Documente Academic
Documente Profesional
Documente Cultură
Client:
S.P.SINGLA CONSTRUCTIONS PVT.LTD.
Project:
Design of Ganga Bridge Between Arrah Project No.:
Revision Details:
INTRODUCTION
This design note pertains to the design of simply supported PSC Box Superstructure of span
57.8 m c/c of bearing for Bridge across River Ganga. The bridge is four lane with footpath on
both side. The carriageway width is 15.0m and the overall width is 20.5m
The box section is single cell with a depth of 3.4m, a deck width of 20.5m and a soffit width of
6.9m. The deck slab is kept with 2.5% camber on both sides from the median edge. The
center to centre of bearings under the box girder in transverse direction of box is 5300mm
centre to centre. Typical cross-section of box superstructure is shown in Fig. 1.
1
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
The analysis of the box girder has been carried out on the following basis:
The bending moment and shear forces in the longitudinal direction due to DL, SIDL
and Live Loads have been worked out based on Simple Beam Theory considering
centre to centre distance between bearings as span length.
In transverse direction the box girder has been analysed as RCC section. Box has
been analysed for transverse bending using plane frame analysis of the box frame by
considering a unit width of the box with load intensities due to live load calculated by
using effective width method.
To account for moment due to distorsion and warping, the live load bending moments
and shear forces in the longitudinal directions have been increased by 5% .
The resultant fibre stresses under service condition have been checked as per
IRC112.
Differential temperature variation across the depth has been taken as per fig 10 of
IRC:6-2000 for a temperature variation of 25 degrees. The value of E is taken 100%
for temperature effect. The differential temperature variation across the depth cause
secondary moment in the transverse frame and eigen stresses in the longitudinal
direction. This case has been combined with 50% Liveload with the permissible
stresses increased by 15%. In both transverse and longitudinal direction untensioned
steel is provided as per requirement.
Ultimate resistance of the box girder in flexure has been checked as per provision of
IRC112:2011.
Shear and torsion checks have been made as per IRC 112:2011. Section cracked or
uncracked in flexure has been decided on the basis of whether the maximum
ultimate capacity in shear is governed by cracked or uncracked capacity. Where
uncracked capacity governs, the relief due to prestress force has been added to the
shear capacity of the section obtained based on IRC:112-2011.
2
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
DESIGN DATA
3
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Single cell box girder with a constant depth of 3.4m has been proposed. The deck width is
20.5m with a cantilever of 3.9m.There is a footpath of 1.5m on both side of the box.Concrete
strut of size 0.40.4 m has been proposed at 3.0m interval. The soffit width is 6.9m so that the
web inclination is 45.59 degres with the vertical.
The thickness of the deck slab is kept 230 mm. throughout and soffit thicknes has been kept
400mm upto distance 10.2m from the bearing and variable(400mm to 260mm) from 10.2m to
12.2m and then 260mm throughout.
The web thickness is constant 310mm at midspan and upto a distance of 10.2m on either side
of the support. It then increases uniformly to 460mm at 12.2m from support on both the sides.
Haunches have been provided both in the soffit and the deck. The top haunch of 900mm X
193mm has been provided at mid span based on the requirements of transverse bending. The
bottom haunch of size 900mm x 150 mm is provided at mid span .
4
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Section at midspan Section at Web thickness 460mm Section at Web thickness 610mm Section at diaphragm Location
Node No X (m) Y(m) Node No X (m) Y(m) Node No X (m) Y(m) Node No X (m) Y(m)
1 0 0 1 0 0 1 0 0 1 0 0
2 -3.45 0 2 -3.45 0 2 -3.45 0 2 -3.45 0
3 -6.35 2.8413 3 -6.35 2.8413 3 -6.35 2.8413 3 -6.2952 2.7876
4 -8.5 2.9876 4 -8.5 2.9876 4 -8.5 2.9876 4 -10.25 2.7876
5 -10.25 2.9876 5 -10.25 2.9876 5 -10.25 2.9876 5 -10.2494 3.1876
6 -10.2494 3.1876 6 -10.2494 3.1876 6 -10.2494 3.181 6 0 3.4
7 0 3.4 7 0 3.4 7 0 3.4 7 10.2494 3.1876
8 10.2494 3.1876 8 10.2494 3.1944 8 10.2494 3.1876 8 10.25 2.7876
9 10.2494 2.9876 9 10.2494 2.9876 9 10.25 2.9876 9 6.2952 2.7876
10 8.5 2.9876 10 8.5 2.9876 10 8.5 2.9876 10 3.45 0
11 6.35 2.8413 11 6.35 2.8413 11 6.35 2.8413 11 0 0
12 3.45 0 12 3.45 0 12 3.45 0 12 0 1.26
13 0 0 13 0 0 13 0 0 13 0.45 1.26
14 0 0.26 14 0 0.4 14 0 0.4 14 0.6 1.41
15 2.525 0.26 15 2.525 0.4 15 2.254 0.4 15 0.6 2.01
16 3.425 0.41 16 3.339 0.5357 16 3.067 0.5357 16 0.45 2.16
17 5.81 2.747 17 5.634 2.7846 17 5.369 2.7913 17 -0.45 2.16
18 5.771 2.8834 18 5.595 2.921 18 5.33 2.9277 18 -0.6 2.01
19 5.017 3.0445 19 5.017 3.0445 19 4.753 3.0511 19 -0.6 1.41
20 0.837 3.149 20 0.837 3.149 20 0.837 3.149 20 -0.45 1.26
21 0.4 2.76 21 0.4 2.76 21 0.4 2.76 21 0 1.26
22 -0.4 2.76 22 -0.4 2.76 22 -0.4 2.76
23 -0.837 3.149 23 -0.837 3.149 23 -0.837 3.149
24 -5.017 3.0445 24 -5.017 3.052 24 -4.753 3.0511
25 -5.771 2.8834 25 -5.595 2.921 25 -5.33 2.9277
26 -5.81 2.747 26 -5.6349 2.7846 26 -5.3698 2.7909
27 -3.425 0.41 27 -3.339 0.5357 27 -3.067 0.5357
28 -2.525 0.26 28 -2.525 0.4 28 -2.254 0.4
29 0 0.26 29 0 0.4 29 0 0.4
30 0 0 29 0 0
2 2 2 2
Area 10.371 m Area 12.362 m Area 13.739 m Area 36.507 m
Cg 2.214 m Cg 2.028 m Cg 1.990 m Cg 1.955 m
4 4 4 4
Ixx 16.023 m Ixx 19.716 m Ixx 20.576 m Ixx 34.440 m
5
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Section Moment of
Location Area Cg
No Inertia
Following pages pertain to calculation of various loads on box superstructure due to DL, SIDL, Live Load etc.
and corresponding moments and shear. The longitudinal analysis for moments at various sections has been
done using STAAD.
Dead load on superstructure has been applied using selfweight command of STAAD. The average section
properties have been adopted for member having variable cross-section. Other loads such as weight of
diaphragm have been applied as concentrated loads. These loads are as calculated below.
Section at Midspan
7
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
SIDL is applied as UDL over the box superstructure. The analysis has been carried out using STAAD3.
The maximum live load moment at any section has been calculated by moving Cl A and Cl 70R train over the
structure. The analysis has been done by STAAD3. The STAAD input giving Live load positions for maximum
moments at any section are presented only. The
The live load combination for maximum live load moment is one lane or two lane Cl A or one lane Cl 70R. The
longitudinal moments are increased by impact factor as per IRC:6. The longitudinal moments are also
increased by 10% to cater for distortional and warping effects.
The maximum live load moments and shear at various sections are summarised on next sheets in
tabular form.
The maximum moment due to footpath liveload comes when the entire span is loaded. However for maximum
shear at any section only the appropriate portion which produces the maximum shear is loaded.
8
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
MOMENT
Section No Location SIDL
STG1
m tm tm
1 1.100 881.2 198.0
2 2.900 2234.0 505.5
3 5.900 4248.9 972.2
4 7.800 5376.3 1238.3
5 9.700 6392.1 1481.4
6 12.700 7780.0 1818.5
7 15.700 8923.4 2098.6
8 18.700 9833.5 2321.5
9 21.700 10510.2 2487.2
10 24.700 10953.6 2595.8
11 27.700 11163.6 2647.2
12 28.900 11182.2 2651.8
9
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
(m) t t
1 1.100 782.4 176.5
2 2.900 720.6 165.1
3 5.900 622.7 146.1
4 7.800 564.0 134.0
5 9.700 505.3 121.9
6 12.700 420.0 102.9
7 15.700 342.2 83.8
8 18.700 264.5 64.8
9 21.700 186.7 45.7
10 24.700 108.9 26.7
11 27.700 31.1 7.6
12 28.900 0.0 0.0
10
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
11
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
One lane Class A with Four lane Class A with impact Two lane Class 70R with
Section
Location Impact and enhancement and enhancement for impact and enhancement for
No Total Corr.
for distorsion and warping distorsion and warping distorsion and warping
moment Shear
tm t tm t tm t tm t
12
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
One lane Class A with Impact Four lane Class A with impact Two lane Class 70R with
Section
Location and enhancement for and enhancement for distorsion impact and enhancement for
No Total Corr.
distorsion and warping and warping distorsion and warping
Shear Moment
t tm t tm t tm t tm
13
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
First Second
Section First train Second train Total Corr.
Location train Corr. Shear train Corr. Shear
No Moment location Moment Shear
location Moment
m m tm t m tm t tm t
14
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
m m t tm m t tm t tm
15
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
First Second
Section First train Second train Total Corr.
Location train Corr. Shear train Corr. Shear
No Moment location Moment Shear
location Moment
m m tm t m tm t tm t
1 1.100 12.1 48.5 32.7 41.2 13.8 12.6 62.3 45.3
2 2.900 133.6 121.6 31.3 162.7 32.0 11.0 153.6 42.4
3 5.900 255.7 246.1 28.4 284.8 48.0 8.1 294.1 36.5
4 7.800 377.2 314.9 26.8 406.3 52.9 6.8 367.8 33.6
5 9.700 498.4 380.9 24.9 527.5 51.8 5.3 432.7 30.2
6 12.700 619.9 464.9 11.6 649.0 50.9 4.0 515.8 15.6
7 15.700 742.3 536.4 8.9 771.4 37.8 2.4 574.2 11.3
8 18.700 864.4 596.0 5.8 893.5 15.8 0.8 611.8 6.7
9 21.700 986.8 634.3 3.2 1015.9 5.0 0.2 639.2 3.4
10 24.700 1108.9 658.2 0.1 - 0.0 0.0 658.2 0.1
11 27.700 1202.2 7.1 -0.2 1231.3 663.1 -2.6 670.1 -2.8
12 28.900 1323.7 14.3 -0.5 1352.8 658.5 7.3 672.7 6.8
16
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
m m t tm m t tm t tm
1 1.100 12.4 43.8 48.1 41.5 12.2 13.4 55.9 61.5
2 2.900 133.6 42.4 122.6 162.7 10.6 30.9 53.0 153.5
3 5.900 256.0 39.4 246.0 285.1 7.8 46.0 47.2 292.0
4 7.800 377.5 37.8 317.5 406.6 6.4 50.3 44.3 367.8
5 9.700 498.7 35.9 381.6 527.8 5.0 49.0 41.0 430.6
6 12.700 621.1 32.9 467.7 650.2 3.0 38.6 35.9 506.3
7 15.700 743.2 30.2 539.2 772.3 1.6 25.5 31.8 564.8
8 18.700 868.9 28.7 536.1 - 0.0 0.2 28.7 536.2
9 21.700 960.4 0.0 0.0 991.0 25.6 555.5 25.6 555.5
10 24.700 1080.4 0.0 0.0 1113.4 22.9 566.0 22.9 566.0
11 27.700 1200.4 0.0 0.0 1235.5 19.8 549.8 19.8 549.8
12 28.900 1320.4 0.0 0.0 1357.3 18.7 540.4 18.7 540.4
17
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
First Second
Section First train Second train Total Corr.
Location train Corr. Shear train Corr. Shear
No Moment location Moment Shear
location Moment
m m tm t m tm t tm t
1 1.100 -6.5 97.6 88.7 25.9 15.4 14.0 113.0 102.7
2 2.900 105.7 249.2 85.9 138.1 33.2 11.5 282.5 97.4
3 5.900 217.9 468.6 66.2 250.3 52.6 8.9 521.2 75.1
4 7.800 330.7 596.1 46.4 363.1 51.3 6.6 647.4 53.0
5 9.700 442.9 721.0 59.3 475.3 35.4 3.7 756.4 62.9
6 12.700 555.7 881.2 38.1 588.1 21.8 1.7 903.0 39.8
7 15.700 667.3 1001.0 36.7 699.7 19.5 1.2 1020.5 38.0
8 18.700 782.5 1119.7 27.7 - 0.0 0.0 1119.7 27.7
9 21.700 893.5 1201.5 27.0 - 0.0 0.0 1201.5 27.0
10 24.700 1006.6 1256.8 5.2 - 0.0 0.0 1256.8 5.2
11 27.700 1120.0 1280.9 0.3 - 0.0 0.0 1280.9 0.3
12 28.900 1231.6 1282.5 -1.7 - 0.0 0.0 1282.5 -1.7
18
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
m m t tm m t tm t tm
1 1.100 -6.5 88.7 97.6 25.9 14.0 15.4 102.7 113.0
2 2.900 106.0 85.9 249.2 138.7 11.5 33.2 97.4 282.5
3 5.900 219.1 80.4 474.4 251.5 6.6 38.8 87.0 513.2
4 7.800 331.6 76.9 600.2 364.3 3.7 28.5 80.6 628.7
5 9.700 444.1 74.2 719.5 476.5 2.2 21.2 76.4 740.7
6 12.700 557.2 68.6 871.8 589.9 0.4 4.5 69.0 876.3
7 15.700 670.6 63.8 1001.7 - 0.0 0.0 63.8 1001.7
8 18.700 783.7 58.3 1089.5 - 0.0 0.0 58.3 1089.5
9 21.700 897.1 53.4 1159.2 - 0.0 0.0 53.4 1159.2
10 24.700 1010.2 47.9 1182.7 - 0.0 0.0 47.9 1182.7
11 27.700 1123.6 43.0 1192.2 - 0.0 0.0 43.0 1192.2
12 28.900 1203.4 41.0 1183.8 1236.1 0.0 0.0 41.0 1183.8
19
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
First Second
Section First train Second train Total Corr.
Location train Corr. Shear train Corr. Shear
No Moment location Moment Shear
location Moment
m m tm t m tm t tm t
1 1.100 8.5 90.0 82 40.9 17.0 15.4 107 97.3
2 2.900 120.7 229.9 79 153.1 36.7 12.7 266.6 91.9
3 5.900 232.9 448.7 63 265.3 50.6 8.6 499.4 71.8
4 7.800 345.1 572.7 50 377.5 57.9 7.4 630.7 57.3
5 9.700 457.3 691.8 47 489.7 53.3 5.5 745.1 52.6
6 12.700 569.5 849.2 44 601.9 46.6 3.7 895.7 48.0
7 15.700 682.9 997.7 39 715.3 21.4 1.4 1019.1 40.2
8 18.700 796.0 1111.7 18 828.7 9.3 0.5 1121.0 18.1
9 21.700 909.1 1199.5 29 941.5 1.2 0.1 1200.7 29.2
10 24.700 1022.2 1255.2 7 - 0.0 0.0 1255.2 7.3
11 27.700 1135.6 1280.0 2 - 0.0 0.0 1280.0 2.4
12 28.900 1247.2 1282.5 2 - 0.0 0.0 1282.5 1.7
20
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
m m t tm m t tm t tm
1 1.100 8.500 81.8 90.0 41 15.4 17.0 97.3 107
2 2.900 121.000 79.3 229.9 154 12.7 36.7 91.9 266.6
3 5.900 234.100 73.9 453.5 267 7.4 43.8 81.3 497.3
4 7.800 346.600 70.4 582.8 379 4.6 35.7 75.0 618.6
5 9.700 459.100 67.6 702.6 492 2.9 28.4 70.6 730.9
6 12.700 575.200 63.2 802.5 608 0.2 2.1 63.4 804.6
7 15.700 688.600 58.3 916.0 - 0.0 0.0 58.3 916.0
8 18.700 801.700 52.8 987.5 - 0.0 0.0 52.8 987.5
9 21.700 915.100 48.0 1040.8 - 0.0 0.0 48.0 1040.8
10 24.700 1028.200 42.4 1048.0 - 0.0 0.0 42.4 1048.0
11 27.700 1141.600 37.6 1041.1 - 0.0 0.0 37.6 1041.1
12 28.900 1221.400 35.5 1026.2 1254 0.0 0.0 35.5 1026.2
21
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
It is proposed to use 19T15 cables conforming to class 2 of IS:14268 (low relaxation strands) with
galvanised sheathing for prestressing.
The cable arrangement is indicated in the following pages. The coordinate system adopted for the cable
arrangement is given in sheet No. P101010/B102 . When the cable are in the web the bending in the
cable is along and across the inclined plane of the web therefore a local coordinate system is adopted
for this case. The equation connecting these two coordinate system is given below
There are a total of 25.579 cables of which 21.579 are anchored in the webs while the rest 4 are
anchored in the soffit.
The box shall be stressed in single stages after 28 days with minimum compressive stress is 45MPa.
22
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
The loss in prestressing force due to friction is based on the coefficient of friction and the wobble
coefficient as given above. Slip losses have been assumed to be 6mm. The calculation for the friction
and slips losses of each cable has been made using a standard in house software.
The Cable forces after friction and slip losses at any section are added togeter to get the net
Prestressing force and the Cg of the force at any section. These are given in the following pages
In addition the vertical component of the Presterssing force and the force due to cable curvature in plan
has also been calculated.
23
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 1
Type of Cable 19T15
No of Strands 15
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
24
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 2
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
25
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 3
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
26
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 4
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
27
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 5
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
28
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 6
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
29
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 7
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
30
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 8
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
31
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 9
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
32
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 10
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
-0.45 0.723 -0.45 0.305
4.92 0.723 Straight 0.000 2.9 0.305 Straight 0.000
5.90 0.694 Circular 17.000 4.3999 0.268 Circular 30.019
16.20 0.100 Straight -0.058 4.4001 0.267 Straight -0.050
18.70 0.130 Circular 43.442 5.9 0.230 Circular 30.056
28.90 0.130 Straight 0.000 9.775 0.230 Straight 0.000
28.90 0.130 Straight 0.000 11.024 0.193 Circular 20.852
28.90 0.130 Straight 0.000 11.026 0.192 Straight -0.060
28.90 0.130 Straight 0.000 12.275 0.155 Circular 20.889
28.9 0.130 Straight 0.000 18.700 3.361 Straight 0.000
28.9 0.130 Straight 0.000 21.700 3.213 Circular 30.479
28.9 0.130 Straight 0.000 23.200 3.139 Straight -0.049
28.9 0.130 Straight 0.000 28.9 2.991 Straight 0.000
* Y and Z are along global axis from X = 18.7 to X = 28.9
33
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 11
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
-0.45 0.362 -0.45 0.305
4.90 0.362 Straight 0.000 2.9 0.305 Straight 0.000
5.90 0.332 Circular 17.000 4.3999 0.268 Circular 30.019
9.80 0.102 Straight -0.059 4.4001 0.267 Straight -0.050
12.30 0.130 Circular 42.418 5.9 0.230 Circular 30.056
28.90 0.130 Straight 0.000 6.875 0.230 Straight 0.000
28.90 0.130 Straight 0.000 8.124 0.193 Circular 20.852
28.90 0.130 Straight 0.000 8.126 0.192 Straight -0.060
28.90 0.130 Straight 0.000 9.375 0.155 Circular 20.889
28.9 0.130 Straight 0.000 12.300 3.361 Straight 0.000
28.9 0.130 Straight 0.000 15.000 3.153 Circular 17.618
28.9 0.130 Straight 0.000 16.500 3.014 Straight -0.093
28.9 0.130 Straight 0.000 28.9 2.806 Straight 0.000
* Y and Z are along global axis from X = 12.3 to X = 28.9
34
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 12
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
-0.45 0.230 -0.45 1.530
3.69940064 0.230 Straight 0.000 28.9 1.530 Straight 0.000
5.9 0.223 Straight -0.003 28.9 1.530 Straight 0.000
9.6 0.153 Straight -0.019 28.9 1.530 Straight 0.000
12.1 0.130 Circular 133.100 28.9 1.530 Straight 0.000
28.9 0.130 Straight 0.000 28.9 1.530 Straight 0.000
* Y and Z are along global axis from X = -0.45 to X = 28.9
35
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 13
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
-0.45 0.230 -0.45 1.170
3.69940064 0.230 Straight 0.000 28.9 1.170 Straight 0.000
5.9 0.222 Straight -0.004 28.9 1.170 Straight 0.000
9.6 0.153 Straight -0.019 28.9 1.170 Straight 0.000
12.1 0.130 Circular 134.546 28.9 1.170 Straight 0.000
28.9 0.130 Straight 0.000 28.9 1.170 Straight 0.000
* Y and Z are along global axis from X = -0.35 to X = 28.9
36
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 2
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 3.623 0.305 0.000 0.000 386.3 336.9 0.0
2.90 3.623 0.305 0.000 0.000 0.000 3.350 383.7 339.4 -8.0
4.027 3.623 0.284 0.000 -0.038 0.038 1.127 380.4 342.7 12.3
4.40 3.620 0.268 -0.019 -0.050 0.031 0.373 378.1 345.0 12.3
4.40 3.620 0.267 -0.019 -0.050 0.000 0.000 378.1 345.0 12.5
5.70 3.553 0.231 -0.084 -0.007 0.109 1.302 370.2 352.9 8.2
5.90 3.536 0.230 -0.084 0.000 0.007 0.201 369.6 353.5 0.0
9.78 3.211 0.230 -0.084 0.000 0.000 3.889 366.8 356.3 -12.0
11.02 3.106 0.193 -0.084 -0.060 0.060 1.254 362.2 361.0 0.0
11.026 3.106 0.192 -0.084 -0.060 0.000 0.002 362.2 361.0 12.1
12.275 3.001 0.155 -0.084 0.000 0.060 1.254 357.6 357.6 0.0
27.72897 1.704 0.155 -0.084 0.000 0.000 15.508 346.7 346.7 -17.6
28.9 1.655 0.155 0.000 0.000 0.084 1.172 341.0 341.0 0.0
29.432
Emergence Angle 0.000 degrees
Length of Cable 58.865 m
Cut Length 60.865 m
Null point 29.432 m
Pmin 341.0 t
Extension 209 mm
37
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 3
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 3.266 0.305 0.000 0.000 386.3 337.2 0.0
2.90 3.266 0.305 0.000 0.000 0.000 3.350 383.7 339.8 -8.0
4.062 3.266 0.283 0.000 -0.039 0.039 1.162 380.3 343.2 12.3
4.40 3.263 0.268 -0.017 -0.050 0.028 0.338 378.2 345.3 12.3
4.40 3.263 0.267 -0.017 -0.050 0.000 0.000 378.2 345.3 12.5
5.64 3.204 0.231 -0.079 -0.009 0.103 1.237 370.7 352.7 8.2
5.90 3.183 0.230 -0.079 0.000 0.009 0.266 370.0 353.5 0.0
9.78 2.878 0.230 -0.079 0.000 0.000 3.887 367.1 356.4 -12.0
11.02 2.779 0.193 -0.079 -0.060 0.060 1.253 362.5 361.0 0.0
11.026 2.779 0.192 -0.079 -0.060 0.000 0.002 362.5 361.0 12.1
12.275 2.681 0.155 -0.079 0.000 0.060 1.253 357.9 357.9 0.0
27.72088 1.463 0.155 -0.079 0.000 0.000 15.494 347.0 347.0 -16.4
28.9 1.417 0.155 0.000 0.000 0.079 1.180 341.6 341.6 0.0
29.423
Emergence Angle 0.000 degrees
Length of Cable 58.846 m
Cut Length 60.846 m
Null point 29.423 m
Pmin 341.6 t
Extension 209 mm
38
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 4
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 2.909 0.305 0.000 0.000 386.3 337.5 0.0
2.90 2.909 0.305 0.000 0.000 0.000 3.350 383.7 340.1 -8.0
4.137 2.909 0.279 0.000 -0.041 0.041 1.238 380.1 343.7 13.0
4.40 2.908 0.268 -0.014 -0.050 0.023 0.263 378.4 345.4 13.0
4.40 2.908 0.267 -0.014 -0.050 0.000 0.000 378.4 345.4 13.2
5.54 2.858 0.232 -0.074 -0.012 0.098 1.137 371.3 352.5 8.2
5.90 2.831 0.230 -0.074 0.000 0.012 0.366 370.3 353.5 0.0
9.78 2.545 0.230 -0.074 0.000 0.000 3.886 367.4 356.4 -12.0
11.02 2.453 0.193 -0.074 -0.060 0.060 1.253 362.8 361.0 0.0
11.026 2.453 0.192 -0.074 -0.060 0.000 0.002 362.8 361.0 12.1
12.275 2.361 0.155 -0.074 0.000 0.060 1.253 358.2 358.2 0.0
27.79653 1.216 0.155 -0.074 0.000 0.000 15.564 347.2 347.2 -16.5
28.9 1.175 0.155 0.000 0.000 0.074 1.104 342.1 342.1 0.0
29.415
Emergence Angle 0.000 degrees
Length of Cable 58.829 m
Cut Length 60.829 m
Null point 29.415 m
Pmin 342.1 t
Extension 210 mm
39
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 5
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 2.539 0.305 0.000 0.000 386.3 338.0 0.0
2.90 2.539 0.305 0.000 0.000 0.000 3.350 383.7 340.6 -8.0
4.400 2.539 0.268 0.000 -0.050 0.050 1.500 379.3 345.0 0.0
4.40 2.539 0.267 0.000 -0.050 0.000 0.000 379.3 345.0 8.1
4.40 2.539 0.267 0.000 -0.050 0.000 0.002 379.3 345.0 13.9
5.64 2.497 0.231 -0.069 -0.009 0.110 1.235 371.4 352.9 8.2
5.90 2.478 0.230 -0.069 0.000 0.009 0.266 370.6 353.7 0.0
9.78 2.212 0.230 -0.069 0.000 0.000 3.884 367.7 356.5 -12.1
11.02 2.127 0.193 -0.069 -0.060 0.060 1.253 363.1 361.2 0.0
11.026 2.126 0.192 -0.069 -0.060 0.000 0.002 363.1 361.2 12.1
12.275 2.041 0.155 -0.069 0.000 0.060 1.253 358.5 358.5 0.0
27.87226 0.969 0.155 -0.069 0.000 0.000 15.634 347.5 347.5 -16.5
28.9 0.934 0.155 0.000 0.000 0.069 1.028 342.7 342.7 0.0
29.406
Emergence Angle 0.000 degrees
Length of Cable 58.812 m
Cut Length 60.812 m
Null point 29.406 m
Pmin 342.7 t
Extension 210 mm
40
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 6
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 2.171 0.305 0.000 0.000 386.3 338.5 0.0
2.90 2.171 0.305 0.000 0.000 0.000 3.350 383.7 341.1 -8.0
4.400 2.171 0.268 0.000 -0.050 0.050 1.500 379.3 345.5 0.0
4.40 2.171 0.267 0.000 -0.050 0.000 0.000 379.3 345.5 8.1
4.65 2.171 0.256 0.000 -0.042 0.008 0.251 378.6 346.2 14.6
5.74 2.136 0.230 -0.064 -0.005 0.100 1.090 371.4 353.4 8.3
5.90 2.126 0.230 -0.064 0.000 0.005 0.160 370.9 353.8 0.0
9.78 1.880 0.230 -0.064 0.000 0.000 3.883 368.1 356.7 -12.1
11.02 1.800 0.193 -0.064 -0.060 0.060 1.252 363.4 361.3 0.0
11.026 1.800 0.192 -0.064 -0.060 0.000 0.002 363.4 361.3 12.1
12.275 1.721 0.155 -0.064 0.000 0.060 1.252 358.8 358.8 0.0
27.94807 0.724 0.155 -0.064 0.000 0.000 15.705 347.7 347.7 -16.5
28.9 0.694 0.155 0.000 0.000 0.064 0.952 343.3 343.3 0.0
29.398
Emergence Angle 0.000 degrees
Length of Cable 58.796 m
Cut Length 60.796 m
Null point 29.398 m
Pmin 343.3 t
Extension 210 mm
41
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 7
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 1.807 0.305 0.000 0.000 386.3 338.9 0.0
2.90 1.807 0.305 0.000 0.000 0.000 3.350 383.7 341.5 -8.0
4.400 1.807 0.268 0.000 -0.050 0.050 1.500 379.3 345.9 0.0
4.40 1.807 0.267 0.000 -0.050 0.000 0.000 379.3 345.9 8.1
4.83 1.807 0.249 0.000 -0.036 0.014 0.427 378.1 347.1 14.7
5.82 1.778 0.230 -0.059 -0.003 0.092 0.993 371.5 353.7 8.3
5.90 1.773 0.230 -0.059 0.000 0.003 0.080 371.3 353.9 0.0
9.78 1.546 0.230 -0.059 0.000 0.000 3.882 368.4 356.8 -12.1
11.02 1.473 0.193 -0.059 -0.060 0.060 1.252 363.7 361.4 0.0
11.026 1.473 0.192 -0.059 -0.060 0.000 0.002 363.7 361.4 12.1
12.275 1.400 0.155 -0.059 0.000 0.060 1.252 359.1 359.1 0.0
28.02395 0.479 0.155 -0.059 0.000 0.000 15.776 348.0 348.0 -16.5
28.9 0.453 0.155 0.000 0.000 0.059 0.876 343.9 343.9 0.0
29.391
Emergence Angle 0.000 degrees
Length of Cable 58.782 m
Cut Length 60.782 m
Null point 29.391 m
Pmin 343.9 t
Extension 210 mm
42
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 8
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 1.445 0.305 0.000 0.000 386.3 339.3 0.0
2.90 1.445 0.305 0.000 0.000 0.000 3.350 383.7 341.9 -8.0
4.400 1.445 0.268 0.000 -0.050 0.050 1.500 379.3 346.3 0.0
4.40 1.445 0.267 0.000 -0.050 0.000 0.000 379.3 346.3 8.1
4.99 1.445 0.244 0.000 -0.030 0.020 0.594 377.6 348.0 14.8
5.90 1.421 0.230 -0.053 0.000 0.084 0.907 371.6 354.0 0.0
9.78 1.214 0.230 -0.053 0.000 0.000 3.881 368.7 356.9 -12.1
11.02 1.147 0.193 -0.053 -0.060 0.060 1.251 364.0 361.5 0.0
11.03 1.147 0.192 -0.053 -0.060 0.000 0.002 364.0 361.5 12.1
12.275 1.080 0.155 -0.053 0.000 0.060 1.251 359.5 359.5 0.0
28.09991 0.235 0.155 -0.053 0.000 0.000 15.847 348.2 348.2 -16.5
28.9 0.213 0.155 0.000 0.000 0.053 0.800 344.5 344.5 0.0
29.384
Emergence Angle 0.000 degrees
Length of Cable 58.769 m
Cut Length 60.769 m
Null point 29.384 m
Pmin 344.5 t
Extension 210 mm
43
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 9
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 1.086 0.305 0.000 0.000 386.3 339.5 0.0
2.90 1.086 0.305 0.000 0.000 0.000 3.350 383.7 342.1 -8.0
4.400 1.086 0.268 0.000 -0.050 0.050 1.500 379.3 346.5 0.0
4.40 1.086 0.267 0.000 -0.050 0.000 0.000 379.3 346.5 8.1
5.04 1.086 0.242 0.000 -0.029 0.021 0.644 377.4 348.3 14.8
5.90 1.065 0.230 -0.050 0.000 0.079 0.857 371.8 354.0 0.0
9.78 0.869 0.230 -0.050 0.000 0.000 3.880 368.9 356.9 -12.1
11.02 0.806 0.193 -0.050 -0.060 0.060 1.251 364.2 361.5 0.0
11.03 0.806 0.192 -0.050 -0.060 0.000 0.002 364.2 361.5 12.1
12.275 0.743 0.155 -0.050 0.000 0.060 1.251 359.6 359.6 0.0
25.2 0.091 0.155 -0.050 0.000 0.000 12.941 350.4 350.4 -5.0
27.7 0.130 0.155 0.000 0.000 0.050 2.501 345.7 345.7 0.0
28.9 0.130 0.155 0.000 0.000 0.000 1.200 344.9 344.9 0.0
29.378
Emergence Angle 0.000 degrees
Length of Cable 58.756 m
Cut Length 60.756 m
Null point 29.378 m
Pmin 344.9 t
Extension 210 mm
44
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 10
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 0.723 0.305 0.000 0.000 386.3 339.0 0.0
2.90 0.723 0.305 0.000 0.000 0.000 3.350 383.7 341.6 -8.0
4.400 0.723 0.268 0.000 -0.050 0.050 1.500 379.3 346.0 0.0
4.40 0.723 0.267 0.000 -0.050 0.000 0.000 379.3 346.0 8.1
4.92 0.723 0.246 0.000 -0.033 0.017 0.521 377.8 347.5 14.8
5.90 0.694 0.230 -0.058 0.000 0.090 0.980 371.3 354.0 0.0
9.78 0.471 0.230 -0.058 0.000 0.000 3.881 368.4 356.8 -12.1
11.02 0.399 0.193 -0.058 -0.060 0.060 1.252 363.8 361.5 0.0
11.03 0.399 0.192 -0.058 -0.060 0.000 0.002 363.8 361.5 12.1
12.275 0.327 0.155 -0.058 0.000 0.060 1.252 359.2 359.2 0.0
16.2 0.100 0.155 -0.058 0.000 0.000 3.932 356.4 356.4 -4.4
18.7 0.130 3.361 0.000 0.000 0.058 2.501 351.1 351.1 4.8
21.7 0.130 3.213 0.000 -0.049 0.049 3.001 346.1 346.1 0.0
23.2 0.130 3.139 0.000 -0.049 0.000 1.502 345.1 345.1 -11.2
24.7 0.130 2.991 0.000 0.000 0.049 1.500 341.2 341.2 0.0
28.9 0.130 2.991 0.000 0.000 0.000 4.200 338.3 338.3 0.0
29.374
Emergence Angle 0.000 degrees
Length of Cable 58.748 m
Cut Length 60.748 m
Null point 29.374 m
Pmin 338.3 t
Extension 208 mm
45
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 11
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 0.362 0.305 0.000 0.000 386.3 335.6 0.0
2.90 0.362 0.305 0.000 0.000 0.000 3.350 383.7 338.2 -7.9
4.400 0.362 0.268 0.000 -0.050 0.050 1.500 379.3 342.6 0.0
4.40 0.362 0.267 0.000 -0.050 0.000 0.000 379.3 342.6 8.0
4.90 0.362 0.247 0.000 -0.033 0.017 0.498 377.9 344.0 14.6
5.90 0.332 0.230 -0.059 0.000 0.093 1.003 371.2 350.7 0.0
6.88 0.275 0.230 -0.059 0.000 0.000 0.977 370.5 351.4 -11.9
8.12 0.201 0.193 -0.059 -0.060 0.060 1.252 365.8 356.1 0.0
8.13 0.201 0.192 -0.059 -0.060 0.000 0.002 365.8 356.1 12.0
9.375 0.127 0.155 -0.059 0.000 0.060 1.252 361.2 360.7 0.0
9.8 0.102 0.155 -0.059 0.000 0.000 0.426 360.9 360.9 -4.5
12.3 0.130 3.361 0.000 0.000 0.059 2.501 355.5 355.5 9.7
15 0.130 3.153 0.000 -0.093 0.093 2.703 348.1 348.1 0.0
16.5 0.130 3.014 0.000 -0.093 0.000 1.506 347.0 347.0 -21.0
18 0.130 2.806 0.000 0.000 0.093 1.502 340.6 340.6 0.0
28.9 0.130 2.806 0.000 0.000 0.000 10.900 333.2 333.2 0.0
29.371
Emergence Angle 0.000 degrees
Length of Cable 58.743 m
Cut Length 60.743 m
Null point 29.371 m
Pmin 333.2 t
Extension 205 mm
46
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 12
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 0.230 1.530 0.000 0.000 386.3 352.7 0.0
3.70 0.230 1.530 0.000 0.000 0.000 4.149 383.1 355.9 0.0
5.900 0.223 1.530 -0.019 0.000 0.019 2.201 380.2 358.8 0.0
9.60 0.153 1.530 -0.019 0.000 0.000 3.701 377.4 361.6 0.0
12.10 0.130 1.530 0.000 0.000 0.019 2.500 374.3 364.7 0.0
28.90 0.130 1.530 0.000 0.000 0.000 16.800 361.9 361.9 0.0
29.351
Emergence Angle 0.000 degrees
Length of Cable 58.702 m
Cut Length 60.702 m
Null point 29.351 m
Pmin 361.9 t
Extension 216 mm
47
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 13
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 0.230 1.170 0.000 0.000 386.3 353.3 0.0
3.70 0.230 1.170 0.000 0.000 0.000 4.149 383.1 356.5 0.0
5.900 0.222 1.170 -0.015 0.000 0.015 2.201 380.4 359.1 0.0
9.60 0.167 1.170 -0.015 0.000 0.000 3.700 377.6 361.9 0.0
12.10 0.130 1.170 0.000 0.000 0.015 2.500 374.8 364.7 0.0
28.90 0.130 1.170 0.000 0.000 0.000 16.800 362.4 362.4 0.0
29.351
Emergence Angle 0.000 degrees
Length of Cable 58.701 m
Cut Length 60.701 m
Null point 29.351 m
Pmin 362.4 t
Extension 216 mm
48
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Distance Stage1
Section from end No of Ecc from
Hor Force Ver force
No Support Cables bottom
(m) (m) (t) (t)
1 1 1.100 25.579 1.473 8734.703
2 3 2.900 25.579 1.473 8770.099
3 6 5.900 25.579 1.402 9048.165
4 8 7.800 25.579 1.321 9086.335
5 10 9.700 25.579 1.237 9132.404
6 13 12.700 25.579 1.080 9166.835
7 16 15.700 25.579 0.971 9118.512
8 19 18.700 25.579 0.867 9067.581
9 22 21.700 25.579 0.770 8998.741
10 25 24.700 25.579 0.673 8923.936
11 28 27.700 25.579 0.576 8889.472
12 29 28.900 25.579 0.577 8848.505
49
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
There are no stresses developed in structure due to uniform rise/fall in temperature as the structure is
free to expand/contract. However due to temperature gradient along depth of box (rise and fall case),
eigen stresses are developed.
The temperature gradient along depth (rise/fall) have been considered as per fig 10 of IRC:6-2010 as
shown below.
Temperature Gradient
o o
17.80 C 10.6 C
150
250
o o
4 C 0.7 C
250
200
3.4
200
o
0.8 C
150
250
o o
2.1 C 6.6 C
(Temp. Rise) (Temp. Fall)
The eigen stresses have been calculated for each section along with the force and eccentricity based on
full value of E value.
The resultant temperature stresses have been combined later with stresses due to other effects like DL,
SIDL etc in tabular manner. Only 50% live load has been considered for load combination with
temperature gradient. In case there tension in the box in this load combination then untensioned steel has
been provided as per requirement.
50
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
It is proposed to use 19T15 cables conforming to class 2 of IS:14268 (low relaxation strands) with
galvanised sheathing for prestressing.
The cable arrangement is indicated in the following pages. The coordinate system adopted for the cable
arrangement is given in sheet No. P101010/B102 . When the cable are in the web the bending in the
cable is along and across the inclined plane of the web therefore a local coordinate system is adopted
for this case. The equation connecting these two coordinate system is given below
There are a total of 25.579 cables of which 21.579 are anchored in the webs while the rest 4 are
anchored in the soffit.
The box shall be stressed in single stages after 28 days with minimum compressive stress is 45MPa.
51
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
The loss in prestressing force due to friction is based on the coefficient of friction and the wobble
coefficient as given above. Slip losses have been assumed to be 6mm. The calculation for the friction
and slips losses of each cable has been made using a standard in house software.
The Cable forces after friction and slip losses at any section are added togeter to get the net
Prestressing force and the Cg of the force at any section. These are given in the following pages
In addition the vertical component of the Presterssing force and the force due to cable curvature in plan
has also been calculated.
52
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 1
Type of Cable 19T15
No of Strands 15
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
53
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 2
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
54
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 3
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
55
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 4
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
56
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 5
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
57
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 6
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
58
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 7
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
59
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 8
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
60
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 9
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
61
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 10
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
-0.45 0.723 -0.45 0.305
4.92 0.723 Straight 0.000 2.9 0.305 Straight 0.000
5.90 0.694 Circular 17.000 4.3999 0.268 Circular 30.019
16.20 0.100 Straight -0.058 4.4001 0.267 Straight -0.050
18.70 0.130 Circular 43.442 5.9 0.230 Circular 30.056
28.90 0.130 Straight 0.000 9.775 0.230 Straight 0.000
28.90 0.130 Straight 0.000 11.024 0.193 Circular 20.852
28.90 0.130 Straight 0.000 11.026 0.192 Straight -0.060
28.90 0.130 Straight 0.000 12.275 0.155 Circular 20.889
28.9 0.130 Straight 0.000 18.700 3.361 Straight 0.000
28.9 0.130 Straight 0.000 21.700 3.213 Circular 30.479
28.9 0.130 Straight 0.000 23.200 3.139 Straight -0.049
28.9 0.130 Straight 0.000 28.9 2.991 Straight 0.000
* Y and Z are along global axis from X = 18.7 to X = 28.9
62
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 11
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
-0.45 0.362 -0.45 0.305
4.90 0.362 Straight 0.000 2.9 0.305 Straight 0.000
5.90 0.332 Circular 17.000 4.3999 0.268 Circular 30.019
9.80 0.102 Straight -0.059 4.4001 0.267 Straight -0.050
12.30 0.130 Circular 42.418 5.9 0.230 Circular 30.056
28.90 0.130 Straight 0.000 6.875 0.230 Straight 0.000
28.90 0.130 Straight 0.000 8.124 0.193 Circular 20.852
28.90 0.130 Straight 0.000 8.126 0.192 Straight -0.060
28.90 0.130 Straight 0.000 9.375 0.155 Circular 20.889
28.9 0.130 Straight 0.000 12.300 3.361 Straight 0.000
28.9 0.130 Straight 0.000 15.000 3.153 Circular 17.618
28.9 0.130 Straight 0.000 16.500 3.014 Straight -0.093
28.9 0.130 Straight 0.000 28.9 2.806 Straight 0.000
* Y and Z are along global axis from X = 12.3 to X = 28.9
63
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 12
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
-0.45 0.230 -0.45 1.530
3.69940064 0.230 Straight 0.000 28.9 1.530 Straight 0.000
5.9 0.223 Straight -0.003 28.9 1.530 Straight 0.000
9.6 0.153 Straight -0.019 28.9 1.530 Straight 0.000
12.1 0.130 Circular 133.100 28.9 1.530 Straight 0.000
28.9 0.130 Straight 0.000 28.9 1.530 Straight 0.000
* Y and Z are along global axis from X = -0.45 to X = 28.9
64
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
CABLE PROFILE
Cable No 13
Type of Cable 19T15
No of Strands 19
STAGE 1
Symmetrical Cable only half cable taken
Distances X are from cl of bearing
X (m) Y Elevation (m) Curve type Angle/Radius X (m) Z Plan (m) Curve type Angle/Radius
-0.45 0.230 -0.45 1.170
3.69940064 0.230 Straight 0.000 28.9 1.170 Straight 0.000
5.9 0.222 Straight -0.004 28.9 1.170 Straight 0.000
9.6 0.153 Straight -0.019 28.9 1.170 Straight 0.000
12.1 0.130 Circular 134.546 28.9 1.170 Straight 0.000
28.9 0.130 Straight 0.000 28.9 1.170 Straight 0.000
* Y and Z are along global axis from X = -0.35 to X = 28.9
65
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 1
Type of Cable 19T15
No of Strands 15
Jacking Force 304.9 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 3.980 0.305 0.000 0.000 304.9 265.7 0.0
2.90 3.980 0.305 0.000 0.000 0.000 3.350 302.9 267.7 -6.3
3.986 3.980 0.285 0.000 -0.036 0.036 1.086 300.4 270.2 9.7
4.40 3.976 0.268 -0.021 -0.050 0.035 0.414 298.4 272.2 9.7
4.40 3.976 0.267 -0.021 -0.050 0.000 0.000 298.4 272.2 9.9
5.76 3.901 0.230 -0.089 -0.005 0.114 1.362 291.9 278.7 6.5
5.90 3.889 0.230 -0.089 0.000 0.005 0.141 291.6 279.0 0.0
9.78 3.544 0.230 -0.089 0.000 0.000 3.890 289.3 281.3 -9.5
11.02 3.432 0.193 -0.089 -0.060 0.060 1.254 285.7 285.0 0.0
11.026 3.432 0.192 -0.089 -0.060 0.000 0.002 285.7 285.0 9.5
12.275 3.321 0.155 -0.089 0.000 0.060 1.254 282.1 282.1 0.0
27.74722 1.944 0.155 -0.089 0.000 0.000 15.533 273.4 273.4 -14.9
28.9 1.893 0.155 0.000 0.000 0.089 1.154 268.7 268.7 0.0
29.442
Emergence Angle 0.000 degrees
Length of Cable 58.885 m
Cut Length 60.885 m
Null point 29.442 m
Pmin 268.7 t
Extension 209 mm
66
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 2
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 3.623 0.305 0.000 0.000 386.3 336.9 0.0
2.90 3.623 0.305 0.000 0.000 0.000 3.350 383.7 339.4 -8.0
4.027 3.623 0.284 0.000 -0.038 0.038 1.127 380.4 342.7 12.3
4.40 3.620 0.268 -0.019 -0.050 0.031 0.373 378.1 345.0 12.3
4.40 3.620 0.267 -0.019 -0.050 0.000 0.000 378.1 345.0 12.5
5.70 3.553 0.231 -0.084 -0.007 0.109 1.302 370.2 352.9 8.2
5.90 3.536 0.230 -0.084 0.000 0.007 0.201 369.6 353.5 0.0
9.78 3.211 0.230 -0.084 0.000 0.000 3.889 366.8 356.3 -12.0
11.02 3.106 0.193 -0.084 -0.060 0.060 1.254 362.2 361.0 0.0
11.026 3.106 0.192 -0.084 -0.060 0.000 0.002 362.2 361.0 12.1
12.275 3.001 0.155 -0.084 0.000 0.060 1.254 357.6 357.6 0.0
27.72897 1.704 0.155 -0.084 0.000 0.000 15.508 346.7 346.7 -17.6
28.9 1.655 0.155 0.000 0.000 0.084 1.172 341.0 341.0 0.0
29.432
Emergence Angle 0.000 degrees
Length of Cable 58.865 m
Cut Length 60.865 m
Null point 29.432 m
Pmin 341.0 t
Extension 209 mm
67
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 3
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 3.266 0.305 0.000 0.000 386.3 337.2 0.0
2.90 3.266 0.305 0.000 0.000 0.000 3.350 383.7 339.8 -8.0
4.062 3.266 0.283 0.000 -0.039 0.039 1.162 380.3 343.2 12.3
4.40 3.263 0.268 -0.017 -0.050 0.028 0.338 378.2 345.3 12.3
4.40 3.263 0.267 -0.017 -0.050 0.000 0.000 378.2 345.3 12.5
5.64 3.204 0.231 -0.079 -0.009 0.103 1.237 370.7 352.7 8.2
5.90 3.183 0.230 -0.079 0.000 0.009 0.266 370.0 353.5 0.0
9.78 2.878 0.230 -0.079 0.000 0.000 3.887 367.1 356.4 -12.0
11.02 2.779 0.193 -0.079 -0.060 0.060 1.253 362.5 361.0 0.0
11.026 2.779 0.192 -0.079 -0.060 0.000 0.002 362.5 361.0 12.1
12.275 2.681 0.155 -0.079 0.000 0.060 1.253 357.9 357.9 0.0
27.72088 1.463 0.155 -0.079 0.000 0.000 15.494 347.0 347.0 -16.4
28.9 1.417 0.155 0.000 0.000 0.079 1.180 341.6 341.6 0.0
29.423
Emergence Angle 0.000 degrees
Length of Cable 58.846 m
Cut Length 60.846 m
Null point 29.423 m
Pmin 341.6 t
Extension 209 mm
68
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 4
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 2.909 0.305 0.000 0.000 386.3 337.5 0.0
2.90 2.909 0.305 0.000 0.000 0.000 3.350 383.7 340.1 -8.0
4.137 2.909 0.279 0.000 -0.041 0.041 1.238 380.1 343.7 13.0
4.40 2.908 0.268 -0.014 -0.050 0.023 0.263 378.4 345.4 13.0
4.40 2.908 0.267 -0.014 -0.050 0.000 0.000 378.4 345.4 13.2
5.54 2.858 0.232 -0.074 -0.012 0.098 1.137 371.3 352.5 8.2
5.90 2.831 0.230 -0.074 0.000 0.012 0.366 370.3 353.5 0.0
9.78 2.545 0.230 -0.074 0.000 0.000 3.886 367.4 356.4 -12.0
11.02 2.453 0.193 -0.074 -0.060 0.060 1.253 362.8 361.0 0.0
11.026 2.453 0.192 -0.074 -0.060 0.000 0.002 362.8 361.0 12.1
12.275 2.361 0.155 -0.074 0.000 0.060 1.253 358.2 358.2 0.0
27.79653 1.216 0.155 -0.074 0.000 0.000 15.564 347.2 347.2 -16.5
28.9 1.175 0.155 0.000 0.000 0.074 1.104 342.1 342.1 0.0
29.415
Emergence Angle 0.000 degrees
Length of Cable 58.829 m
Cut Length 60.829 m
Null point 29.415 m
Pmin 342.1 t
Extension 210 mm
69
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 5
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 2.539 0.305 0.000 0.000 386.3 338.0 0.0
2.90 2.539 0.305 0.000 0.000 0.000 3.350 383.7 340.6 -8.0
4.400 2.539 0.268 0.000 -0.050 0.050 1.500 379.3 345.0 0.0
4.40 2.539 0.267 0.000 -0.050 0.000 0.000 379.3 345.0 8.1
4.40 2.539 0.267 0.000 -0.050 0.000 0.002 379.3 345.0 13.9
5.64 2.497 0.231 -0.069 -0.009 0.110 1.235 371.4 352.9 8.2
5.90 2.478 0.230 -0.069 0.000 0.009 0.266 370.6 353.7 0.0
9.78 2.212 0.230 -0.069 0.000 0.000 3.884 367.7 356.5 -12.1
11.02 2.127 0.193 -0.069 -0.060 0.060 1.253 363.1 361.2 0.0
11.026 2.126 0.192 -0.069 -0.060 0.000 0.002 363.1 361.2 12.1
12.275 2.041 0.155 -0.069 0.000 0.060 1.253 358.5 358.5 0.0
27.87226 0.969 0.155 -0.069 0.000 0.000 15.634 347.5 347.5 -16.5
28.9 0.934 0.155 0.000 0.000 0.069 1.028 342.7 342.7 0.0
29.406
Emergence Angle 0.000 degrees
Length of Cable 58.812 m
Cut Length 60.812 m
Null point 29.406 m
Pmin 342.7 t
Extension 210 mm
70
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 6
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 2.171 0.305 0.000 0.000 386.3 338.5 0.0
2.90 2.171 0.305 0.000 0.000 0.000 3.350 383.7 341.1 -8.0
4.400 2.171 0.268 0.000 -0.050 0.050 1.500 379.3 345.5 0.0
4.40 2.171 0.267 0.000 -0.050 0.000 0.000 379.3 345.5 8.1
4.65 2.171 0.256 0.000 -0.042 0.008 0.251 378.6 346.2 14.6
5.74 2.136 0.230 -0.064 -0.005 0.100 1.090 371.4 353.4 8.3
5.90 2.126 0.230 -0.064 0.000 0.005 0.160 370.9 353.8 0.0
9.78 1.880 0.230 -0.064 0.000 0.000 3.883 368.1 356.7 -12.1
11.02 1.800 0.193 -0.064 -0.060 0.060 1.252 363.4 361.3 0.0
11.026 1.800 0.192 -0.064 -0.060 0.000 0.002 363.4 361.3 12.1
12.275 1.721 0.155 -0.064 0.000 0.060 1.252 358.8 358.8 0.0
27.94807 0.724 0.155 -0.064 0.000 0.000 15.705 347.7 347.7 -16.5
28.9 0.694 0.155 0.000 0.000 0.064 0.952 343.3 343.3 0.0
29.398
Emergence Angle 0.000 degrees
Length of Cable 58.796 m
Cut Length 60.796 m
Null point 29.398 m
Pmin 343.3 t
Extension 210 mm
71
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 7
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 1.807 0.305 0.000 0.000 386.3 338.9 0.0
2.90 1.807 0.305 0.000 0.000 0.000 3.350 383.7 341.5 -8.0
4.400 1.807 0.268 0.000 -0.050 0.050 1.500 379.3 345.9 0.0
4.40 1.807 0.267 0.000 -0.050 0.000 0.000 379.3 345.9 8.1
4.83 1.807 0.249 0.000 -0.036 0.014 0.427 378.1 347.1 14.7
5.82 1.778 0.230 -0.059 -0.003 0.092 0.993 371.5 353.7 8.3
5.90 1.773 0.230 -0.059 0.000 0.003 0.080 371.3 353.9 0.0
9.78 1.546 0.230 -0.059 0.000 0.000 3.882 368.4 356.8 -12.1
11.02 1.473 0.193 -0.059 -0.060 0.060 1.252 363.7 361.4 0.0
11.026 1.473 0.192 -0.059 -0.060 0.000 0.002 363.7 361.4 12.1
12.275 1.400 0.155 -0.059 0.000 0.060 1.252 359.1 359.1 0.0
28.02395 0.479 0.155 -0.059 0.000 0.000 15.776 348.0 348.0 -16.5
28.9 0.453 0.155 0.000 0.000 0.059 0.876 343.9 343.9 0.0
29.391
Emergence Angle 0.000 degrees
Length of Cable 58.782 m
Cut Length 60.782 m
Null point 29.391 m
Pmin 343.9 t
Extension 210 mm
72
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 8
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 1.445 0.305 0.000 0.000 386.3 339.3 0.0
2.90 1.445 0.305 0.000 0.000 0.000 3.350 383.7 341.9 -8.0
4.400 1.445 0.268 0.000 -0.050 0.050 1.500 379.3 346.3 0.0
4.40 1.445 0.267 0.000 -0.050 0.000 0.000 379.3 346.3 8.1
4.99 1.445 0.244 0.000 -0.030 0.020 0.594 377.6 348.0 14.8
5.90 1.421 0.230 -0.053 0.000 0.084 0.907 371.6 354.0 0.0
9.78 1.214 0.230 -0.053 0.000 0.000 3.881 368.7 356.9 -12.1
11.02 1.147 0.193 -0.053 -0.060 0.060 1.251 364.0 361.5 0.0
11.03 1.147 0.192 -0.053 -0.060 0.000 0.002 364.0 361.5 12.1
12.275 1.080 0.155 -0.053 0.000 0.060 1.251 359.5 359.5 0.0
28.09991 0.235 0.155 -0.053 0.000 0.000 15.847 348.2 348.2 -16.5
28.9 0.213 0.155 0.000 0.000 0.053 0.800 344.5 344.5 0.0
29.384
Emergence Angle 0.000 degrees
Length of Cable 58.769 m
Cut Length 60.769 m
Null point 29.384 m
Pmin 344.5 t
Extension 210 mm
73
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 9
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 1.086 0.305 0.000 0.000 386.3 339.5 0.0
2.90 1.086 0.305 0.000 0.000 0.000 3.350 383.7 342.1 -8.0
4.400 1.086 0.268 0.000 -0.050 0.050 1.500 379.3 346.5 0.0
4.40 1.086 0.267 0.000 -0.050 0.000 0.000 379.3 346.5 8.1
5.04 1.086 0.242 0.000 -0.029 0.021 0.644 377.4 348.3 14.8
5.90 1.065 0.230 -0.050 0.000 0.079 0.857 371.8 354.0 0.0
9.78 0.869 0.230 -0.050 0.000 0.000 3.880 368.9 356.9 -12.1
11.02 0.806 0.193 -0.050 -0.060 0.060 1.251 364.2 361.5 0.0
11.03 0.806 0.192 -0.050 -0.060 0.000 0.002 364.2 361.5 12.1
12.275 0.743 0.155 -0.050 0.000 0.060 1.251 359.6 359.6 0.0
25.2 0.091 0.155 -0.050 0.000 0.000 12.941 350.4 350.4 -5.0
27.7 0.130 0.155 0.000 0.000 0.050 2.501 345.7 345.7 0.0
28.9 0.130 0.155 0.000 0.000 0.000 1.200 344.9 344.9 0.0
29.378
Emergence Angle 0.000 degrees
Length of Cable 58.756 m
Cut Length 60.756 m
Null point 29.378 m
Pmin 344.9 t
Extension 210 mm
74
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 10
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 0.723 0.305 0.000 0.000 386.3 339.0 0.0
2.90 0.723 0.305 0.000 0.000 0.000 3.350 383.7 341.6 -8.0
4.400 0.723 0.268 0.000 -0.050 0.050 1.500 379.3 346.0 0.0
4.40 0.723 0.267 0.000 -0.050 0.000 0.000 379.3 346.0 8.1
4.92 0.723 0.246 0.000 -0.033 0.017 0.521 377.8 347.5 14.8
5.90 0.694 0.230 -0.058 0.000 0.090 0.980 371.3 354.0 0.0
9.78 0.471 0.230 -0.058 0.000 0.000 3.881 368.4 356.8 -12.1
11.02 0.399 0.193 -0.058 -0.060 0.060 1.252 363.8 361.5 0.0
11.03 0.399 0.192 -0.058 -0.060 0.000 0.002 363.8 361.5 12.1
12.275 0.327 0.155 -0.058 0.000 0.060 1.252 359.2 359.2 0.0
16.2 0.100 0.155 -0.058 0.000 0.000 3.932 356.4 356.4 -4.4
18.7 0.130 3.361 0.000 0.000 0.058 2.501 351.1 351.1 4.8
21.7 0.130 3.213 0.000 -0.049 0.049 3.001 346.1 346.1 0.0
23.2 0.130 3.139 0.000 -0.049 0.000 1.502 345.1 345.1 -11.2
24.7 0.130 2.991 0.000 0.000 0.049 1.500 341.2 341.2 0.0
28.9 0.130 2.991 0.000 0.000 0.000 4.200 338.3 338.3 0.0
29.374
Emergence Angle 0.000 degrees
Length of Cable 58.748 m
Cut Length 60.748 m
Null point 29.374 m
Pmin 338.3 t
Extension 208 mm
75
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 11
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 0.362 0.305 0.000 0.000 386.3 335.6 0.0
2.90 0.362 0.305 0.000 0.000 0.000 3.350 383.7 338.2 -7.9
4.400 0.362 0.268 0.000 -0.050 0.050 1.500 379.3 342.6 0.0
4.40 0.362 0.267 0.000 -0.050 0.000 0.000 379.3 342.6 8.0
4.90 0.362 0.247 0.000 -0.033 0.017 0.498 377.9 344.0 14.6
5.90 0.332 0.230 -0.059 0.000 0.093 1.003 371.2 350.7 0.0
6.88 0.275 0.230 -0.059 0.000 0.000 0.977 370.5 351.4 -11.9
8.12 0.201 0.193 -0.059 -0.060 0.060 1.252 365.8 356.1 0.0
8.13 0.201 0.192 -0.059 -0.060 0.000 0.002 365.8 356.1 12.0
9.375 0.127 0.155 -0.059 0.000 0.060 1.252 361.2 360.7 0.0
9.8 0.102 0.155 -0.059 0.000 0.000 0.426 360.9 360.9 -4.5
12.3 0.130 3.361 0.000 0.000 0.059 2.501 355.5 355.5 9.7
15 0.130 3.153 0.000 -0.093 0.093 2.703 348.1 348.1 0.0
16.5 0.130 3.014 0.000 -0.093 0.000 1.506 347.0 347.0 -21.0
18 0.130 2.806 0.000 0.000 0.093 1.502 340.6 340.6 0.0
28.9 0.130 2.806 0.000 0.000 0.000 10.900 333.2 333.2 0.0
29.371
Emergence Angle 0.000 degrees
Length of Cable 58.743 m
Cut Length 60.743 m
Null point 29.371 m
Pmin 333.2 t
Extension 205 mm
76
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 12
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 0.230 1.530 0.000 0.000 386.3 352.7 0.0
3.70 0.230 1.530 0.000 0.000 0.000 4.149 383.1 355.9 0.0
5.900 0.223 1.530 -0.019 0.000 0.019 2.201 380.2 358.8 0.0
9.60 0.153 1.530 -0.019 0.000 0.000 3.701 377.4 361.6 0.0
12.10 0.130 1.530 0.000 0.000 0.019 2.500 374.3 364.7 0.0
28.90 0.130 1.530 0.000 0.000 0.000 16.800 361.9 361.9 0.0
29.351
Emergence Angle 0.000 degrees
Length of Cable 58.702 m
Cut Length 60.702 m
Null point 29.351 m
Pmin 361.9 t
Extension 216 mm
77
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Cable No 13
Type of Cable 19T15
No of Strands 19
Jacking Force 386.3 t
Symmetrical Cable only half cable taken
Distances X are from anchorage point
X (m) Y (m) Z (m) Slope y Slope z Deviation Length (m) Pfriction (t) Pslip (t) (P/R)z (t/m)
-0.45 0.230 1.170 0.000 0.000 386.3 353.3 0.0
3.70 0.230 1.170 0.000 0.000 0.000 4.149 383.1 356.5 0.0
5.900 0.222 1.170 -0.015 0.000 0.015 2.201 380.4 359.1 0.0
9.60 0.167 1.170 -0.015 0.000 0.000 3.700 377.6 361.9 0.0
12.10 0.130 1.170 0.000 0.000 0.015 2.500 374.8 364.7 0.0
28.90 0.130 1.170 0.000 0.000 0.000 16.800 362.4 362.4 0.0
29.351
Emergence Angle 0.000 degrees
Length of Cable 58.701 m
Cut Length 60.701 m
Null point 29.351 m
Pmin 362.4 t
Extension 216 mm
78
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Distance Stage1
Section from end No of Ecc from
Hor Force Ver force
No Support Cables bottom
(m) (m) (t) (t)
1 1 1.100 25.579 1.473 8734.703
2 3 2.900 25.579 1.473 8770.099
3 6 5.900 25.579 1.402 9048.165
4 8 7.800 25.579 1.321 9086.335
5 10 9.700 25.579 1.237 9132.404
6 13 12.700 25.579 1.080 9166.835
7 16 15.700 25.579 0.971 9118.512
8 19 18.700 25.579 0.867 9067.581
9 22 21.700 25.579 0.770 8998.741
10 25 24.700 25.579 0.673 8923.936
11 28 27.700 25.579 0.576 8889.472
12 29 28.900 25.579 0.577 8848.505
79
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
There are no stresses developed in structure due to uniform rise/fall in temperature as the structure is
free to expand/contract. However due to temperature gradient along depth of box (rise and fall case),
eigen stresses are developed.
The temperature gradient along depth (rise/fall) have been considered as per fig 10 of IRC:6-2010 as
shown below.
Temperature Gradient
o o
17.80 C 10.6 C
150
250
o o
4 C 0.7 C
250
200
3.4
200
o
0.8 C
150
250
o o
2.1 C 6.6 C
(Temp. Rise) (Temp. Fall)
The eigen stresses have been calculated for each section along with the force and eccentricity based on
full value of E value.
The resultant temperature stresses have been combined later with stresses due to other effects like DL,
SIDL etc in tabular manner. Only 50% live load has been considered for load combination with
temperature gradient. In case there tension in the box in this load combination then untensioned steel has
been provided as per requirement.
80
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
81
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Forces due to prestress after friction and slip losses are input along with sectional properties and
various design moments like dead load, SIDL and live load
Stagewise calculations of losses and stresses is done in systematic manner. The following are the
stages for Stress Check:
1 Immediately after Prestressing. Prestressing shall be done when web and deck slab concrete is
28 days old with a minimum strength of 45 MPa.
2 Immediately after prestessing considering elastic shortening loss.
3 Immediately after prestessing considering elastic relaxation loss.
4 Immediately after SIDL is laid.
5 At 90 days considering creep, shrinkage & relaxation losses as per clause IRC112
82
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Time dependent Losses in Prestress for each of these stage have been Calculated as follows
Losses due to elastic shortening of concrete has been calculated as given below
Elastic Shortening = (final stress - initial stress)/2 * area of cable * E steel / Econc
Where the initial and final stresses in concrete are calculated at net cg of Cable before and after the
elastic shortening losses.
The effect of elastic shortening has been taken into account as per sequence of prestressing.
Creep = (Initial Stress + final Stress) / 2 * (initial creep - final creep) * E steel * area of Cable
Where
Initial and final stresses in concrete are calculated at net cg of Cable before and after the losses
Shrinkage = (Initial residual shrinkage - final residual shrinkage ) * Esteel * area of Cable
Where
Initial Shrinkage and final Shrinkage in concrete is as per IRC112
The 1000 hr relaxation loss based on low relaxation steel and average initial force in the cable is
calculated as per IRC 112. The total relaxation losses is taken 3 times the 1000hr relaxation losses.
Losses in intermediate time is calculated as per IRC 112
83
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Shrinkage calculations
Age of concrte at the time considered,t days 120.00 90.000 50000.000
Age of concrte at the time of beginning of dry
15 shrinkage,ts days 14.00 14.00 14.00
16 kh 0.706 0.706 0.706
17 ds(t,ts) 0.204 0.155 0.992
18 cd 0.000252 0.000252 0.000252
19 cd(t) 0.0000363 0.0000276 0.0001765
20 as 0.888 0.850 1.000
21 cw 0.000065 0.000065 0.000065
22 ca(t) 0.000058 0.000055 0.000065
23 cs=cs+cs 0.000094 0.000083 0.000242
84
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
85
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Relaxation loss
= %age of total
Initial Final Av. Force/Cable Total Relaxation %age of
Relaxation
Stress Stress after Elastic Losses =3*1000 HR total
*Total
(t/m2) (t/m2) Shortening (t) losses (t) Relaxation
Relaxation
Loss (t)
86
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Actual Creep = (
Initial Final Initial Stress + final
Creep Strain Creep Strain Creep
Stress Stress Stress ) / 2 * ( initial -
(Initial) (final) assumed (t)
(t/m2) (t/m2) final ) * 19500000 *
0.00266 / 1000
87
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
88
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Sr. Section No. SEC#1 SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
No
Distance from end support (m) 1.100 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
1. AREA (m 2 ) 13.739 13.739 13.739 12.362 12.362 10.371 10.371 10.371 10.371 10.371 10.371 10.371
2. Total Depth (m) 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400
3. MOI (m4) 20.576 20.576 20.576 19.716 19.716 16.023 16.023 16.023 16.023 16.023 16.023 16.023
4. Y top (m) 1.410 1.410 1.410 1.372 1.372 1.187 1.187 1.187 1.187 1.187 1.187 1.187
5. Y bot (m) 1.990 1.990 1.990 2.028 2.028 2.213 2.213 2.213 2.213 2.213 2.213 2.213
6. Z top (m3) 14.593 14.593 14.593 14.370 14.370 13.499 13.499 13.499 13.499 13.499 13.499 13.499
7. Z bot (m3) 10.340 10.340 10.340 9.722 9.722 7.240 7.240 7.240 7.240 7.240 7.240 7.240
DL MOMENT
8. DL MOMENT ( tm ) 881.2 2234.0 4248.9 5376.3 6392.1 7780.0 8923.4 9833.5 10510 10954 11164 11182.2
9. TOP STRESS (t/m 2 ) 60.4 153.1 291.2 374.1 444.8 576.4 661.1 728.5 778.6 811.5 827.0 828.4
10. BOTTOM STRESS (t/m 2 ) -85.2 -216.1 -410.9 -553.0 -657.5 -1074.5 -1232.5 -1358.1 -1451.6 -1512.8 -1541.8 -1544.4
89
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Sr. Section No. SEC#1 SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
No
Distance from end support (m) 1.100 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
23 PRESTR STG1 CABLE- AFTER ES (t) 8555.1 8590.5 8868.6 8906.7 8952.8 8987.2 8938.9 8888.0 8819.2 8744.3 8709.9 8668.9
24 TOP STRESS (t/m 2 ) 319.5 320.9 287.9 282.1 231.4 112.1 39.6 -29.2 -92.5 -154.7 -216.1 -214.8
25 BOTTOM STRESS (t/m 2 ) 1050.5 1054.9 1150.2 1368.5 1452.7 2273.2 2395.0 2509.2 2608.3 2703.5 2808.5 2794.7
29 SIGMA (Top) (t/m 2 ) 380 474 579 656 676 689 701 699 686 657 611 614
30 SIGMA (Bottom) (t/m 2 ) 965 839 739 816 795 1199 1163 1151 1157 1191 1267 1250
STR @ C.G. OF STG1 BOT CABLE (t/m 2 ) 711.7 680.8 673.3 753.6 751.9 1036.7 1030.6 1035.9 1050.2 1085.1 1155.5 1142.3
AVG STR AT EACH SECTION (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LENGTH (m) (m)
2
STR @ C.G.OF STG1 TOP CABLE (t/m ) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
AVG STR AT EACH SECTION (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
55 SIDL MOMENT (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
56 TOP STRESS (t/m 2 ) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
57 BOTTOM STRESS (t/m 2 ) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
58 SIGMA ( Top ) (t/m 2 ) 377 471 577 654 674 688 700 700 687 658 613 616
59 SIGMA ( Bottom ) (t/m 2 ) 956 829 729 804 783 1179 1142 1129 1134 1167 1242 1226
90
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Sr. Section No. SEC#1 SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
No
Distance from end support (m) 1.100 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
91
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
Sr. Section No. SEC#1 SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
No
Distance from end support (m) 1.100 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
LOSSES @ INFINITY DAYS
79 CREEP LOSS STG1 CABLE (t) 220.75 220.75 220.75 220.75 220.75 220.75 220.75 220.75 220.75 220.75 220.75 220.75
80 SHRINKAGE LOSS STG1 CABLE (t) 195.93 195.93 195.93 195.93 195.93 195.93 195.93 195.93 195.93 195.93 195.93 195.93
81 RELAXATION LOSS STG1 CABLE (t) 402.36 402.36 402.36 402.36 402.36 402.36 402.36 402.36 402.36 402.36 402.36 402.36
82 TOTAL LOSSES STG1 CABLE (t) 819.04 819.04 819.04 819.04 819.04 819.04 819.04 819.04 819.04 819.04 819.04 819.04
83 TOTAL WITH LONG TERM LOSSES (t) 819.0 819.0 819.0 819.0 819.0 819.0 819.0 819.0 819.0 819.0 819.0 819.0
84 TOP STRESS (t/m 2 ) -30.6 -30.6 -26.6 -25.9 -21.2 -10.2 -3.6 2.7 8.6 14.5 20.3 20.3
85 BOTTOM STRESS (t/m 2 ) -100.6 -100.6 -106.2 -125.8 -132.9 -207.2 -219.4 -231.2 -242.2 -253.2 -264.1 -264.0
STRESS CHECK (AT INFINITY WITHOUT LIVELOAD)
86 SIGMA ( Top ) (t/m 2 ) 352.8 467.9 610.2 707.9 751.1 809.6 851.4 874.8 881.9 868.5 834.1 837.0
87 SIGMA ( Bottom ) (t/m 2 ) 812.1 655.9 503.7 520.3 465.7 671.3 580.3 522.4 490.4 494.7 549.1 532.2
STRESS CHECK (AT INFINITY WITH LIVELOAD)
88 SIGMA ( Top ) (t/m 2 ) 370 510 691 811 872 964 1023 1059 1077 1070 1038 1040
89 SIGMA ( Bottom ) (t/m 2 ) 788 596 390 369 287 384 260 180 127 119 170 154
92
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
SR SECTION NO. UNITS SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
NO
DISTANCE FROM END SUPPORT 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
DETAILS OF PRESTRESSING
1 HORIZ. PRESTR. FORCE - STG1 BOT (t) 8780.3 9053.1 9094.0 9139.6 9166.8 9118.5 9068.1 9003.0 8928.2 8893.7 8852.7
2 NO OF CABLES - STG1 BOT 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58
3 CABLE C.G.(FROM BOTT.) (m) 1.475 1.401 1.323 1.243 1.088 0.976 0.869 0.769 0.672 0.576 0.577
4 VERT COMPONENT OF PRESTR. - STG1 BOT (t) 0.0 364.1 388.0 367.3 339.0 337.1 306.2 295.3 293.5 267.2 265.5
5 HORIZ. PRESTR. FORCE AFTER LOSSES - STG1 BOT (t) 7602.1 7875.0 7915.8 7961.4 7988.6 7940.3 7889.9 7824.8 7750.0 7715.5 7674.6
6 VERT PRESTR. FORCE AFTER LOSSES - STG1 BOT (t) 0.0 316.7 337.8 320.0 295.4 293.5 266.4 256.6 254.8 231.8 230.2
13 TOTAL HORIZ. PRESTR. FORCE AFTER LOSSES (t) 7602.1 7875.0 7915.8 7961.4 7988.6 7940.3 7889.9 7824.8 7750.0 7715.5 7674.6
14 TOTAL VERT COMPONENT OF PRESTR. AFTER LOSSES (t) 0.0 316.7 337.8 320.0 295.4 293.5 266.4 256.6 254.8 231.8 230.2
15 TOTAL NO OF CABLES 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6
16 NET ECC FROM BOTTOM (m) 1.475 1.401 1.323 1.243 1.088 0.976 0.869 0.769 0.672 0.576 0.577
SECTION PROPERTIES
35 SOFFIT WIDTH (m) 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900
36 DECK WIDTH (m) 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500
17 WIDTH AT TOP OF CELL (m) 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700
18 EFF WIDTH OF COMPR FLANGE (m) 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500
19 WIDTH OF WEB BW (m) 0.610 0.460 0.460 0.460 0.310 0.310 0.310 0.310 0.310 0.310 0.310
20 NO OF WEB 2 2 2 2 2 2 2 2 2 2 2
21 DUCT DIA DDUCT m 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110
22 EFFECTIVE WIDTHOF WEB (BW-0.5*DDUCT) m 1.110 0.810 0.810 0.810 0.510 0.510 0.510 0.510 0.510 0.510 0.510
23 DECK SLAB THICKNESS m 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230
24 SOFFIT SLAB THICKNESS m 0.400 0.400 0.400 0.400 0.260 0.260 0.260 0.260 0.260 0.260 0.260
23 DEP OF COMPRESSION FLANGE m 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230
24 Db m 2.720 2.720 2.720 2.720 2.720 2.720 2.720 2.720 2.728 2.824 2.823
25 TOTAL DEPTH OF BOX SECTION FOR SHEAR (m) 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400
26 AREA OF BOX SECTION (m2) 13.739 13.739 12.362 12.362 10.371 10.371 10.371 10.371 10.371 10.371 10.371
27 C.G. OF BOX SECTION FROM BOTTOM (m) 1.990 1.990 2.028 2.028 2.213 2.213 2.213 2.213 2.213 2.213 2.213
28 MOMENT OF INERTIA OF BOX SECTION (m4) 20.576 20.576 19.716 19.716 16.023 16.023 16.023 16.023 16.023 16.023 16.023
29 AY BOX SECTION (m3) 10.340 10.340 9.722 9.722 7.240 7.240 7.240 7.240 7.240 7.240 7.240
30 AREA ENCL C/I OF BOX (Ak) (m2) 29.292 29.523 29.523 29.523 30.430 30.430 30.430 30.430 30.430 30.430 30.430
31 PERIMETER OF Ak (m) 25.160 25.310 25.310 25.310 25.600 25.600 25.600 25.600 25.600 25.600 25.600
S= First Moment of Inertia (m3) 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310
32 FCK (Mpa) 45 45 45 45 45 45 45 45 45 45 45
93
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
SR SECTION NO. UNITS SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
NO
DISTANCE FROM END SUPPORT 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
33 DUE TO DL (t) 801.8 694.6 629.9 565.3 470.7 383.5 296.3 209.2 122.0 34.9 0.0
55 DUE TO STAGE 2 DL (t) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
34 DUE TO S.I.D.L. (t) 83.9 74.2 68.0 61.9 52.2 42.6 32.9 23.2 13.5 3.9 0.0
35 DUE TO LIVE LOAD (t) 60.6 53.9 50.6 46.8 41.0 36.3 32.8 29.2 26.2 22.7 52.3
36 DUE TO FOOTPATH LIVE LOAD (t) 17.5 15.6 14.5 13.4 11.8 10.3 8.9 7.6 6.4 5.3 12.0
36 DUE TO HYPERSTATIC REACTIONS IMM (t) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL SHEAR (t) 1340.2 1166.3 1062.1 957.1 801.9 658.5 516.9 375.6 235.0 93.9 160.8
37
Bending Moments
38 DUE TO STAGE1 DL (tm) 2482.7 4727.4 5985.7 7121.1 8675.0 9956.2 10975.9 11734.2 12231.0 12466.3 12487.3
66 DUE TO STAGE 2 DL (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
39 DUE TO S.I.D.L. (tm) 256.7 493.8 628.9 752.3 923.6 1065.8 1179.0 1263.2 1318.3 1344.5 1346.8
40 DUE TO CREEP REDISTRIBUTION OF DL (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
40 DUE TO LIVE LOAD (tm) 175.7 333.6 420.6 491.9 578.4 645.2 612.6 634.6 646.6 628.1 1574.3
41 DUE TO FOOTPATH LIVE LOAD (tm) 50.7 92.1 113.0 130.1 149.7 161.3 165.7 163.9 156.8 145.5 4.4
41 HYP IMM (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
42 HYP INF (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
43 DUE TO HYPERSTATIC REACTIONS (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
44 DUE TO CREEP REDISTRIBUTION OF PRESTRESS (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
45 DUE TO DIFFERENTIAL SETTLEMENT (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
46 DESIGN MOMENT (tm) 4123 7852 9942 11818 14367 16459 17990 19192 19969 20292 21583
42 ULTIMATE DESIGN MOMENT (tm) 4123 7852 9942 11818 14367 16459 17990 19192 19969 20292 21583
533 262 192 72 28 -151 -259 -336 -362 -314 -615
Fctk0.05/1.5 -156 -156 -156 -156 -156 -156 -156 -156 -156 -156 156
94
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
SR SECTION NO. UNITS SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
NO
DISTANCE FROM END SUPPORT 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
60 Design value of Concrete tensile strength(f ctd = f ct / g m ) (t/m2) 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0 161.0
61 k1 = 1 for prestressed concrete 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
61 s cp = Mean Compressive strength (t/m2) 553.3 573.2 640.3 644.0 770.3 765.6 760.8 754.5 747.3 744.0 740.0
FCD (t/m2) 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2
UNCRACKED SHEAR CAPACITY OF THE SECTION
2 1508.3 1115.6 1116.3 1118.8 615.3 613.8 612.2 610.1 607.7 606.6 404.5
(I * Bw /S * (SQRT (fctd2+ k1* s cp *f ctd )) (t/m )
62
1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
Shear capacity of the cracked section
63 K =(1+sqrt(200/d)),d is in mm. (m) 1.271 1.271 1.271 1.271 1.271 1.271 1.271 1.271 1.271 1.266 2.823
64 r 1 = Min(A sl /b w /d,.02) (m) 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 2.213
(t/m2) 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 2474.4
3/2 (1/2)
65 Vmin = 0.031K f ck
66 V Rd,c 1 (tm) 443.0 329.8 352.0 353.2 248.6 247.7 246.7 245.4 244.5 252.1 16129.8
67 V Rd,c 2 =(V min +.15* s cp )b w *d t 342.2 256.2 278.4 279.6 202.3 201.4 200.3 199.0 198.1 204.1 116.3
68 SHEAR CAPACITY OF THE CRACKED SECTION (VCR) (t) 443 330 352 353 249 248 247 245 245 252 155.9
69 SHEAR CAPACITY OF THE CONCRETE SECTION (t) 1508.3 1115.6 1116.3 1118.8 615.3 613.8 246.7 245.4 244.5 252.1 155.9
70 CRACKED OR UNCRACKED un cr un cr un cr un cr un cr un cr cr cr cr cr cr
71 V -Vp(ULTIMATE) (CALCULATED ABOVE) (t) 1340.2 849.6 724.4 637.1 506.4 365.0 250.5 118.9 0.0 0.0 0.0
73 MAX ALLOWABLE SHEAR STRESS ( FOR M 50 GRADE ) T/m2 487 487 487 487 487 487 487 487 487 487 487
75 Ved =(V-Vp) (t) 1340.2 849.6 724.4 637.1 506.4 365.0 250.5 118.9 0.0 0.0 0.0
a cw = 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3
V Rd,max /(COT(THETA)+TAN(THETA)) (t) 3285.9 2489.4 2586.6 2686.9 1813.5 1900.9 1985.0 2062.9 2139.1 2214.4 2214.1
Theta( q ) 27.4 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5
V Rd,max (t) 1341.8 880.2 914.5 950.0 641.2 672.1 701.8 729.3 756.3 782.9 782.8
OK OK OK OK OK OK OK OK OK OK OK
76 ASV/SV (TOTAL) (cm2/m) 11.78 8.89 8.89 8.89 5.99 5.99 11.78 5.99 5.99 5.99 5.99
78 ASV/SV PER WEB (cm2/m) 5.89 4.44 4.44 4.44 2.99 2.99 5.89 2.99 2.99 2.99 2.99
95
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
SR SECTION NO. UNITS SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
NO
DISTANCE FROM END SUPPORT 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
DETAILS OF PRESTRESSING
1 HORIZ. PRESTR. FORCE - STG1 BOT (t) 8780.3 9053.1 9094.0 9139.6 9166.8 9118.5 9068.1 9003.0 8928.2 8893.7 8852.7
2 NO OF CABLES - STG1 BOT 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58
3 CABLE C.G.(FROM BOTT.) (m) 1.475 1.401 1.323 1.243 1.088 0.976 0.869 0.769 0.672 0.576 0.577
4 VERT COMPONENT OF PRESTR. - STG1 BOT (t) 0.0 364.1 388.0 367.3 339.0 337.1 306.2 295.3 293.5 267.2 265.5
5 HORIZ. PRESTR. FORCE AFTER LOSSES - STG1 BOT (t) 7602.1 7875.0 7915.8 7961.4 7988.6 7940.3 7889.9 7824.8 7750.0 7715.5 7674.6
6 VERT PRESTR. FORCE AFTER LOSSES - STG1 BOT (t) 0.0 316.7 337.8 320.0 295.4 293.5 266.4 256.6 254.8 231.8 230.2
13 TOTAL HORIZ. PRESTR. FORCE AFTER LOSSES (t) 7602.1 7875.0 7915.8 7961.4 7988.6 7940.3 7889.9 7824.8 7750.0 7715.5 7674.6
14 TOTAL VERT COMPONENT OF PRESTR. AFTER LOSSES (t) 0.0 316.7 337.8 320.0 295.4 293.5 266.4 256.6 254.8 231.8 230.2
15 TOTAL NO OF CABLES 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6
16 NET ECC FROM BOTTOM (m) 1.475 1.401 1.323 1.243 1.088 0.976 0.869 0.769 0.672 0.576 0.577
SECTION PROPERTIES
35 SOFFIT WIDTH (m) 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900
36 DECK WIDTH (m) 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500
17 WIDTH AT TOP OF CELL (m) 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700
18 EFF WIDTH OF COMPR FLANGE (m) 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500
19 WIDTH OF WEB BW (m) 0.610 0.460 0.460 0.460 0.310 0.310 0.310 0.310 0.310 0.310 0.310
20 NO OF WEB 2 2 2 2 2 2 2 2 2 2 2
21 DUCT DIA DDUCT m 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110
22 EFFECTIVE WIDTHOF WEB (BW-0.5*DDUCT) m 1.110 0.810 0.810 0.810 0.510 0.510 0.510 0.510 0.510 0.510 0.510
23 DECK SLAB THICKNESS m 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230
24 SOFFIT SLAB THICKNESS m 0.400 0.400 0.400 0.400 0.260 0.260 0.260 0.260 0.260 0.260 0.260
23 DEP OF COMPRESSION FLANGE m 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230
24 Db m 2.720 2.720 2.720 2.720 2.720 2.720 2.720 2.720 2.728 2.824 2.823
25 TOTAL DEPTH OF BOX SECTION FOR SHEAR (m) 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400
26 AREA OF BOX SECTION (m2) 13.739 13.739 12.362 12.362 10.371 10.371 10.371 10.371 10.371 10.371 10.371
27 C.G. OF BOX SECTION FROM BOTTOM (m) 1.990 1.990 2.028 2.028 2.213 2.213 2.213 2.213 2.213 2.213 2.213
28 MOMENT OF INERTIA OF BOX SECTION (m4) 20.576 20.576 19.716 19.716 16.023 16.023 16.023 16.023 16.023 16.023 16.023
29 AY BOX SECTION (m3) 10.340 10.340 9.722 9.722 7.240 7.240 7.240 7.240 7.240 7.240 7.240
30 AREA ENCL C/I OF BOX (Ak) (m2) 29.292 29.523 29.523 29.523 30.430 30.430 30.430 30.430 30.430 30.430 30.430
31 PERIMETER OF Ak (m) 25.160 25.310 25.310 25.310 25.600 25.600 25.600 25.600 25.600 25.600 25.600
S= First Moment of Inertia (m3) 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310
32 FCK (Mpa) 45 45 45 45 45 45 45 45 45 45 45
97
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
SR SECTION NO. UNITS SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
NO
DISTANCE FROM END SUPPORT 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
33 DUE TO DL (t) 801.8 694.6 629.9 565.3 470.7 383.5 296.3 209.2 122.0 34.9 0.0
55 DUE TO STAGE 2 DL (t) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
34 DUE TO S.I.D.L. (t) 83.9 74.2 68.0 61.9 52.2 42.6 32.9 23.2 13.5 3.9 0.0
35 DUE TO LIVE LOAD (t) 121.1 107.8 101.3 93.6 82.0 72.6 65.5 58.5 52.4 45.4 38.7
36 DUE TO FOOTPATH LIVE LOAD (t) 17.5 15.6 14.5 13.4 11.8 10.3 8.9 7.6 6.4 5.3 4.4
36 DUE TO HYPERSTATIC REACTIONS IMM (t) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL SHEAR (t) 1431.0 1247.1 1138.1 1027.3 863.4 713.0 566.1 419.4 274.3 127.9 63.2
37
Bending Moments
38 DUE TO STAGE1 DL (tm) 2482.7 4727.4 5985.7 7121.1 8675.0 9956.2 10975.9 11734.2 12231.0 12466.3 12487.3
66 DUE TO STAGE 2 DL (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
39 DUE TO S.I.D.L. (tm) 256.7 493.8 628.9 752.3 923.6 1065.8 1179.0 1263.2 1318.3 1344.5 1346.8
40 DUE TO CREEP REDISTRIBUTION OF DL (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
40 DUE TO LIVE LOAD (tm) 351.3 667.2 841.2 983.8 1156.8 1290.4 1225.2 1269.2 1293.3 1256.2 1166.1
41 DUE TO FOOTPATH LIVE LOAD (tm) 50.7 92.1 113.0 130.1 149.7 161.3 165.7 163.9 156.8 145.5 151.3
41 HYP IMM (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
42 HYP INF (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
43 DUE TO HYPERSTATIC REACTIONS (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
44 DUE TO CREEP REDISTRIBUTION OF PRESTRESS (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
45 DUE TO DIFFERENTIAL SETTLEMENT (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
46 DESIGN MOMENT (tm) 4386 8353 10573 12555 15235 17427 18909 20144 20939 21234 21138
42 ULTIMATE DESIGN MOMENT (tm) 4386 8353 10573 12555 15235 17427 18909 20144 20939 21234 21138
508 214 127 -4 -92 -285 -386 -468 -496 -445 -445
Fctk0.05/1.5 -156 -156 -156 -156 -156 -156 -156 -156 -156 -156 -156
98
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
SR SECTION NO. UNITS SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
NO
DISTANCE FROM END SUPPORT 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
60 Design value of Concrete tensile strength(f ctd = f ct / g m ) (t/m2) 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0
61 k1 = 1 for prestressed concrete 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
61 s cp = Mean Compressive strength (t/m2) 553.3 573.2 640.3 644.0 770.3 765.6 760.8 754.5 747.3 744.0 740.0
FCD (t/m2) 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2
UNCRACKED SHEAR CAPACITY OF THE SECTION
2 1508.3 1115.6 1116.3 1118.8 615.3 613.8 612.2 610.1 607.7 606.6 605.3
(I * Bw /S * (SQRT (fctd2+ k1* s cp *f ctd )) (t/m )
62
1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
Shear capacity of the cracked section
63 K =(1+sqrt(200/d)),d is in mm. (m) 1.271 1.271 1.271 1.271 1.271 1.271 1.271 1.271 1.271 1.266 1.266
64 r 1 = Min(A sl /b w /d,.02) (m) 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020
(t/m2) 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
3/2 (1/2)
65 Vmin = 0.031K f ck
66 V Rd,c 1 (tm) 443.0 329.8 352.0 353.2 248.6 247.7 246.7 245.4 244.5 252.1 251.2
67 V Rd,c 2 =(V min +.15* s cp )b w *d t 342.2 256.2 278.4 279.6 202.3 201.4 200.3 199.0 198.1 204.1 203.2
68 SHEAR CAPACITY OF THE CRACKED SECTION (VCR) (t) 443 330 352 353 249 248 247 245 245 252 251
69 SHEAR CAPACITY OF THE CONCRETE SECTION (t) 1508.3 1115.6 1116.3 1118.8 615.3 247.7 246.7 245.4 244.5 252.1 251.2
70 CRACKED OR UNCRACKED un cr un cr un cr un cr un cr cr cr cr cr cr cr
71 V -Vp(ULTIMATE) (CALCULATED ABOVE) (t) 1431.0 930.4 800.3 707.3 567.9 419.5 299.7 162.8 19.5 0.0 0.0
73 MAX ALLOWABLE SHEAR STRESS ( FOR M 50 GRADE ) T/m2 487 487 487 487 487 487 487 487 487 487 487
75 Ved =(V-Vp) (t) 1431.0 930.4 800.3 707.3 567.9 419.5 299.7 162.8 19.5 0.0 0.0
a cw = 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3
V Rd,max /(COT(THETA)+TAN(THETA)) (t) 3285.9 2489.4 2586.6 2686.9 1813.5 1900.9 1985.0 2062.9 2139.1 2214.4 2214.1
Theta( q ) 30.3 24.2 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5
V Rd,max (t) 1432.4 931.9 914.5 950.0 641.2 672.1 701.8 729.3 756.3 782.9 782.8
OK OK OK OK OK OK OK OK OK OK OK
76 ASV/SV (TOTAL) (cm2/m) 11.78 8.89 8.89 8.89 5.99 20.60 14.09 5.99 5.99 5.99 5.99
78 ASV/SV PER WEB (cm2/m) 5.89 4.44 4.44 4.44 2.99 10.30 7.05 2.99 2.99 2.99 2.99
99
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
SR SECTION NO. UNITS SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
NO
DISTANCE FROM END SUPPORT 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
DETAILS OF PRESTRESSING
1 HORIZ. PRESTR. FORCE - STG1 BOT (t) 8780.3 9053.1 9094.0 9139.6 9166.8 9118.5 9068.1 9003.0 8928.2 8893.7 8852.7
2 NO OF CABLES - STG1 BOT 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58
3 CABLE C.G.(FROM BOTT.) (m) 1.475 1.401 1.323 1.243 1.088 0.976 0.869 0.769 0.672 0.576 0.577
4 VERT COMPONENT OF PRESTR. - STG1 BOT (t) 0.0 364.1 388.0 367.3 339.0 337.1 306.2 295.3 293.5 267.2 265.5
5 HORIZ. PRESTR. FORCE AFTER LOSSES - STG1 BOT (t) 7602.1 7875.0 7915.8 7961.4 7988.6 7940.3 7889.9 7824.8 7750.0 7715.5 7674.6
6 VERT PRESTR. FORCE AFTER LOSSES - STG1 BOT (t) 0.0 316.7 337.8 320.0 295.4 293.5 266.4 256.6 254.8 231.8 230.2
13 TOTAL HORIZ. PRESTR. FORCE AFTER LOSSES (t) 7602.1 7875.0 7915.8 7961.4 7988.6 7940.3 7889.9 7824.8 7750.0 7715.5 7674.6
14 TOTAL VERT COMPONENT OF PRESTR. AFTER LOSSES (t) 0.0 316.7 337.8 320.0 295.4 293.5 266.4 256.6 254.8 231.8 230.2
15 TOTAL NO OF CABLES 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6
16 NET ECC FROM BOTTOM (m) 1.475 1.401 1.323 1.243 1.088 0.976 0.869 0.769 0.672 0.576 0.577
SECTION PROPERTIES
35 SOFFIT WIDTH (m) 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900
36 DECK WIDTH (m) 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500
17 WIDTH AT TOP OF CELL (m) 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700
18 EFF WIDTH OF COMPR FLANGE (m) 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500
19 WIDTH OF WEB BW (m) 0.610 0.460 0.460 0.460 0.310 0.310 0.310 0.310 0.310 0.310 0.310
20 NO OF WEB 2 2 2 2 2 2 2 2 2 2 2
21 DUCT DIA DDUCT m 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110
22 EFFECTIVE WIDTHOF WEB (BW-0.5*DDUCT) m 1.110 0.810 0.810 0.810 0.510 0.510 0.510 0.510 0.510 0.510 0.510
23 DECK SLAB THICKNESS m 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230
24 SOFFIT SLAB THICKNESS m 0.400 0.400 0.400 0.400 0.260 0.260 0.260 0.260 0.260 0.260 0.260
23 DEP OF COMPRESSION FLANGE m 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230
24 Db m 2.720 2.720 2.720 2.720 2.720 2.720 2.720 2.720 2.728 2.824 2.823
25 TOTAL DEPTH OF BOX SECTION FOR SHEAR (m) 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400
26 AREA OF BOX SECTION (m2) 13.739 13.739 12.362 12.362 10.371 10.371 10.371 10.371 10.371 10.371 10.371
27 C.G. OF BOX SECTION FROM BOTTOM (m) 1.990 1.990 2.028 2.028 2.213 2.213 2.213 2.213 2.213 2.213 2.213
28 MOMENT OF INERTIA OF BOX SECTION (m4) 20.576 20.576 19.716 19.716 16.023 16.023 16.023 16.023 16.023 16.023 16.023
29 AY BOX SECTION (m3) 10.340 10.340 9.722 9.722 7.240 7.240 7.240 7.240 7.240 7.240 7.240
30 AREA ENCL C/I OF BOX (Ak) (m2) 29.292 29.523 29.523 29.523 30.430 30.430 30.430 30.430 30.430 30.430 30.430
31 PERIMETER OF Ak (m) 25.160 25.310 25.310 25.310 25.600 25.600 25.600 25.600 25.600 25.600 25.600
S= First Moment of Inertia (m3) 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310
32 FCK (Mpa) 45 45 45 45 45 45 45 45 45 45 45
101
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
SR SECTION NO. UNITS SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
NO
DISTANCE FROM END SUPPORT 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
33 DUE TO DL (t) 801.8 694.6 629.9 565.3 470.7 383.5 296.3 209.2 122.0 34.9 0.0
55 DUE TO STAGE 2 DL (t) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
34 DUE TO S.I.D.L. (t) 83.9 74.2 68.0 61.9 52.2 42.6 32.9 23.2 13.5 3.9 0.0
35 DUE TO LIVE LOAD (t) 111.3 99.4 92.1 87.2 78.8 72.9 66.6 61.0 54.7 49.2 52.3
36 DUE TO FOOTPATH LIVE LOAD (t) 17.5 15.6 14.5 13.4 11.8 10.3 8.9 7.6 6.4 5.3 12.0
36 DUE TO HYPERSTATIC REACTIONS IMM (t) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL SHEAR (t) 1416.2 1234.5 1124.3 1017.8 858.6 713.4 567.6 423.3 277.8 133.6 160.8
37
Bending Moments
38 DUE TO STAGE1 DL (tm) 2482.7 4727.4 5985.7 7121.1 8675.0 9956.2 10975.9 11734.2 12231.0 12466.3 12487.3
66 DUE TO STAGE 2 DL (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
39 DUE TO S.I.D.L. (tm) 256.7 493.8 628.9 752.3 923.6 1065.8 1179.0 1263.2 1318.3 1344.5 1346.8
40 DUE TO CREEP REDISTRIBUTION OF DL (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
40 DUE TO LIVE LOAD (tm) 322.7 586.3 718.2 846.2 1001.0 1144.3 1244.7 1324.3 1351.1 1361.9 1574.3
41 DUE TO FOOTPATH LIVE LOAD (tm) 50.7 92.1 113.0 130.1 149.7 161.3 165.7 163.9 156.8 145.5 4.4
41 HYP IMM (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
42 HYP INF (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
43 DUE TO HYPERSTATIC REACTIONS (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
44 DUE TO CREEP REDISTRIBUTION OF PRESTRESS (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
45 DUE TO DIFFERENTIAL SETTLEMENT (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
46 DESIGN MOMENT (tm) 4343 8231 10388 12349 15001 17208 18938 20227 21026 21393 21583
42 ULTIMATE DESIGN MOMENT (tm) 4343 8231 10388 12349 15001 17208 18938 20227 21026 21393 21583
512 225 146 17 -60 -254 -390 -479 -508 -466 -615
Fctk0.05/1.5 -156 -156 -156 -156 -156 -156 -156 -156 -156 -156 156
102
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
SR SECTION NO. UNITS SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
NO
DISTANCE FROM END SUPPORT 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
60 Design value of Concrete tensile strength(f ctd = f ct / g m ) (t/m2) 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0
61 k1 = 1 for prestressed concrete 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
61 s cp = Mean Compressive strength (t/m2) 553.3 573.2 640.3 644.0 770.3 765.6 760.8 754.5 747.3 744.0 740.0
FCD (t/m2) 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2
UNCRACKED SHEAR CAPACITY OF THE SECTION
2 1508.3 1115.6 1116.3 1118.8 615.3 613.8 612.2 610.1 607.7 606.6 605.3
(I * Bw /S * (SQRT (fctd2+ k1* s cp *f ctd )) (t/m )
62
1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
Shear capacity of the cracked section
63 K =(1+sqrt(200/d)),d is in mm. (m) 1.271 1.271 1.271 1.271 1.271 1.271 1.271 1.271 1.271 1.266 2.823
64 r 1 = Min(A sl /b w /d,.02) (m) 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 2.213
(t/m2) 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 2474.4
3/2 (1/2)
65 Vmin = 0.031K f ck
66 V Rd,c 1 (tm) 443.0 329.8 352.0 353.2 248.6 247.7 246.7 245.4 244.5 252.1 16129.8
67 V Rd,c 2 =(V min +.15* s cp )b w *d t 342.2 256.2 278.4 279.6 202.3 201.4 200.3 199.0 198.1 204.1 116.3
68 SHEAR CAPACITY OF THE CRACKED SECTION (VCR) (t) 443 330 352 353 249 248 247 245 245 252 155.9
69 SHEAR CAPACITY OF THE CONCRETE SECTION (t) 1508.3 1115.6 1116.3 1118.8 615.3 247.7 246.7 245.4 244.5 252.1 155.9
70 CRACKED OR UNCRACKED un cr un cr un cr un cr un cr cr cr cr cr cr cr
71 V -Vp(ULTIMATE) (CALCULATED ABOVE) (t) 1416.2 917.8 786.5 697.8 563.2 419.8 301.2 166.6 23.0 0.0 160.8
73 MAX ALLOWABLE SHEAR STRESS ( FOR M 50 GRADE ) T/m2 487 487 487 487 487 487 487 487 487 487 470
75 Ved =(V-Vp) (t) 1416.2 917.8 786.5 697.8 563.2 419.8 301.2 166.6 23.0 0.0 160.8
a cw = 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3
V Rd,max /(COT(THETA)+TAN(THETA)) (t) 3285.9 2489.4 2586.6 2686.9 1813.5 1900.9 1985.0 2062.9 2139.1 2214.4 2214.1
Theta( q ) 29.8 23.8 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5
V Rd,max (t) 1417.7 919.3 914.5 950.0 641.2 672.1 701.8 729.3 756.3 782.9 782.8
OK OK OK OK OK OK OK OK OK OK OK
76 ASV/SV (TOTAL) (cm2/m) 11.78 8.89 8.89 8.89 5.99 20.62 14.16 5.99 5.99 5.99 6.78
78 ASV/SV PER WEB (cm2/m) 5.89 4.44 4.44 4.44 2.99 10.31 7.08 2.99 2.99 2.99 3.39
103
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
SR SECTION NO. UNITS SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
NO
DISTANCE FROM END SUPPORT 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
DETAILS OF PRESTRESSING
1 HORIZ. PRESTR. FORCE - STG1 BOT (t) 8780.3 9053.1 9094.0 9139.6 9166.8 9118.5 9068.1 9003.0 8928.2 8893.7 8852.7
2 NO OF CABLES - STG1 BOT 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58 25.58
3 CABLE C.G.(FROM BOTT.) (m) 1.475 1.401 1.323 1.243 1.088 0.976 0.869 0.769 0.672 0.576 0.577
4 VERT COMPONENT OF PRESTR. - STG1 BOT (t) 0.0 364.1 388.0 367.3 339.0 337.1 306.2 295.3 293.5 267.2 265.5
5 HORIZ. PRESTR. FORCE AFTER LOSSES - STG1 BOT (t) 7602.1 7875.0 7915.8 7961.4 7988.6 7940.3 7889.9 7824.8 7750.0 7715.5 7674.6
6 VERT PRESTR. FORCE AFTER LOSSES - STG1 BOT (t) 0.0 316.7 337.8 320.0 295.4 293.5 266.4 256.6 254.8 231.8 230.2
13 TOTAL HORIZ. PRESTR. FORCE AFTER LOSSES (t) 7602.1 7875.0 7915.8 7961.4 7988.6 7940.3 7889.9 7824.8 7750.0 7715.5 7674.6
14 TOTAL VERT COMPONENT OF PRESTR. AFTER LOSSES (t) 0.0 316.7 337.8 320.0 295.4 293.5 266.4 256.6 254.8 231.8 230.2
15 TOTAL NO OF CABLES 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6 25.6
16 NET ECC FROM BOTTOM (m) 1.475 1.401 1.323 1.243 1.088 0.976 0.869 0.769 0.672 0.576 0.577
SECTION PROPERTIES
35 SOFFIT WIDTH (m) 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900
36 DECK WIDTH (m) 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500
17 WIDTH AT TOP OF CELL (m) 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700 12.700
18 EFF WIDTH OF COMPR FLANGE (m) 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500 20.500
19 WIDTH OF WEB BW (m) 0.610 0.460 0.460 0.460 0.310 0.310 0.310 0.310 0.310 0.310 0.310
20 NO OF WEB 2 2 2 2 2 2 2 2 2 2 2
21 DUCT DIA DDUCT m 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110 0.110
22 EFFECTIVE WIDTHOF WEB (BW-0.5*DDUCT) m 1.110 0.810 0.810 0.810 0.510 0.510 0.510 0.510 0.510 0.510 0.510
23 DECK SLAB THICKNESS m 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230
24 SOFFIT SLAB THICKNESS m 0.400 0.400 0.400 0.400 0.260 0.260 0.260 0.260 0.260 0.260 0.260
23 DEP OF COMPRESSION FLANGE m 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230 0.230
24 Db m 2.720 2.720 2.720 2.720 2.720 2.720 2.720 2.720 2.728 2.824 2.823
25 TOTAL DEPTH OF BOX SECTION FOR SHEAR (m) 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400
26 AREA OF BOX SECTION (m2) 13.739 13.739 12.362 12.362 10.371 10.371 10.371 10.371 10.371 10.371 10.371
27 C.G. OF BOX SECTION FROM BOTTOM (m) 1.990 1.990 2.028 2.028 2.213 2.213 2.213 2.213 2.213 2.213 2.213
28 MOMENT OF INERTIA OF BOX SECTION (m4) 20.576 20.576 19.716 19.716 16.023 16.023 16.023 16.023 16.023 16.023 16.023
29 AY BOX SECTION (m3) 10.340 10.340 9.722 9.722 7.240 7.240 7.240 7.240 7.240 7.240 7.240
30 AREA ENCL C/I OF BOX (Ak) (m2) 29.292 29.523 29.523 29.523 30.430 30.430 30.430 30.430 30.430 30.430 30.430
31 PERIMETER OF Ak (m) 25.160 25.310 25.310 25.310 25.600 25.600 25.600 25.600 25.600 25.600 25.600
S= First Moment of Inertia (m3) 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310 5.310
32 FCK (Mpa) 45 45 45 45 45 45 45 45 45 45 45
104
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
SR SECTION NO. UNITS SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
NO
DISTANCE FROM END SUPPORT 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
33 DUE TO DL (t) 801.8 694.6 629.9 565.3 470.7 383.5 296.3 209.2 122.0 34.9 0.0
55 DUE TO STAGE 2 DL (t) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
34 DUE TO S.I.D.L. (t) 83.9 74.2 68.0 61.9 52.2 42.6 32.9 23.2 13.5 3.9 0.0
35 DUE TO LIVE LOAD (t) 178.0 159.0 147.3 139.6 126.1 116.6 106.5 97.6 87.5 78.7 52.3
36 DUE TO FOOTPATH LIVE LOAD (t) 17.5 15.6 14.5 13.4 11.8 10.3 8.9 7.6 6.4 5.3 12.0
36 DUE TO HYPERSTATIC REACTIONS IMM (t) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL SHEAR (t) 1516.4 1323.9 1207.1 1096.3 929.5 779.0 627.6 478.2 327.0 177.9 160.8
37
Bending Moments
38 DUE TO STAGE1 DL (tm) 2482.7 4727.4 5985.7 7121.1 8675.0 9956.2 10975.9 11734.2 12231.0 12466.3 12487.3
66 DUE TO STAGE 2 DL (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
39 DUE TO S.I.D.L. (tm) 256.7 493.8 628.9 752.3 923.6 1065.8 1179.0 1263.2 1318.3 1344.5 1346.8
40 DUE TO CREEP REDISTRIBUTION OF DL (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
40 DUE TO LIVE LOAD (tm) 516.3 938.1 1149.1 1354.0 1601.7 1830.9 1991.5 2118.8 2161.8 2179.1 1574.3
41 DUE TO FOOTPATH LIVE LOAD (tm) 50.7 92.1 113.0 130.1 149.7 161.3 165.7 163.9 156.8 145.5 4.4
41 HYP IMM (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
42 HYP INF (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
43 DUE TO HYPERSTATIC REACTIONS (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
44 DUE TO CREEP REDISTRIBUTION OF PRESTRESS (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
45 DUE TO DIFFERENTIAL SETTLEMENT (tm) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
46 DESIGN MOMENT (tm) 4634 8759 11035 13111 15902 18238 20059 21419 22242 22618 21582.8
42 ULTIMATE DESIGN MOMENT (tm) 4634 8759 11035 13111 15902 18238 20059 21419 22242 22618 21582.8
484 174 79 -61 -184 -397 -545 -644 -676 -636 -614.8
Fctk0.05/1.5 -156 -156 -156 -156 -156 -156 -156 -156 -156 -156 156.4
105
Ganga Bridge Between Arrah And Chapra P101010
Design of Box Girder Super Structure With Revised Dimensions of Segments (60m Span DN032RA
SR SECTION NO. UNITS SEC#2 SEC#3 SEC#4 SEC#5 SEC#6 SEC#7 SEC#8 SEC#9 SEC#10 SEC#11 SEC#12
NO
DISTANCE FROM END SUPPORT 2.900 5.900 7.800 9.700 12.700 15.700 18.700 21.700 24.700 27.700 28.900
60 Design value of Concrete tensile strength(f ctd = f ct / g m ) (t/m2) 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0 170.0 161.0
61 k1 = 1 for prestressed concrete 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
61 s cp = Mean Compressive strength (t/m2) 553.3 573.2 640.3 644.0 770.3 765.6 760.8 754.5 747.3 744.0 740.0
FCD (t/m2) 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2 2050.2
UNCRACKED SHEAR CAPACITY OF THE SECTION
2 1508.3 1115.6 1116.3 1118.8 615.3 613.8 612.2 610.1 607.7 606.6 404.5
(I * Bw /S * (SQRT (fctd2+ k1* s cp *f ctd )) (t/m )
62
1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
Shear capacity of the cracked section
63 K =(1+sqrt(200/d)),d is in mm. (m) 1.271 1.271 1.271 1.271 1.271 1.271 1.271 1.271 1.271 1.266 2.823
64 r 1 = Min(A sl /b w /d,.02) (m) 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 2.213
(t/m2) 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 2474.4
3/2 (1/2)
65 Vmin = 0.031K f ck
66 V Rd,c 1 (tm) 443.0 329.8 352.0 353.2 248.6 247.7 246.7 245.4 244.5 252.1 16129.8
67 V Rd,c 2 =(V min +.15* s cp )b w *d t 342.2 256.2 278.4 279.6 202.3 201.4 200.3 199.0 198.1 204.1 116.3
68 SHEAR CAPACITY OF THE CRACKED SECTION (VCR) (t) 443 330 352 353 249 248 247 245 245 252 155.9
69 SHEAR CAPACITY OF THE CONCRETE SECTION (t) 1508.3 1115.6 1116.3 1118.8 248.6 247.7 246.7 245.4 244.5 252.1 155.9
70 CRACKED OR UNCRACKED un cr un cr un cr un cr cr cr cr cr cr cr cr
71 V -Vp(ULTIMATE) (CALCULATED ABOVE) (t) 1516.4 1007.3 869.4 776.3 634.1 485.4 361.1 221.5 72.2 0.0 0.0
73 MAX ALLOWABLE SHEAR STRESS ( FOR M 50 GRADE ) T/m2 487 487 487 487 487 487 487 487 487 487 487
75 Ved =(V-Vp) (t) 1516.4 1007.3 869.4 776.3 634.1 485.4 361.1 221.5 72.2 0.0 0.0
a cw = 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3
V Rd,max /(COT(THETA)+TAN(THETA)) (t) 3285.9 2489.4 2586.6 2686.9 1813.5 1900.9 1985.0 2062.9 2139.1 2214.4 2214.1
Theta( q ) 33.7 27.1 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5
V Rd,max (t) 1517.5 1008.5 914.5 950.0 641.2 672.1 701.8 729.3 756.3 782.9 782.8
OK OK OK OK OK OK OK OK OK OK OK
76 ASV/SV (TOTAL) (cm2/m) 151.12 8.89 8.89 8.89 32.64 23.84 16.98 5.99 5.99 5.99 5.99
78 ASV/SV PER WEB (cm2/m) 75.56 4.44 4.44 4.44 16.32 11.92 8.49 2.99 2.99 2.99 2.99
106
Annexure: STAAD Input File for Longitudinal Analysis
STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 17-Jan-11
END JOB INFORMATION
INPUT WIDTH 79
PAGE LENGTH 1000000
UNIT METER MTON
JOINT COORDINATES
28 -0.4 0 0; 1 0 0 0; 2 0.5 0 0; 3 1.1 0 0; 4 2.9 0 0; 5 5.9 0 0; 6 7.8 0 0;
7 9.7 0 0;
8 12.7 0 0; 9 15.7 0 0; 10 18.7 0 0; 11 21.7 0 0; 12 24.7 0 0; 13 27.7 0 0;
14 28.9 0 0; 15 30.1 0 0; 16 33.1 0 0; 17 36.1 0 0; 18 39.1 0 0; 19 42.1 0 0;
20 45.1 0 0; 21 48.1 0 0; 22 50 0 0; 23 51.9 0 0; 24 54.9 0 0; 25 56.7 0 0;
26 57.3 0 0; 27 57.8 0 0; 29 58.2 0 0
MEMBER INCIDENCES
1 1 2; 2 2 3; 3 3 4; 4 4 5; 5 5 6; 6 6 7; 7 7 8; 8 8 9; 9 9 10; 10 10 11;
11 11 12; 12 12 13; 13 13 14; 14 14 15; 15 15 16; 16 16 17; 17 17 18; 18 18 19;
19 19 20; 20 20 21; 21 21 22; 22 22 23; 23 23 24; 24 24 25; 25 25 26; 26 26 27;
27 28 1; 28 27 29;
START GROUP DEFINITION
MEMBER
_BGDIAPHR 27 28 1 26
_BGSUP 2 3 24 25
*_BGSUP1 3 4 23 24
_BG 8 TO 19
END GROUP DEFINITION
DEFINE MATERIAL START
ISOTROPIC MAT1
E 3.41906e+006
POISSON 0.17
DENSITY 2.5
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
_BGDIAPHR PRIS AX 36.507 IX 1e-005 IY 1e-005 IZ 34.440
_BGSUP PRIS AX 13.739 IX 1e-005 IY 1e-005 IZ 20.576
4 23 PRIS AX 13.050 IX 1e-005 IY 1e-005 IZ 20.146
5 6 21 22 PRIS AX 12.362 IX 1e-005 IY 1e-005 IZ 19.716
7 20 PRIS AX 11.3665 IX 1e-005 IY 1e-005 IZ 17.869
_BG PRIS AX 10.371 IX 1e-005 IY 1e-005 IZ 16.023
*MEMBER PROPERTY
*5 PRIS AX 12.849 IX 1e-005 IY 1e-005 IZ 19.97
*22 PRIS AX 12.849 IX 1e-005 IY 1e-005 IZ 19.97
*21 PRIS AX 12.362 IX 1e-005 IY 1e-005 IZ 19.716
*6 PRIS AX 12.362 IX 1e-005 IY 1e-005 IZ 19.716
*7 PRIS AX 12.362 IX 1e-005 IY 1e-005 IZ 19.716
*20 PRIS AX 12.36 IX 1e-005 IY 1e-005 IZ 19.716
CONSTANTS
MATERIAL MAT1 ALL
DEFINE MOVING LOAD
**************************CLASS A LOADING
**************************FORWARD TRAIN
TYPE 1 LOAD 2.7 2.7 11.4 11.4 6.8 6.8 6.8 6.8
DIST 1.1 3.2 1.2 4.3 3 3 3
**************************REVERSE TRAIN
TYPE 2 LOAD 6.8 6.8 6.8 6.8 11.4 11.4 2.7 2.7
DIST 3 3 3 4.3 1.2 3.2 1.1
**************************CLASS 70R LOADING
**************************FORWARD TRAIN
TYPE 3 LOAD 8 12 12 17 17 17 17
DIST 3.96 1.52 2.13 1.37 3.05 1.37
**************************REVERSE TRAIN
TYPE 4 LOAD 17 17 17 17 12 12 8
DIST 1.37 3.05 1.37 2.13 1.52 3.96
SUPPORTS
1 27 PINNED
*LOAD 1 SELF WT
*SELFWEIGHT Y -1
***DIAPHRAGM WT Due to Overhanging Portion
*JOINT LOAD
*1 27 FY -36.51
*LOAD 2 SIDL WEARING COAT
*MEMBER LOAD
**AS per Calculation
*1 TO 26 UNI GY -6.35
**
*LOAD 3 FOOTPATH LIVELOAD 1
*MEMBER LOAD
*1 TO 26 UNI GY -0.67
*LOAD 4 FOOTPATH LIVELOAD 2
*MEMBER LOAD
*2 TO 26 UNI GY -0.67
*LOAD 5 FOOTPATH LIVELOAD 3
*MEMBER LOAD
*3 TO 26 UNI GY -0.67
*LOAD 6 FOOTPATH LIVELOAD 4
*MEMBER LOAD
*4 TO 26 UNI GY -0.67
*LOAD 7 FOOTPATH LIVELOAD 5
*MEMBER LOAD
*5 TO 26 UNI GY -0.67
*LOAD 8 FOOTPATH LIVELOAD 6
*MEMBER LOAD
*6 TO 26 UNI GY -0.67
*LOAD 9 FOOTPATH LIVELOAD 7
*MEMBER LOAD
*7 TO 26 UNI GY -0.67
*LOAD 10 FOOTPATH LIVELOAD 8
*MEMBER LOAD
*8 TO 26 UNI GY -0.67
*LOAD 11 FOOTPATH LIVELOAD 9
*MEMBER LOAD
*9 TO 26 UNI GY -0.67
*LOAD 12 FOOTPATH LIVELOAD 10
*MEMBER LOAD
*10 TO 26 UNI GY -0.67
*LOAD 13 FOOTPATH LIVELOAD 11
*MEMBER LOAD
*11 TO 26 UNI GY -0.67
*LOAD 14 FOOTPATH LIVELOAD 12
*MEMBER LOAD
*12 TO 26 UNI GY -0.67
*LOAD 15 FOOTPATH LIVELOAD 13
*MEMBER LOAD
*13 TO 26 UNI GY -0.67
************************CLASS A FORWARD TRAIN
LOAD GENERATION 200
TYPE 1 -18.8 0 0 XINC 0.4
****************************CLASS A REVERSE TRAIN
LOAD GENERATION 200
TYPE 2 -18.8 0 0 XINC 0.4
***********************CLASS 70R FORWARD TRAIN
LOAD GENERATION 200
TYPE 3 -13.4 0 0 XINC 0.4
***************************CLASS 70R REVERSE TRAIN
LOAD GENERATION 200
TYPE 4 -13.4 0 0 XINC 0.4
PERFORM ANALYSIS
PRINT MEMBER FORCES LIST 1 TO 12