392 Rmt 30.00 11,760.21
50 mm 277 Rmt 40.00 11,093.72
65 mm 209 Rmt 80.00 16,713.84
80 mm 10 Rmt 115.00 1,203.02
100 mm 96 Rmt 155.00 14,937.51
125 mm 52 Rmt 200.00 10,381.80
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
150 mm 85 Rmt 300.00 25,538.70
200 mm 142 Rmt 450.00 63,800.55
15 mm 29 Rmt
20 mm 131 Rmt 14.00 1,827.83
25 mm 388 Rmt 20.00 7,757.42
32 mm 711 Rmt 26.00 18,485.90
40 mm 392 Rmt 30.00 11,760.21
50 mm 277 Rmt 40.00 11,093.72
65 mm 209 Rmt 80.00 16,713.84
80 mm 10 Rmt 115.00 1,203.02
100 mm 96 Rmt 155.00 14,937.51
125 mm 52 Rmt 200.00 10,381.80
150 mm 85 Rmt 300.00 25,538.70
200 mm 142 Rmt 450.00 63,800.55
Item 119,699.93
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
15 mm 29 Rmt 4.00
20 mm 131 Rmt 4.00 522.24
25 mm 388 Rmt 5.00 1,939.36
32 mm 711 Rmt 5.00 3,554.98
40 mm 392 Rmt 6.00 2,352.04
50 mm 277 Rmt 7.00 1,941.40
65 mm 209 Rmt 10.00 2,089.23
80 mm 10 Rmt 13.00 135.99
100 mm 96 Rmt 20.00 1,927.42
125 mm 52 Rmt 30.00 1,557.27
150 mm 85 Rmt 35.00 2,979.52
200 mm 142 Rmt 45.00 6,380.06
164,000.00
15 mm 29 Rmt 4.00
20 mm 131 Rmt 4.00 522.24
25 mm 388 Rmt 5.00 1,939.36
32 mm 711 Rmt 5.00 3,554.98
40 mm 392 Rmt 6.00 2,352.04
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
50 mm 277 Rmt 7.00 1,941.40
65 mm 209 Rmt 10.00 2,089.23
80 mm 10 Rmt 13.00 135.99
100 mm 96 Rmt 20.00 1,927.42
125 mm 52 Rmt 30.00 1,557.27
150 mm 85 Rmt 35.00 2,979.52
200 mm 142 Rmt 45.00 6,380.06
105,000.00
-
15 mm 6 No's 600.00 3,600.00
20 mm 8 No's 700.00 5,600.00
25 mm 49 No's 800.00 39,200.00
32 mm 72 No's 1,200.00 86,400.00
40 mm 2 No's 1,500.00 3,000.00
-
40 mm 1 No's 100.00 100.00
50 mm 1 No's 140.00 140.00
65 mm 9 No's 200.00 1,800.00
100 mm 1 No's 300.00 300.00
20 mm No's 120.00 -
40 mm 1 No's 180.00 180.00
50 mm 1 No's 350.00 350.00
65 mm 9 No's 400.00 3,600.00
100 mm 1 No's 1,000.00 1,000.00
OH @1.65 11,063,114.46
Equipment Schedule (Chilled Water FCU)
Floor FCU nos QTY TKW per Unit TR per Unit Total TKW Total TR
GROUND FLOOR Round off
1 1 7.5 2.1 2.14 2.14 2
2 1 4.3 1.2 1.23 1.23 1.5
3 1 2.7 0.8 0.77 0.77 1
4 1 0.6 0.2 0.17 0.17 0.5
5 1 0.5 0.1 0.14 0.14 0.5
6 1 1.3 0.4 0.37 0.37 0.5
7 1 1.3 0.4 0.37 0.37 0.5
8 1 10.2 2.9 2.91 2.91 3
9 1 10.2 2.9 2.91 2.91 3
10 1 5.2 1.5 1.48 1.48 1.5
11 1 0.5 0.1 0.14 0.14 0.5
FIRST FLOOR - - -
Office-01 1 1 9.22 2.6 2.63 2.63 3
Office-01 2 1 9.22 2.6 2.63 2.63 3
Office-01 3 1 9.22 2.6 2.63 2.63 3
Office-01 4 1 9.22 2.6 2.63 2.63 3
Office-01 5 1 9.22 2.6 2.63 2.63 3
Office-01 6 1 9.22 2.6 2.63 2.63 3
Office-01 7 1 9.22 2.6 2.63 2.63 3
Office-01 8 1 9.22 2.6 2.63 2.63 3
Office-01 9 1 9.22 2.6 2.63 2.63 3
Meeting Room 10 1 3.2 0.9 0.91 0.91 1
Meeting Room 11 1 3.8 1.1 1.08 1.08 1
DD office 12 1 8.8 2.5 2.51 2.51 3
Manager office 13 1 6.6 1.9 1.88 1.88 2
Manager office 14 1 6.6 1.9 1.88 1.88 2
Atrium corridor 15 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 16 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 17 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 18 1 7.48 2.1 2.13 2.13 2.5
Corr 19 1 10.1 2.9 2.88 2.88 3
Office-03 20 1 7.4 2.1 2.11 2.11 2.5
Secretary 21 1 4.6 1.3 1.31 1.31 1.5
Office-02 22 1 8 2.3 2.28 2.28 2.5
Office-02 23 1 8 2.3 2.28 2.28 2.5
Office-02 24 1 8 2.3 2.28 2.28 2.5
Office-02 25 1 8 2.3 2.28 2.28 2.5
Office-02 26 1 8 2.3 2.28 2.28 2.5
Office-02 27 1 8 2.3 2.28 2.28 2.5
Gents Lounge 28 1 6 1.7 1.71 1.71 2
Gents Lounge 29 1 6 1.7 1.71 1.71 2
prayer 30 1 8 2.3 2.28 2.28 2.5
toilets 31 1 8.7 2.5 2.48 2.48 2.5
- - -
SECOND FLOOR - - -
Office-01 1 1 9.22 2.6 2.63 2.63 3
Office-01 2 1 9.22 2.6 2.63 2.63 3
Office-01 3 1 9.22 2.6 2.63 2.63 3
Office-01 4 1 9.22 2.6 2.63 2.63 3
Office-01 5 1 9.22 2.6 2.63 2.63 3
Office-01 6 1 9.22 2.6 2.63 2.63 3
Office-01 7 1 9.22 2.6 2.63 2.63 3
Office-01 8 1 9.22 2.6 2.63 2.63 3
Office-01 9 1 9.22 2.6 2.63 2.63 3
Meeting Room 10 1 3.2 0.9 0.91 0.91 1
Meeting Room 11 1 3.8 1.1 1.08 1.08 1
DD office 12 1 8.8 2.5 2.51 2.51 3
Manager office 13 1 6.6 1.9 1.88 1.88 2
Manager office 14 1 6.6 1.9 1.88 1.88 2
Atrium corridor 15 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 16 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 17 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 18 1 7.48 2.1 2.13 2.13 2.5
Corr 19 1 10.1 2.9 2.88 2.88 3
Lift Lobby 20 1 4.9 1.4 1.40 1.40 1.5
Secretary 21 1 7.9 2.3 2.25 2.25 2.5
Office-02 22 1 8 2.3 2.28 2.28 2.5
Office-02 23 1 8 2.3 2.28 2.28 2.5
Office-02 24 1 8 2.3 2.28 2.28 2.5
Office-02 25 1 8 2.3 2.28 2.28 2.5
Office-02 26 1 8 2.3 2.28 2.28 2.5
Office-02 27 1 8 2.3 2.28 2.28 2.5
Gents Lounge 28 1 6 1.7 1.71 1.71 2
Gents Lounge 29 1 6 1.7 1.71 1.71 2
prayer 30 1 8 2.3 2.28 2.28 3
toilets 31 1 8.7 2.5 2.48 2.48 3
- - -
THIRD FLOOR - - -
Office-01 1 1 9.22 2.6 2.63 2.63 3
Office-01 2 1 9.22 2.6 2.63 2.63 3
Office-01 3 1 9.22 2.6 2.63 2.63 3
Office-01 4 1 9.22 2.6 2.63 2.63 3
Office-01 5 1 9.22 2.6 2.63 2.63 3
Office-01 6 1 9.22 2.6 2.63 2.63 3
Office-01 7 1 9.22 2.6 2.63 2.63 3
Office-01 8 1 9.22 2.6 2.63 2.63 3
Office-01 9 1 9.22 2.6 2.63 2.63 3
Meeting Room 10 1 3.2 0.9 0.91 0.91 1
Meeting Room 11 1 3.8 1.1 1.08 1.08 1
DD office 12 1 8.8 2.5 2.51 2.51 3
Manager office 13 1 6.6 1.9 1.88 1.88 2
Manager office 14 1 6.6 1.9 1.88 1.88 2
Atrium corridor 15 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 16 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 17 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 18 1 7.48 2.1 2.13 2.13 2.5
Corr 19 1 10.1 2.9 2.88 2.88 3
lift lobby 20 1 4.9 1.4 1.40 1.40 1.5
Secretary 21 1 7.9 2.3 2.25 2.25 2.5
Office-02 22 1 8 2.3 2.28 2.28 2.5
Office-02 23 1 8 2.3 2.28 2.28 2.5
Office-02 24 1 8 2.3 2.28 2.28 2.5
Office-02 25 1 8 2.3 2.28 2.28 2.5
Office-02 26 1 8 2.3 2.28 2.28 2.5
Office-02 27 1 8 2.3 2.28 2.28 2.5
Gents Lounge 28 1 6 1.7 1.71 1.71 2
Gents Lounge 29 1 6 1.7 1.71 1.71 2
prayer 30 1 8 2.3 2.28 2.28 3
toilets 31 1 8.7 2.5 2.48 2.48 3
- - -
FOURTH FLOOR - - -
Office-01 1 1 10.01 2.9 2.85 2.85 3
Office-01 2 1 10.01 2.9 2.85 2.85 3
Office-01 3 1 10.01 2.9 2.85 2.85 3
Office-01 4 1 10.01 2.9 2.85 2.85 3
Office-01 5 1 10.01 2.9 2.85 2.85 3
Office-01 6 1 10.01 2.9 2.85 2.85 3
Office-01 7 1 10.01 2.9 2.85 2.85 3
Office-01 8 1 10.01 2.9 2.85 2.85 3
Office-01 9 1 10.01 2.9 2.85 2.85 3
Meeting Room 10 1 2.3 0.7 0.66 0.66 1
Meeting Room 11 1 3.9 1.1 1.11 1.11 1
Stationary 12 1 1.2 0.3 0.34 0.34 0.5
Manager office 13 1 8.4 2.4 2.39 2.39 3
Manager office 14 1 9.35 2.7 2.66 2.66 3
Manager office 14 1 9.35 2.7 2.66 2.66 3
Atrium corridor 15 1 6.9 2.0 1.97 1.97 2.5
Atrium corridor 16 1 6.9 2.0 1.97 1.97 2.5
Atrium corridor 17 1 6.9 2.0 1.97 1.97 2.5
Atrium corridor 18 1 6.9 2.0 1.97 1.97 2
Corr 19 1 10.6 3.0 3.02 3.02 3.5
lift lobby 20 1 5.3 1.5 1.51 1.51 2
Secretary 21 1 5.3 1.5 1.51 1.51 2
Office-02 22 1 8.63 2.5 2.46 2.46 2.5
Office-02 23 1 8.63 2.5 2.46 2.46 2.5
Office-02 24 1 8.63 2.5 2.46 2.46 2.5
Office-02 25 1 8.63 2.5 2.46 2.46 2.5
Office-02 26 1 8.63 2.5 2.46 2.46 2.5
Office-02 27 1 8.63 2.5 2.46 2.46 2.5
Gents Lounge 28 1 6.15 1.8 1.75 1.75 2
Gents Lounge 29 1 6.15 1.8 1.75 1.75 2
prayer 30 1 8.3 2.4 2.37 2.37 3
toilets 31 1 9.2 2.6 2.62 2.62 3
67,500.00
TENDER NO. 613
PROJECT Proposed ELECTRONIC Security Sytems Building
LOCATION Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT BEL YOAHAH
CLIENT Dubai Head Quarters
Sl. No. A HVAC SYSTEM CAPACITY
1 Air Cooled Srew Chillers 203.50 TR
2 CHWPP-constant 30.71 l/s @ 1450 rpm
3 CHWSP-VFD 30.71 l/s @ 1450 rpm
4 FAHU-1 with HRW & HP S-4615 L/S & 3455 L/S
5 FAHU-2 with HRW & HP S-6875 L/S & 5835 L/S
6 FAHU-3 with HRW & HP S-900 L/S & 800 L/S
7 G-01-AHU 3733 L/S
8 G-02-AHU 4147 l/s
9 G-03-AHU 2201 l/s
10 G-04-AHU 1972 l/s
11 G-05-AHU 2728 l/s
12 G-06-AHU 3865 l/s
13 G-14-AHU 1972 l/s
14 G-15-AHU 2993 l/s
15 Chilled water FCU 546 TR
16 DX Units 20 TR
17 Closed Control units
18 CCU-01 10 KW
19 CCU-02 13 KW
20 CSEF-01 1100 l/s
21 CSEF-02 1900 l/s
22 CSEF-03 1550 l/s
23 CSEF-04 & 05 4000 l/s
24 CSEF-06 750l/s
25 CSVF 01 & 02 3250 l/s
26 CSVF 03 500 l/s
27 SVF-01 7000 l/s
28 SVF-02 900 l/s
29 EXF-01 150 l/s
30 EXF-02 100 l/s
31 EXF-04 75 l/s
32 EXF-05 50 l/s
33 EXF-06 50 l/s
34 EXF-07 75 l/s
35 EXF-08 150 l/s
B WATER SUPPLY & DRAINAGE
1 Water Tank 6000 Gallon
2 Solar Panel
3 Solar system circulation pumps (1D+1S)
4 solar Hot water storage tank 2000 ltr
5 BP 01 with pressure vessel 250 ltr 7 l/s @ 2.5 Bar
6 GRP hot pressed insulted tank (8x7x1.5) 70 m3
7 Hot water circulation pump set 2 l/s @1.5 bar
8
PHE- 40 kw chilled water system HE with
recirculation pumps
9 Transfer pump 6.5 l/s @ 500 Kpa
10 Booster pump-roof 7 l/s @ 250 Kpa
11 Booster pump - GR fire pump 1.8 l/s @ 250 Kpa
12 Irrigation booster pump 3 l/s @ 500 Kpa
13 Sump pump 2 l/s @ 200 Kpa
14
Hot water circulation pump (125 deg C rated) 2 l/s @150 Kpa
C DRAINAGE
1 Schedule of Manholes
D FIRE FIGHTING
1 Electric Driven pump 1000 GPM @ 11.5 Bar
2 Diesel Driven pump 1000 GPM @ 11.5 Bar
3 Jockey pumpset 25 GPM @ 11.5 Bar
2
1
1
1
1
2
1
2
1
1
1
1
2
1
2
1
2
1
1
16
1
2
1D+1S
1
1D+1S
1
1D+1S
1D+1S VFD
1D+1S
1D+1S
1D+1S
1D+1S
37
1
1
1
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
1 Sprinklers
Recessed pendant sprinkler head
Upright Sprinkler Head
Upright & Pendant sprinkler Head
Concealed Sprinkler Head
Side Wall Sprinkler Head
2 Fire Fighting Equipments
5 kg - CO2 Fire Extinguisher
6 KG - Dry Powder Fire Extinguisher
3 Valves
OS & Y Gate Valve 200 dia
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
8 SYSTEM
FM 200 - Clean Agent System
Telephone room-GF 9.58
Server room-GF 25.29
Control Room-GF 18.07
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
32 mm
40 mm
50 mm
65 mm
80 mm
100 mm
125mm
150 mm
ond, DUBAI
RTERS
1 Nos incl
1 Nos incl
-
24 Nos 50.00 1,200.00
57 Nos 50.00 2,850.00
2376 Nos 50.00 118,800.00
0 Nos 50.00 -
19 Nos 60.00 1,140.00
-
12 Nos 350.00 4,200.00
12 Nos 350.00 4,200.00
-
4 Nos 4,000.00 16,000.00
STEMS BUILDING
ond, DUBAI
RTERS
-
2 Nos 3,500.00 7,000.00
-
STEMS BUILDING
ond, DUBAI
RTERS
-
0 Lot 30,000.00 -
-
-
-
10 sq mtr 1,300.00 13,000.00
26 sq mtr 1,300.00 33,800.00
20 sq mtr 1,300.00 26,000.00
STEMS BUILDING
ond, DUBAI
RTERS
-
11 sq mtr 1,500.00 16,500.00
10 sq mtr 1,500.00 15,000.00
ond, DUBAI
RTERS
ond, DUBAI
RTERS
-
25 Mtrs 90.00 2,250.00
0 Mtrs 20.00 -
80 Mtrs 90.00 7,200.00
0 Mtrs 90.00 -
0 Mtrs 90.00 -
0 Lot 75,000.00 330,450.00
0 Lot 5,000.00 -
Total Material Dry Cost 1,398,090.22
in AED
OH @1.65 2,306,848.86
FCU GF FF 2F & 3F 4F RF SER BLOCK
FCU-duct 11 31 31 33
DX 5 6
AHU 6
FAHU 3
DUCTING SUMMARY:
DESC sq mtr 10%
SAD 4249 4674
RAD 320 352
FAD 1828 2010
EAD 1520 1672
SMED 196 216
CSMED 552 607
CSMAD 266 292
SPD 121 133
RF (Al Clad) 1330 1463
Non typical
500 250 4.15 6.225
300 250 17.25 18.975
250 200 7.3 6.57
550 300 7.95 13.515
350 250 6.39 7.668 52.953
GF
From AHU RAD
1050 500 3.45 10.695 500 750 9.05
1000 450 17.44 50.576 1100 600 1.91
800 450 7.36 18.4 900 500 1.08
750 400 8.69 19.987 1050 500 2.06
650 350 18.25 36.5 1000 450 1.34
550 250 14.41 23.056 1150 500 4.47
400 200 62.37 74.844 1200 550 4.73
550 250 7.71 12.336 800 450 8.61
1150 500 4.51 14.883 750 400 16.29
650 300 2.97 5.643
550 200 3.2 4.8 GF-RAD
350 250 15.78 18.936
900 500 3.39 9.492
700 400 10.69 23.518
500 250 12.92 19.38
300 250 23.64 26.004
600 300 35.72 64.296
750 500 3.21 8.025
750 400 2.98 6.854
700 350 6.21 13.041
500 250 26.31 39.465
350 200 8.81 9.691
300 200 12.73 12.73
1200 550 8.92 31.22
1000 550 11.56 35.836
650 350 16.29 32.58
450 250 32.8 45.92
300 250 8.67 9.537
250 150 10.08 8.064
650 300 29.04 55.176
700 350 6.54 13.734
550 300 12.97 22.049
300 250 20.28 22.308
1200 550 12.45 43.575
750 400 4.46 10.258
450 250 5.26 7.364
500 250 23.13 34.695
300 200 26.71 26.71
350 250 8.97 10.764
200 150 9.18 6.426
800 450 8.56 21.4
DIA 350 11.77 1.099
DIA 300 2 0.942
DIA 400 2.16 1.256
200 550 2.6 3.9
200 150 4.87 3.409 971.374
Atrium Corridor 4 4
650 300 1.74 3.306
500 250 9.05 13.575
300 250 5.1 5.61 359.856
Managers Office 2 4
550 300 4.68 7.956
450 250 2.01 2.814
300 200 2.7 2.7 107.76
Meeting Room 1 4
FCU-F-01-K
400 200 3.03 3.636 14.544
Office-03 1 4
FCU-F-06-A
600 300 3.7 6.66
500 250 2.26 3.39
300 250 2.92 3.212 53.048
Secretary 1 4
FCU-F-06-B
600 300 5.55 9.99
450 250 2.7 3.78
350 250 3.11 3.732 70.008
Gents Lounge 2 4
500 250 2.21 3.315
400 200 9.8 11.76 120.6
Corridor 1 4
650 350 1.76 3.52
550 300 3.29 5.593
550 250 1.59 2.544
500 250 2.32 3.48
400 250 8.28 10.764
400 200 8.39 10.068 143.876
Gents Prayer 1 4
500 250 5.25 7.875
400 200 8.5 10.2 72.3
Meeting Room 2 4
350 250 3.01 3.612
250 200 3.46 3.114 53.808
Toilets 1 4
650 300 2.06 3.914
550 350 5.08 9.144
500 250 2.54 3.81
350 250 19.21 23.052
250 150 2.76 2.208 168.512
ROOF RF-RAD
1150 500 4.7 15.51 1150 500 16.31
900 500 3.96 11.088 900 500 14.07
750 500 10.76 26.9 750 500 9.65
1200 550 14.96 52.36 1100 600 10.98
1000 450 9.03 26.187 1000 450 11.34
1200 550 11.45 40.075 172.12
RF-RAD
TOTAL
106
11
6
3
22.625
6.494
3.024
6.386
3.886
14.751
16.555
21.525
37.467
132.713
53.823
39.396
24.125
37.332
32.886
187.562
FRESH AIR DUCT EXHAUST AIR DUCT
W in mm H in mm L in mtr A in sq mtr W in mm H in mm L in mtr A in sq mtr
GF GF
650 350 13.59 27.18 650 350 9.24 18.48
550 300 28.41 48.297 500 250 5.46 8.19
350 250 32.54 39.048 250 200 11.59 10.431
450 250 13.5 18.9 250 150 51.51 41.208
300 250 8.26 9.086 250 150 59.91 47.928
250 200 26.57 23.913 500 250 3.7 5.55
250 150 15.7 12.56 300 200 13.81 13.81
650 300 8.34 15.846 300 250 3.08 3.388
300 200 50.72 50.72 550 300 2.02 3.434
200 150 30.52 21.364 450 250 1.9 2.66
500 250 6.85 10.275 350 250 13.9 16.68
550 250 8.23 13.168 300 250 3.38 3.718
550 250 13.15 21.04
GF 290.357 400 250 24.37 31.681
250 150 24.94 19.952
GF 248.15
FF FF
700 350 1.96 4.116 450 250 4.06 5.684
550 300 11.6 19.72 350 250 5.48 6.576
450 250 8.86 12.404 300 200 3.5 3.5
300 200 16 16 250 150 26.49 21.192
350 250 11.99 14.388 500 250 6.13 9.195
250 200 17.88 16.092 200 150 30.4 21.28
250 150 9.82 7.856 550 250 7.48 11.968
200 150 8.2 5.74 450 250 2.97 4.158
1200 500 2.91 9.894 150 150 11.53 6.918
650 350 5.06 10.12 1500 800 13.23 60.858
600 300 7.16 12.888 350 250 1.76 2.112
500 250 6.87 10.305 300 200 9.55 9.55
400 250 7.47 9.711
200 150 14.3 10.01 FF 651.964
300 250 8.23 9.053
300 200 21.83 21.83
1500 800 16.01 73.646
FF 1055.092
RF RF
1200 500 11.07 37.638 1200 500 16.06 54.604
1400 650 20.63 84.583 1050 500 43.88 136.028
1500 700 19.4 85.36 550 300 33.86 57.562
1200 550 2.12 7.42 200 150 2.85 1.995
450 250 40.18 56.252 300 200 4.77 4.77
750 450 9.93 23.832
RF 271.253 600 550 33.44 76.912
1500 650 3.98 17.114
RISER 900 450 3.2 8.64
1000 500 25 75 800 450 1.93 4.825
1200 500 25 85 350 250 4.26 5.112
700 300 15 30
450 250 15 21 RF 391.394
RISER
550 300 25 42.5
800 500 25 65
750 450 25 60
600 400 25 50
EAD 217.5
GRILLS GF FF 2F & 3F 4F RF SER BLOCTOTAL
SAG-Supply air Grill
200 150 1 1
250 100 1 2 1 4
300 150 1 1 2 1 5
300 200 1 2 1 4
400 200 5 5
800 100 18 36 18 72
1100 100 47 13 26 13 99
1500 100 9 9
400 100 1 2 1 4
550 300 1 1
FAG (with bell mouth & wiremesh)
200 150 6 5 10 5 26
250 200 6 6
250 150 3 6 3 12
300 200 10 5 10 5 30
300 250 2 1 2 1 6
350 250 3 3
400 250 2 2
450 250 1 1
500 250 2 2
RAG
400 100 1 2 1 4
450 450 12 12
500 750 1 1
800 100 18 36 18 72
1100 100 39 10 20 10 79
1500 100 3 3
TOTAL 474
RD
225 225 3 6 3 12
300 300 9 11 22 11 53
350 350 3 3
450 450 30 60 30 120
SLD
3 slot 1100 mm 20 20
3 slot 1000 mm 28 28
3 slot 1300 mm 2 4 2 8
3 slot 4300 mm 1 1
3 slot 1200 mm 4 4
RLD
3 slot 1100 mm 4 4
3 slot 1300 mm 2 4 2 8
3 slot 4300 mm 1 2 1 4
TOTAL 494
SMEL
200 1400 1 1
500 500 1 1
750 750 1 1
950 950 1 1
1000 750 1 1
1200 700 1 1
2000 1000 2 2
2100 1000 2 2
VALVES SUMMARY:
FCU/AHU/FAHU: 15 mm 20 mm 25 mm 32 mm 40 mm
Dielectric Union 2 515 631 800 1200 1500
Flexible connection 2
union 2
Test point 2
Drain 1
PICV 1
Strainer 1
Gate Valve 3
CHILLER
Flex connection 2
Drain valve 2
PG 2
T 2
Test point 1
DRV 1
STR 1
2WMV 1
IV 3
PRESSURIZATION UNIT
IV 5
Pressure switch 2
5044 2522
Corridor Smoke Extract Duct Corridor Smoke Make up Duct
GF GF
600 300 8.15 14.67 550 250 16.83 26.928
600 150 14.93 22.395
650 300 10.18 19.342
RF RF
1200 550 23.14 80.99 550 250 3.14 5.024
650 300 10.65 20.235 2000 100 5.64 23.688
RISER RISER
650 350 25 50 750 100 10 17
1150 500 25 82.5 1150 500 40 132
500 200 25 35
550 250 25 40
RF RISER
1150 500 19.43 64.119 750 450 5 12
750 450 8.47 20.328 950 650 5 16
900 500 19.3 54.04 950 900 5 18.5
650 350 3.19 6.38 950 950 5 19
600 350 5 9.5
RISER 600 300 5 9
500 400 25 45 600 200 5 8
600 150 5 7.5
SPD 120.666
SMED 195.943
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
Water Supply Quantity
Total Unit Total Material Price
S.No Description Technical Details Unit Material
Quantity in AED
Price in AED
1 Sanitary Wares - Installation Only -
WC - Water Closet 59 No's 120.00 7,080.00
CWB - Counter Wash Basin 74 No's 120.00 8,880.00
Kitchen Sink 10 No's 120.00 1,200.00
-
2 Water Supply Equipments: -
Transfer Pump set (1D+1S) 6.50 l/s @ 500 Kpa 1 Set 45,000.00 45,000.00
Booster pump set (1D+1S with VFD) 7 l/s @ 250 Kpa 1 Set 55,000.00 55,000.00
Booster pump set (1D+1S) 1.8 l/s @ 250 Kpa 1 Set 25,000.00 25,000.00
Irrigation Booster pump set (1D+1S) by Landscape 3.0 l/s @ 500 Kpa 1 Set -
contractor
Hot water Recirculation Pump set (1D+1S) rated for 125 2.00 l/s @ 150 Kpa 1 Set 8,500.00 8,500.00
deg C liquid temp and timer control
-
Solar Panels 1.33 16 No's 1,400.00 22,400.00
Over Head Tank - GRP Water Tank - Insulated & Partition 8 m x7m x 1.5 m Ht - 1 No's 80,000.00 80,000.00
12 M3
-
Below Ground Water supply pipe HDPE -
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
Water Supply Quantity
Total Unit Total Material Price
S.No Description Technical Details Unit Material
Quantity in AED
Price in AED
40 mm 496.59 Mtr 80.00 39,727.20
75 mm 131.82 Mtr 120.00 15,818.40
125 mm 119.33 Mtr 650.00 77,564.50
1 Equipments -
-
2 UPVC - Below Ground Pipes -
Waste Pipe 110 mm 8 Mtrs 12.00 96.00
-
Car Pariking Drain Pipe 110 mm 0 Mtrs 12.00 -
160 mm 0 Mtrs 18.00 -
-
Planter Drain Pipe 110 mm 0 Mtrs 12.00 -
-
Vent Pipes 82 mm 99 Mtrs 10.00 990.00
-
Condensate Drain Pipes 80 mm 0 Mtrs 10.00 -
-
Soil pipe 200 mm 223 Mtrs 15.00 3,345.00
-
Pipe Fittings, supports - 50% 0 Lot 2,500.00 2,500.00
-
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
DRAINAGE Quantity
-
Rain Water Pipe 110 mm 121.92 Mtrs 30.00 3,657.60
160 mm 4.33 Mtrs 45.00 194.85
200 mm 0 Mtrs 55.00 -
-
Pipe Fittings, supports - 50% 0 Lot 35,000.00
-
3 UPVC - Vertical Riser Pipes -
Waste Pipe 110 mm 0 Mtrs 10.00 -
160 mm 0 Mtrs 16.00 -
200 mm 108 Mtrs 20.00 2,160.00
-
Soil Pipe 110 mm 0 -
160 mm 0 Mtrs 16.00 -
200 mm 96 Mtrs 20.00 1,920.00
-
Car Parking Drain Pipe 110 mm 0 Mtrs 10.00 -
-
Vent Pipes 82 mm 12 Mtrs 8.00 96.00
110 mm 0 Mtrs 10.00 -
160 mm 0 Mtrs 16.00 -
-
Condensate Drain Pipes 50 mm 120 Mtrs 6.00 720.00
80 mm 0 Mtrs 8.00 -
-
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
DRAINAGE Quantity
OH @1.65 475,909.02
Sl. No. Description Cover Size Cover type
MH 11 60x60
11-A 60x60
11-B 60x60
11-C 60x60
11-D 60x60
11-E 60x60
11-F 80x80 Heavy Duty Double
11-G 80x80 seal doubl;e
triangular coated
11-H 80x80 SS 304and inbuilt
11-J 80x80 gully
MH 3
13-A 60x60
MH 11G 80x80
11G1 60x60
11G2 60x60 SS 304
MH 3 80x80
3A 60x60
3B 60x60
2 60x60
2A 60x60
12 60x60 Heavy Duty double
seal double
12A 60x60 triangular epoxy
12B 60x60 coated
12C 60x60
FCU PIPE SIZE 3/4"
unit Price
S.NO DESCRIPTION QTY Total Price in AED
in AED
1 IV 3 28.00 84.00
2 DRV 0 65.00 -
5 DC 1 20.00 20.00
7 TP 3 15.00 45.00
221.00
unit Price
S.NO DESCRIPTION QTY Total Price in AED
in AED
1 IV 3 39.00 117.00
2 DRV 0 90.00 -
7 TP 3 15.00 45.00
264.00
unit Price
S.NO DESCRIPTION QTY Total Price in AED
in AED
1 IV 3 313.00 939.00
4 FC 2 280.00 560.00
5 DV 1 30.00 30.00
7 TP 4 25.00 100.00
2,613.00
unit Price
S.NO DESCRIPTION QTY Total Price in AED
in AED
1 BV 2 425.00 850.00
5 DV 2 30.00 60.00
7 TP 2 25.00 50.00
8 PG 2 50.00 100.00
unit Price
S.NO DESCRIPTION QTY Total Price in AED
in AED
2 BV 2 425.00 850.00
5 DC 2 30.00 60.00
7 PG 2 50.00 100.00
8 TG 2 80.00 160.00
10 TP 2 25.00 50.00
unit Price
S.NO DESCRIPTION QTY Total Price in AED
in AED
1 IV 3 40.00 120.00
449.00