Documente Academic
Documente Profesional
Documente Cultură
Session 1 Session 1
Incorporating Safety Instrumented System (SIS) to ensure high Gaining insights into effective Safety Instrumented Systems
level of safety awareness at all times to the increase (SIS) through the understanding on Alarms, PLC, SCADA,
productivity Interlock and Safety Interlocks
Assessing past industrial accidents to understand why Formulating the best tool for the organization to ensure
accidents usually occur high safety levels at all times
Case studies of multiple levels of past industrial accidents Advancing in safety requirements to gain a competitive
and discussion on preventive measures that could have been edge in the industry
taken Conquering all safety industrial standards and sustaining
Understanding the effects of SIS negligence in affecting a positive and safe working environment
costs, productions and overall profits
Session 2
Session 2 Utilizing the Emergency Shut Down system (ESD)
Improvising on current Process Hazards and Risk Analysis Understanding the purpose of ESD and knowing the right
(PHA) through proven strategies time to call for action
Understanding the purpose of PHA and best industrial Identifying signs and defects in the protection layer in
practices order to know when to engage ESD
Acquiring knowledge and strategies in implementing PHA
strategies to mitigate risks of the invaluable workforce Session 3
Optimising the usage of Safety Valves: The Final Resort to
Session 3 safeguard plants
Mastering Failure Mode and Effect Analysis (FMEA) to Assessing the last line of defence and identifying ways to
construct a bulletproof system that ensures long term minimize damages and loss
uninterrupted production Communicating with peers and team mates on issues
Benchmarking against top international case studies on pertinent to Safety Valves during engagement period
FMEA and solutions to day-to-day safety challenges within Gaining a comprehensive understanding on types and
the industry function o Safety Valves
Session 4 Session 4
Elevating Hazard and Operability (HAZOP) studies to the next Assessing Safety Integrity Level (SIL) and equipping the
level and Emphasizing on Occupational Safety and Health Act knowledge of:
(OSHA) to safeguard employees’ well-being at all times IEC-61508 0 functional Safety Standard for
Discussing all standard practices in HAZOP by various plants Electrical/Electronic/ Programmable Electronic Safety
and updates on OSHA practices System
Highlighting the challenges that industry practitioners are IEC-61511 – Functional Safety Standard for Process
currently facing with HAZOP Industry, Oil and Gas Sector
Finding the right equation to mitigate risks through thorough This session includes the discovery of new functions and
understanding on HAZOP and OSHA detailed descriptions of revolutionized safety strategies
Session 5 Session 5
Discovering new strategies in Layers of Protection Analysis Capitalizing on Risk Management and Insurance Planning
(LOPA) in efforts to elevate protection standards throughout Understanding the need for professional Risk Management
the plant and seeking aid in case of an emergency situation
Session 6 Session 6
Redefining Hazardous Area Classification and protection Drills on Disaster Management and Planning
systems The importance of equipping all individuals within the plant
Focusing on most neglected areas which cases common about evacuation processes and safety procedures in case of
accidents and mistakes an emergency is inevitable. It is encouraged that all plants and
Building an explosion proof plant factories perform periodical training and drills to ensure
Injecting a strong mindset of Intrinsic Safety to all employees safety awareness is at its peak at all times.
Expanding efforts of Protective Enclosures
Session 7
Securing all assets through Fire Risk assessment and Fire
Protection Systems END OF TRAINING
END OF DAY 1
SALES CONTRACT
PLEASE COMPLETE THIS FORM AND FAX TO US
AT: 03-2141 3727 (ATTN:ASYRAF)
OR E-MAIL TO asyraf.ahmad@comfori.com
PARTICIPANTS INFORMATION
NAME:
WORKSHOP VENUE
POSITION:
ISTANA HOTEL,KUALA LUMPUR
EMAIL:
73 Jalan Raja Chulan, 50200 Kuala Lumpur, Malaysia.
H/P NUMBER:
Tel: 603-2141 9988 / Fax: 603-2144 0111
OFFICE (DIRECT LINE):
VEGETARIAN: ( )YES ( )NO LOCATION MAP:
http://www.hotelistana.com.my/new/about/index.php?pages=location
NAME:
POSITION: For reservations, please make your bookings directly with the
EMAIL: hotel. To enjoy special room rates, please quote Comfori’s
H/P NUMBER: Workshop on :
OFFICE (DIRECT LINE): SAFETY INSTRUMENTED SYSTEM (SIS) FOR PROCESS CONTROL
VEGETARIAN: ( )YES ( )NO Hotel bills are to be settled by delegates directly with the
hotel. Hotel reservations and travel arrangements are the
NAME: responsibilities of the registrant. Please note that rooms are
POSITION: available at a first come first serve basis.
EMAIL:
H/P NUMBER:
OFFICE (DIRECT LINE): WORKSHOP FEE
VEGETARIAN: ( )YES ( )NO
1-2 PAX USD 1695
NAME:
POSITION: ≥ 3 PAX USD 1495
EMAIL: Normal Price
H/P NUMBER: Kindly contact us
OFFICE (DIRECT LINE): ≥ 5 PAX
for further details
VEGETARIAN: ( )YES ( )NO
COMPANY’S INFORMATION
ORGANIZATION
___________________________________________________ MODE OF PAYMENT
APPROVING MANAGER
___________________________________________________ Cheque or bank draft in favour of:
ADDRESS COMFORI SDN BHD (581115-T)
___________________________________________________ E-02-03, East Wing, Subang Square Business Centre
___________________________________________________ Jalan SS15/4G, 47500,Subang Jaya, Selangor,Malaysia
___________________________________________________ Tel: +(603) 5621 3630 Fax: +(603) 5638 8248
___________________________________________________ Website: www.comfori.com
TEL NUMBER
___________________________________________________ Payment Via:
FAX NUMBER Cheque by post/courier Tele Transfer
Deposit Our Account (A/C No. : MBB 5123-5260-0832)
___________________________________________________
HR CONTACT
___________________________________________________
SIGNATURE/COMPANY STAMP SBL CLAIMABLE
Please note that payments must be received within 7 days
upon issuance of invoice