Monthly Check list for AHU

Location :_________________
AHU No. :________

Sl. No Description Yes No Period Remarks/Observation


1 Isolate the incoming source and apply LOTO. F/Q
Make sure that supply is not available at the i/p terminal of the
2 F/Q
equipment
3 Ensure all Indication lamps are glowing Q
Check for any cable colour change at contactors / connectors /
4 Q
isolators etc and attend if so.
5 Check and Tight all the Electrical connections Q
6 Check the AHU running in "VFD" mode and "BYPASS" Mode.
Q
7 Check the Motor body double earthing Q
8 Check the Motor terminal and log the Winding Resistance Q
9 Ensure the AHU inside lights are working if not correct it Q
Check and Ensure the AHU should stop opening the door while
10
running if not check the limit switch operation. Q
Check the Heating Element and Heater circuit. Log the heater
11
Load current Q
12 Clean the control panel and Isolator switch with blower. Q
Load Current
13 Log motor load current (max) ,KWH Reading and Run hours KWH Reading
Q Run Hours
14 Check blower V-belt tension . Q
15 Ensure all valves are easy to operating if not lubricate the valve Q
16 Clean condensate drain pan and free from dust. Q
17 Check the tightness of Motor and Blower base bolts. Q
18 Clean filter with water and dry properly. M
19 Check the Actuator properly working Q
Check and log the "T" across the cooling coil and Return Air
20
Temperature, canvass Temperature. Q
21 Check and Log the Balancing Valve position Q
Check and Ensure the Pressure gauges and Temperature
22
sensors are properly working Q
Done by : Spares used

Signature:

PM done On : Next PM due on :

Start Time :

End time :