Preliminary Foreword
Distribution List
Amendment Summary
Definition
Reference Documents
Section 1 Introduction
Section 2 Roles and Responsibilities
Section 3 Portable Electrical Equipment
Section 4 Pre-mobilization Inspection
Section 5 Temporary Electrical Installation Certification
Section 6 Document Management and Control
Section 7 Audit
DISTRIBUTION LIST
AMENDMENT SUMMARY
This sheet must be completed in detail at each revision once this document has been
approved.
Details must include revision number, description and indication of which pages and
paragraphs have been revised, date of revision approval, approvers title and
signature.
Approver
Rev Description Date Signature
Title
Notes:
(1) Document Holders to update Amendment Record as and when
amendments/new revisions are received.
(2) For description of amendment the Document Holder should indicate correction,
modification, update or deletion issue.
(3) Document Holder to enter their company reference number, sign and date the
record of entry.
(4) Where part amendments are issued, the relevant page(s) will be identified with
a lower case letter in the revision status line in the header.
The abbreviations, acronyms and definitions used in this document shall have the following
meaning:
Authorized Competent For the purpose of this guideline, ACP is defined as the
person registered with Energy Commission or
Person (ACP) equivalentlocal authority of host countryand authorised by
Management. He has sufficient technical knowledge and
experience to enable him to avoid danger and who can
have authority delegated to him, according to his
knowledge and experience to carry out operations in
power systems and work on electrical equipment. He has
the authority to issue and cancel Electrical Isolation
Certificate and Limit of Electrical Access on Electrical
Equipment/System.
Class IIB
Equipment that is "double-insulated". It has not only the
normal basic insulation necessary for its proper
functioning but also a supplementary insulation for
safeguarding against shock if the basic insulation
breaks down. In cases where there is not enough
space for separate insulation, a single "reinforced"
insulation electrically equivalent to double insulation
may sometimes be accepted.
Class III Equipment designed for connection only to Extra Low
Voltage (ELV). This means a voltage not more than 50V
AC, but in practice limited to 42V. The main supply is
obtained by means of a safety isolating transformer. No
earth connection is provided.
Company Refers to PETRONAS CarigaliSdn Bhd.
Confined conductive Confined spaces where it is likely that a person will be in
spaces contact with conductive parts at two or more points
simultaneously. Example of Confined conductive spaces
such as in boiler, vats, tanks(inclusive above floating roof
tank), pits, pipes, ducts, flues, chimneys, silos, containers,
pressure vessels, underground sewers, wet or dry wells,
shafts, trenches, tunnelsor other similar enclosed or
partially enclosed structures,
Equipment Checklist The checklists consist of key inspection elements for a
particular type of equipment.
Ex Equipment Equipment that is certified for used in hazardous classified
area equipment.
Extra Low Voltage (ELV) A system which is not exceeding 50Vr.m.sor below 120V
DC, whether between conductors or to earth.
to be used.
Portableelectrical Portable electricalequipment iseither hand held or non-
equipment hand held equipment. For hand held, the equipment grasp
in hand during normal use.
Reduced Low Voltage A system in which the nominal phase-to-phase voltage
System (RVS) does not exceed 110 volts and the nominal phase to earth
voltage does not exceed 63.5 volts.
Safety-Extra Low An extra-low voltage system which is electrically separated
Voltage (SELV) from earth and from other systems that a single fault cannot
give rise to the risk of electric shock, in accordance to IEC
60742 (SELV System).
Temporary Electrical Temporary Electrical Installation in the context of this
Installation guideline is installation that do not form part of the plants
permanent or fixed installation.
Examples of Temporary Electrical Installation are
temporary generator, distribution board, pumps, welding
machine and electric air compressor.
TN-S A power distribution system havingseparate neutral and
protective earth conductors throughoutthe system.
Work Leader Person who is responsible to lead or carry out the
electricalwork execution at site.
REFERENCE DOCUMENTS
SECTION 1
INTRODUCTION
Contents
1 INTRODUCTION 2
1.1 Purpose 2
1.2 Scope 2
1 INTRODUCTION
1.1 Purpose
This guideline defines the requirements for portable
electrical equipment and temporary installation with regards
to proper selection of equipment and tool, inspection prior
to mobilization to worksite, site certification and periodic
inspection/recertification throughout the duration of the
equipment being used at worksite. The requirements are
specified as below:
1.2 Scope
SECTION 2
Contents
(2) Issue Fit For Use tag (GREEN tag) for equipment
that passed the inspection; and
SECTION 3
Contents
Location
Item Class Voltage Phase Domestic
Industrial Restrictive
Special Provisions Office
Construction Conductive
Commercial
Site Location
Hand lamp III 25V 1 Safety isolating transformer Yes Yes Yes
III 50V 1 Safety isolating transformer Yes Yes Yes
II 110V 1 Safety isolating transformer Yes Yes No
I 240V 1 10mA RCB/ELCB protection Yes Note1 No
Hand held III 25V 1 Safety isolating transformer Yes Yes Yes
power tool
III 50V 1 Safety isolating transformer Yes Yes Yes
II 110V 1 Double wound transformer ; Yes Yes Yes
secondary center point
earthed
II 240V 1 10mA RCB/ELCB protection Yes Note 1 No
Fixed power tool II or I 110V 1 Double wound transformer ; Yes Yes Yes
secondary center point
earthed
II or I 240V 1 10 mA RCB/ELCB protection Yes Note 1 No
Moving power II or I 110V 1 Double wound transformer ; Yes Yes Yes
tool secondary center point
earthed
II or I 240V 1 10mA RCB/ELCB protection Yes Note 1 No
Mobile Lighting 110V 1 Double wound transformer ; Yes Yes Yes
secondary center point
earthed
240V 1 10mA RCB/ELCB protection Yes Note 1 No
Fixed lighting 110V 1 Double wound transformer ; Yes Yes Yes
secondary center point
earthed
240V 1 10mA RCB/ELCB protection Yes Yes No
Small mobile equipment 110V 3 Double wound transformer ; Yes Yes Yes
up to 3.75kW secondary center point
earthed
400/48 3 100mA RCB/ELCB protection Yes Note 1 No
0V
Small fix equipment up 110V 3 Double wound transformer ; Yes Yes No
Main requirements
Circuit Arrangement
Design
Component Selection
1.2.2.3 Earthing
(b) Zone 2- Ex d, Ex e, Ex n.
(iii) Ex n Alternator;
SECTION 4
PRE-MOBILISATION INSPECTION
Contents
1 PRE-MOBILISATION INSPECTION 2
1 PRE-MOBILISATION INSPECTION
Start
No
Acceptable? Issue Do Not Use Tag (RED Tag)
Yes
SECTION 5
Contents
(4) For hand held equipment that did not pass the
inspection, a Reject Tag (RED tag) shall be affixed on
the equipment. Sample of the Reject Tag (RED tag)is
as in Appendix 12.
(7) The sticker is valid for two (2) weeks; upon the expiry
of the sticker, a re-inspection shall be carried out
following the process described in (1) to (3) above.
(8) The process flow for the onsite inspection for hand
held equipment is as below.
Start
No
Acceptable? Issue Reject Tag (RED tag)
Yes
End
(2) Only equipment that possessed the Fit for Use Tag
shall be installed.
(7) For equipment that did not pass the inspection, notify
Work Leader for rectification/replacement. A Reject
Tag (RED tag) shall be affixed on the equipment until
it has been rectified or replaced. Sample of the Reject
Tag (RED tag) is as in Appendix 12.
(10) For equipment that did not pass the inspection, the
PCF shall not be issued and the Work Leader shall be
notified for rectification / replacement.
(15) The Top Copy of the PCF shall be kept in the CCR
while the 2nd copy shall be displayed at worksite.
(16) The PCF is valid for one month; upon the expiry of the
sticker, a re-inspection shall be carried out following
the process described in (2) to (14) above.
Acceptable?
NO
YES
Issue Temporary Electrical InstallationTag (BLUE tag)
NO
YES
Tag/Certificate Validity
SECTION 6
Contents
SECTION 7
AUDIT
Contents
1 AUDIT 2
1 AUDIT
APPENDIXES
Contents
7 Inspection Checklist A7 1
APPENDIX 1
Plug Plug
Equipment cable
(max. 2m)
APPENDIX 2
SAFE LOCATION
Source of Supply
(Substation/Mobile Generator)
max/3PH
X MCCB 355A
(3PH+N+E)
ELCB 30mA
X MCB
Single Load
(Direct/Plugged In)
ELCB ELCB (10mA PH+N)
LOAD LOAD
Load
(Plugged in)
APPENDIX 3
Terminal Box
EF
Power cable
R R to consumer
OC
(with size S)
Y OC
Y
B B
OC
PE cable to
consumer
N N
LIN
K
Frame Earthing
E
(25mm2 or S/2,
whichever is
bigger)
Earth cable to
ground electrode
APPENDIX 4
P ELCB (10mA)
H
MCB
Wire Socket
outlet
(16A, 240V)
Minimum N
Safety
Earthing P
E
10mm2
Generator
Frame
APPENDIX 5
Plug (3PH+N+E)
Non-Ex
Current (A) Min. Cable Size (mm2)
125 35
63 16
32 10
ELCB
ELCB 16A
X X X X X X (10mA)
PH+N
2P
ELCB ELCB ELCB ELCB ELCB ELCB (10mA)
(PH+N)
Frame Earthing
(25mm2 or S/2, whichever is
bigger) Ex or non Ex type flange
mountedsocket outlets (16A)
subject to requirement and
hazard permit
APPENDIX 6
Supply
socket
outlet
Coupler
(optional, max 1
coupler)
Loads
Load may or may not be Ex-rated, subject to requirements and hazard permits
APPENDIX 7
INSPECTION CHECKLIST
EQUIPMENT CHECKLIST C1
Functional Tests
C. General Remark :
Name Department
Signature Date
The list is minimum requirement of items that need to be verified.
Authorised Inspector (pre-mobilisation) or AP/ACP (onsite inspection) shall accordingly add other
checklist items that are necessary according to his/her own judgments in order to ensure the
equipment safety.
EQUIPMENT CHECKLIST C2
Radiator Condition
General Remark :
C.
EQUIPMENT CHECKLIST C3
OWNER : LOCATION :
EX Marking
Guards
Functional Tests
IP Rating
Others (please
specify)
C. General Remark :
EQUIPMENT CHECKLIST C4
OWNER : LOCATION :
Voltage Rating
Functional Tests
Cover
Burnt Mark
C. General Remark :
EQUIPMENT CHECKLIST C5
OWNER : LOCATION :
Cable
MCCB/MCB
Termination
Earthing
Enclosure/Cover/Seal/Gasket
Glanding
Voltmeter / Ammeter
Ex Compliance
C General Remark :
EQUIPMENT CHECKLIST C6
OWNER : LOCATION :
Maintenances Log
C General Remark :
EQUIPMENT CHECKLIST C8
OWNER : LOCATION :
C General Remark :
PETI CHECKLIST 9
AP/ACP shall accordingly add other checklist items that are necessary according to his/her
own judgments in order to ensure the equipment safety.
APPENDIX 8
EQUIPMENT ID
Signature Date
17cm
7 cm
APPENDIX 9
EQUIPMENT ID
Inspected by Dept
Signature Date
17 cm
7 cm
APPENDIX 10
PART A
Requestor's Name:
Designation:
Company:
Section/Department:
Part D
Inspected by:
Section/Department:
Date:
Signature:
PART A, B filled by work leader/requestor
PART C, D by AP/ACP
APPENDIX 11
3.5cm
7cm
APPENDIX 12
Inspected by Date
7cm
m
APPENDIX 13
10.5cm
17cm
APPENDIX 15
APPENDIX 16
Issuance Expiry Date PCF No. Work Description Equipment Name of AP/ACP
Date