Sunteți pe pagina 1din 3

RF-650 Issue 2012.06.

12/02
Rock Fall Co. Ltd Drill Log
SHE-Q system

Section 37.5 Sub Grade 2 Row No. 97.5


No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No
4 5 6 7 8 9
1 Sea Bed level (m-)
2 Casings (m) 17 17 17 17 17 17
3 ADL + BC +Tide 3.4 3.4 3.4 3.4 3.4 3.4 0 0 0 0 0 0
4 Rock Level (m-) 13.6 13.6 13.6 13.6 13.6 13.6 0 0 0 0 0 0
5 Design level (m-) 13.6 13.6 13.6 13.6 13.6 13.6
6 Paid Rock (m) 0 0 0 0 0 0 0 0 0 0 0 0
7 Total Drilling (m) 2 2 2 2 2 2 2 2 2 2 2 2
8 Sub Grade 2 2 2 2 2 2 2 2 2 2 2 2
8 Charge (Kgs) 10 10 10 10 10 10
Total Detonators this sheet 6 Total Charge this sheet 60 kgs
9 Det Delay No 1 2 3 4 5 6
10 Calculation Item 3
Barge Constant (m) 1.8 1.8 1.8 1.8 1.8 1.8
Tide (m) 1.1 1 1.1 1 1.1 1
ADL (m) 0.5 0.6 0.5 0.6 0.5 0.6
Total (item 3) 3.4 3.4 3.4 3.4 3.4 3.4 0 0 0 0 0 0
11 Blast Details Max Charge/Delay kgs Fired At Hrs
Total Charge kgs Blast No Total Detonators in Blast
Remarks

Client Signature (if required) Date Thu 23-May-13 Drill Area Barge Seacow 173 Drill Log No 1

Shift night Section Contract Antofagasta, Chile Supervisor IL/CT


RF-650 Issue 2012.06.12/02
Rock Fall Co. Ltd Drill Log
SHE-Q system

Section 37.5 Sub Grade 2 Row No. 100


No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No
2 3 4 5 6 7 8 9
1 Sea Bed level (m-)
2 Casings (m) 16 16 16 16 16 16 16 16
3 ADL + BC +Tide 2.4 2.4 2.45 2.4 2.4 2.4 2.4 2.6 0 0 0 0
4 Rock Level (m-) 13.6 13.6 13.55 13.6 13.6 13.6 13.6 13.4 0 0 0 0
5 Design level (m-) 13.6 13.6 13.6 13.6 13.6 13.6 13.6 13.6
6 Paid Rock (m) 0 0 0.05 0 0 0 0 0.2 0 0 0 0
7 Total Drilling (m) 2 2 2.05 2 2 2 2 2.2 2 2 2 2
8 Sub Grade 2 2 2 2 2 2 2 2 2 2 2 2
8 Charge (Kgs) 10 10 10 10 10 10 10 11
Total Detonators this sheet 8 Total Charge this sheet 81 kgs
9 Det Delay No 7 8 9 10 11 12 13 14
10 Calculation Item 3
Barge Constant (m) 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8
Tide (m) 0.5 0.2 0.25 0.3 0.3 0.3 0.3 0.5
ADL (m) 0.1 0.4 0.4 0.3 0.3 0.3 0.3 0.3
Total (item 3) 2.4 2.4 2.45 2.4 2.4 2.4 2.4 2.6 0 0 0 0
11 Blast Details Max Charge/Delay kgs Fired At Hrs
Total Charge kgs Blast No Total Detonators in Blast
Remarks

Client Signature (if required) Date Thu 23-May-13 Drill Area Barge Seacow 173 Drill Log No 2

Shift night Section Contract Antofagasta, Chile Supervisor IL/CT


RF-650 Issue 2012.06.12/02
Rock Fall Co. Ltd Drill Log
SHE-Q system

Section 37.5 Sub Grade 2 Row No. 102.5


No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No Hole No
2 3 4 5 6 7 8 9
1 Sea Bed level (m-)
2 Casings (m) 16 16 16 16 16 16 16 16
3 ADL + BC +Tide 2.4 2.4 2.4 2.4 2.5 2.5 2.7 2.8 0 0 0 0
4 Rock Level (m-) 13.6 13.6 13.6 13.6 13.5 13.5 13.3 13.2 0 0 0 0
5 Design level (m-) 13.6 13.6 13.6 13.6 13.6 13.6 13.6 13.6
6 Paid Rock (m) 0 0 0 0 0.1 0.1 0.3 0.4 0 0 0 0
7 Total Drilling (m) 2 2 2 2 2.1 2.1 2.3 2.4 2 2 2 2
8 Sub Grade 2 2 2 2 2 2 2 2 2 2 2 2
8 Charge (Kgs) 11 11 11 11 11 11 11 11
Total Detonators this sheet 10 Total Charge this sheet 88 kgs
9 Det Delay No 15 16 17 18 19 20 21 22
10 Calculation Item 3
Barge Constant (m) 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8
Tide (m) 0.6 0.5 0.5 0.4 0.4 0.5 0.5 0.6
ADL (m) 0 0.1 0.1 0.2 0.3 0.2 0.4 0.4
Total (item 3) 2.4 2.4 2.4 2.4 2.5 2.5 2.7 2.8 0 0 0 0
11 Blast Details Max Charge/Delay 11 kgs Fired At 10.08 Hrs
Total Charge 229 kgs Blast No 1 Total Detonators in Blast 25
Remarks

Client Signature (if required) Date Thu 23-May-13 Drill Area Barge Seacow 173 Drill Log No 3

Shift Night Section Contract Antofagasta, Chile Supervisor IL/CT