HANDOVER NOTES

Site / Place of Handover : Handil


Department / Service : CST/OPB/HDL
From :I Gede Andi Dipayadnya
Date / Time :03 December 2009
To :Rinaldi
CC : Mr. Sentot H./ Mr. Galingging

I. HSE Matters

NIL

II. Work In progress and Today Activities


Item. 80625/C
Modification of API Switch Gear Roof For Lifting Transformer
Status:
Scaffolding already installed and existing roof already modified to riveting
system to allow for transformer replacement. Lifting of new transformer will
be carried out today, which assisted by CB. Straits Kalimantan.
Remaining:
- re-install roof
- Touch up painting at riveting point (bolts joint)
- remove scaffolding

III. Main Events on the Period.

Item. 90254/C
Replace Heavy Corroded 3 Air Instrument at V-750
Status:
- Install scaffolding
- Re-fabricate spool, beveling (ends preparation)
Remaining:
- Double Joint
- Tie Ins, apply TOP. 04-BP-09
- NDT test (penetrant at every joints, no radiography test due to so many
constraints)
- Touch up painting and remove scaffolding
Item. 90500/C
Install Blind Flange and Additional Pipe Support
Status: Completed

Item. 90163/C
Install Scaffolding to Assist Inspection Team at HEOR Area
Status: Completed

Item. 90480/C
Install Scaffolding to Assist Inspection Team at V-795 Power Platform
Status: Completed

Item. 90483/C
Install Scaffolding to Assist Inspection Team at V-570
Status: Completed

Item. 90273/C
Replace Corroded Pipe Support and 2 Water Utility Line
Status: Completed

Item. 80342/C
Install New 4 Spool and 2 pcs 3 #300 Ball Valve at V-230
Status: Completed

Item. 90432/C
Install New 2 Spool and 3 pcs 2 #150 Ball Valve at MK-740
Status: Completed

Item. XXXXX/C
Repair Leaking Points at 2 Air Instrument Under North Bridge Process
Platform (EMERGENCY case)
Status: Completed
IV. High Priority Job to be done in forthcoming days
Item. 90456/C
Replacement Heavy Corroded By Pass Line at POV. 8313
Item. 90474/C
Replacement 4 Fuel Gas Line U/S of PCV-232

All materials already loaded on board of LCT. Coast way 3102.

V. Pending Job and to be solved

NIL

VI. Miscellaneous Items

- Contractors team under PT. KRS, Foreman: Margono


- MOP Teluk Bontang will be valid until 3 Dec 2009,

VII. Signature of Leaving Personnel Signature of Incoming Personnel

( I Gede Andi Dipayadnya ) ( Rinaldi )