Green Highlighted Red font Items in the below will be evaluated and confirmed during Kick-Off

Meeting including Cost Impact.

1. Pre-Engineering Survey

1.1 Soil Investigation

1.1.1 Mooring Facilities

1) Exploratory Boring 10 Holes, Penetration Depth 40m

2) Cone Penetration Test (CPT) TBD

3) Standard Penetration Test and Samples 260 times, 1.5m interval

4) Undisturbed Samples 8 times

1.1.2 Lab Test

1) Grain Size distribution by sieve analysis 8 Times

2) Wet and Dry Density TBD

3) Moisture Content Test TBD

4) Consolidation Test for Shore Protection only TBD

5) Direct Shear Test excluding Sand Layer TBD

6) Consolidation Drain Direct Shear Test TBD

7) Consolidation Undrain Direct Shear Test TBD

8) Lab CBR Test TBD

9) Atterberg Limits 8 Times

10) Specific Gravity Test 8 Times

11) Unconfined Compression Test 8 Times

12) Unconsolidated Un-drained Tri-axial Test 8 Times

1.2 Hydrology Test

1.2.1 Erosion Potential Test TBD


1.3 Chemical Analysis of Soil

1.3.1 pH Value TBD

1.3.2 Electric Conductivity TBD

1.3.3 Chloride and Sulphate Content TBD

1.3.4 Electrical Resistivity of Soil TBD

1.3.5 Thermal Resistivity of Soil TBD

1.4 Geophysical Survery

1.4.1 Bathymetry Survey 2.0Km * 1.5Km

1.4.2 Sub Bottom Profiler

1.4.3 Side Scan Sonar

1.5 Metocean Survey

1.5.1 Observation

1) Tide During One (1) months

2) Current During One (1) months

3) Wave During One (1) months

Rainfall, Wind, Temperature,


4) Meteorological Data (Historical Data)
Humidity, Thunder Storm

1.5.2 Numerical Analysis

Monsoon and Cyclone Season

1) Wave Height, Period and Wave Spectrum Wave Scatter Table

Wave Vector Plot

Monsson and Cyclone Season

Current Vector Plot


2) Current (Hydrodynamic Modelling)
Current Profile

Current Velocity for Mean, Seabed


and Surface
3) Sea-level Rise
Monsoon and Cyclone Season
4) Storm Surge and Tide

5) Joint Probability for Wave and Current

6) Joint Probability for Storm Surge and Tide