Bar Bending Schedule

Project Name ABC building Engineer CivilDigital

Ref Dwg. No. XX-XX-XX Approver Project Manager

Spacing
Bar no. Bar Shape a (m) b (m) c (m) Dia (mm) (mm)

1 b a 0.200 4.380 0.000 20 150

2 0.000 4.380 0.000 10 150


b

3 c 0.140 0.000 0.285 8 180


a
Total Length (m)
Unit weight in kg/m
Weight in kg's
Total reinfocement Weight in kg's

Bar Bending Schedule Template from CivilDigital


Bar Bending Schedule
CivilDigital Revision A Doc.No: XXXX

Project Manager Status Tender Date: 16-Sep-16

Length of Bar (m)


Cutting no's
Length (m) 8 10 12 16 20 25 28 32

4.70 2
9.4

4.38 2
8.8

1.04 24

25.0
ngth (m) 25.0 8.8 0 0 9.4 0 0 0
ght in kg/m 0.395 0.617 0.888 1.578 2.466 3.853 4.834 6.313
n kg's 9.88 5.43 0.00 0.00 23.18 0.00 0.00 0.00
nfocement Weight in kg's 38.5