INPUT PARAMETERS OUTPUT

Bering
BORE DEPTH Unit
capacity B(m) L(m) Z(m) I
HOLE NO (m) Weight
(t/m2)

1&2 1.5 1.67 3.89 1 1 1 0.25


1&2 1.5 3.68 1.5 1.5 1.5 0.25
1&2 1.5 Square 3.51 2 2 2 0.25
footing
1&2 1.5 3.41 2.5 2.5 2.5 0.25
1&2 1.5 3.34 3 3 3 0.25
1&2 1.5 2.99 1 5 1 0.42
1&2 1.5 2.76 1.5 7.5 1.5 0.42
1&2 1.5 Strip 2.65 2 10 2 0.42
footing
1&2 1.5 2.58 2.5 12.5 2.5 0.42
1&2 1.5 2.53 3 15 3 0.42
1&2 1.5 7.05 5 5 5 0.25
1&2 1.5 Raft 7.45 7.5 7.5 7.5 0.25
1&2 1.5 footing 10 10 10 0.25
1&2 1.5 12 12 12 0.25
1&2 2 1 1 1 0.25
1&2 2 1.5 1.5 1.5 0.25
1&2 2 Square 2 2 2 0.25
footing
1&2 2 2.5 2.5 2.5 0.25
1&2 2 3 3 3 0.25
1&2 2 1 5 1 0.42
1&2 2 1.5 7.5 1.5 0.42
1&2 2 Strip 2 10 2 0.42
footing
1&2 2 2.5 12.5 2.5 0.42
1&2 2 3 15 3 0.42
1&2 2 5 5 5 0.25
1&2 2 Raft 7.5 7.5 7.5 0.25
1&2 2 footing 10 10 10 0.25
1&2 2 12 12 12 0.25
1&2 2.5 1 1 1 0.25
1&2 2.5 1.5 1.5 1.5 0.25
1&2 2.5 Square 2 2 2 0.25
footing
1&2 2.5 2.5 2.5 2.5 0.25
1&2 2.5 3 3 3 0.25
1&2 2.5 1 5 1 0.42
1&2 2.5 1.5 7.5 1.5 0.42
1&2 2.5 Strip 2 10 2 0.42
footing
1&2 2.5 2.5 12.5 2.5 0.42
1&2 2.5 3 15 3 0.42
1&2 2.5 5 5 5 0.25
1&2 2.5 Raft 7.5 7.5 7.5 0.25
1&2 2.5 footing 10 10 10 0.25
Raft
footing
1&2 2.5 12 12 12 0.25
OUTPUT IMMEDIATE SETTLEMENT CONSOLIDATION SETTLEMENT
(OC by mv) (mm)

Modulus Immediate
Pressure
z WIDTH or Influence Poission's of Settlement mv (m2/t) Pressure
increment
DIA (m) Factor (I) ratio elasticity (mm) Si (t/m2)
(t/m )
2
(t/m )
2

0.97 0.97 1 1.12 0.4 620 5.91 0.00161 0.97


0.92 0.92 1.5 1.12 0.4 620 8.38 0.00161 0.92
0.88 0.88 2 1.12 0.4 620 10.65 0.00161 0.88
0.85 0.85 2.5 1.12 0.4 620 12.94 0.00161 0.85
0.84 0.84 3 1.12 0.4 620 15.20 0.00161 0.84
1.25 1.25 1 2.1 0.4 620 8.52 0.00161 1.25
1.15 1.15 1.5 2.1 0.4 620 11.79 0.00161 1.15
1.10 1.10 2 2.1 0.4 620 15.07 0.00161 1.10
1.07 1.07 2.5 2.1 0.4 620 18.34 0.00161 1.07
1.06 1.06 3 2.1 0.4 620 21.62 0.00161 1.06
1.76 1.76 5 1.12 0.5 2326 12.73 0.00043 1.76
1.86 1.86 7.5 1.12 0.5 2326 20.18 0.00043 1.86
0.00 0.00 10 1.12 0.5 4600 0.00 0.000217 0.00
0.00 0.00 12 1.12 0.5 4600 0.00 0.000217 0.00
0.00 0.00 1 1.12 0.4 3750 0.00 0.000267 0.00
0.00 0.00 1.5 1.12 0.4 4033 0.00 0.000248 0.00
0.00 0.00 2 1.12 0.4 4317 0.00 0.000232 0.00
0.00 0.00 2.5 1.12 0.4 4600 0.00 0.000217 0.00
0.00 0.00 3 1.12 0.4 4600 0.00 0.000217 0.00
0.00 0.00 1 2.1 0.4 3750 0.00 0.000267 0.00
0.00 0.00 1.5 2.1 0.4 4033 0.00 0.000248 0.00
0.00 0.00 2 2.1 0.4 4317 0.00 0.000232 0.00
0.00 0.00 2.5 2.1 0.4 4600 0.00 0.000217 0.00
0.00 0.00 3 2.1 0.4 4600 0.00 0.000217 0.00
0.00 0.00 5 1.12 0.4 4600 0.00 0.000217 0.00
0.00 0.00 7.5 1.12 0.4 4600 0.00 0.000217 0.00
0.00 0.00 10 1.12 0.4 4600 0.00 0.000217 0.00
0.00 0.00 12 1.12 0.4 4600 0.00 0.000217 0.00
0.00 0.00 1 1.12 0.4 4033 0.00 0.000248 0.00
0.00 0.00 1.5 1.12 0.4 4317 0.00 0.000232 0.00
0.00 0.00 2 1.12 0.4 4600 0.00 0.000217 0.00
0.00 0.00 2.5 1.12 0.4 4600 0.00 0.000217 0.00
0.00 0.00 3 1.12 0.4 4600 0.00 0.000217 0.00
0.00 0.00 1 2.1 0.4 4033 0.00 0.000248 0.00
0.00 0.00 1.5 2.1 0.4 4317 0.00 0.000232 0.00
0.00 0.00 2 2.1 0.4 4600 0.00 0.000217 0.00
0.00 0.00 2.5 2.1 0.4 4600 0.00 0.000217 0.00
0.00 0.00 3 2.1 0.4 4600 0.00 0.000217 0.00
0.00 0.00 5 1.12 0.4 4600 0.00 0.000217 0.00
0.00 0.00 7.5 1.12 0.4 4600 0.00 0.000217 0.00
0.00 0.00 10 1.12 0.4 4600 0.00 0.000217 0.00
0.00 0.00 12 1.12 0.4 4600 0.00 0.000217 0.00
Total
SOLIDATION SETTLEMENT settlement
(OC by mv) (mm) (mm)

Consolidati POSITION OF
DEPTH OF WIDTH OF
on THE
Thickness( THE THE
settlement S REMARKS FOUNDATION
m) FOUNDATION FOUNDATION
(sc) PRESSURE BULB
(D)(m) (B) (m)
(BELOW GL) (m)

2 3.14 9.04 SAFE 1.5 1 2.5


3 4.45 12.83 SAFE 1.5 1.5 3
4 5.66 16.31 SAFE 1.5 2 3.5
5 6.88 19.81 SAFE 1.5 2.5 4
6 8.08 23.29 SAFE 1.5 3 4.5
2 4.02 12.54 SAFE 1.5 1 2.5
3 5.57 17.36 SAFE 1.5 1.5 3
4 7.12 22.19 SAFE 1.5 2 3.5
5 8.67 27.01 SAFE 1.5 2.5 4
6 10.21 31.83 SAFE 1.5 3 4.5
10 7.58 20.32 SAFE 1.5 5 6.5
15 12.01 32.20 SAFE 1.5 7.5 9
20 0.00 0.00 SAFE 1.5 10 11.5
24 0.00 0.00 SAFE 1.5 12 13.5
2 0.00 0.00 SAFE 2 1 3
3 0.00 0.00 SAFE 2 1.5 3.5
4 0.00 0.00 SAFE 2 2 4
5 0.00 0.00 SAFE 2 2.5 4.5
6 0.00 0.00 SAFE 2 3 5
2 0.00 0.00 SAFE 2 1 3
3 0.00 0.00 SAFE 2 1.5 3.5
4 0.00 0.00 SAFE 2 2 4
5 0.00 0.00 SAFE 2 2.5 4.5
6 0.00 0.00 SAFE 2 3 5
10 0.00 0.00 SAFE 2 5 7
15 0.00 0.00 SAFE 2 7.5 9.5
20 0.00 0.00 SAFE 2 10 12
24 0.00 0.00 SAFE 2 12 14
2 0.00 0.00 SAFE 2.5 1 3.5
3 0.00 0.00 SAFE 2.5 1.5 4
4 0.00 0.00 SAFE 2.5 2 4.5
5 0.00 0.00 SAFE 2.5 2.5 5
6 0.00 0.00 SAFE 2.5 3 5.5
2 0.00 0.00 SAFE 2.5 1 3.5
3 0.00 0.00 SAFE 2.5 1.5 4
4 0.00 0.00 SAFE 2.5 2 4.5
5 0.00 0.00 SAFE 2.5 2.5 5
6 0.00 0.00 SAFE 2.5 3 5.5
10 0.00 0.00 SAFE 2.5 5 7.5
15 0.00 0.00 SAFE 2.5 7.5 10
20 0.00 0.00 SAFE 2.5 10 12.5
24 0.00 0.00 SAFE 2.5 12 14.5
DEPTH DEPTH DEPTH
1.5 3 4.5
(m) (m) (m)

INTERPOLATED
MODULUS OF Modulus Modulus Modulus
ELASTICITY AT of of of
3125 3750 4600
MIDDLE OF THE elasticity elasticity elasticity
PRESSURE (t/m2) (t/m2) (t/m2)
BULB(t/m2)
3542
3750
4033
4317
4600
3542
3750
4033
4317
4600
4600
4600
4600
4600
3750
4033
4317
4600
4600
3750
4033
4317
4600
4600
4600
4600
4600
4600
4033
4317
4600
4600
4600
4033
4317
4600
4600
4600
4600
4600
4600
4600
Decide
Type of Consolidation (NC) Normaly Consolida
Over Consolidated
(OC)-1

(OC)-2

Test for Consolidation State

Layer-1
Layer-1

Layer-2

Layer-3

Layer-4

Layer-5
Net Safe Mid-Depth
Bearing of Unit
Capacity Influence Weight
Layer Depth (m) Width (m) Length (m) (t/m2) (m) (t/m3)
Df B Length Z
Layer-1 1.5 1 1 3.89 1 1.67

Layer-2

Layer-3

Layer-4

Layer-5
Normaly Consolida
'c <'0<('0+'
If 'eff.avg=) Present Effective Vertical Stress Consolidation Settlement (Sc)

Over Consolidated
'c = Effective Pre-consolidation Pressure Sc (NC)= (CC * Hc)/(1+e0)*Log(('0
If (' +' )<' (Cs * Hc)/(1+e0)*Log(('0+
Condition 0 avg c Sc (OC-1)=
'0 = Average effective vertical stress before construction
If ' <' <(' +' ) (Cs * Hc)/(1+e0)*Log('c/
Condition 0 c 0 avg Sc (OC-2)=

'avg= Average increase in effective vertical sHc=Thickness of the clay Layer


e0 = Initial void ratio of the clay layer
Cc= Compression Index, C

Over Consolidation Ratio (OCR)=


14.9254 <2 Hence it is not the case of NC Soil
>2 Hence OC Soil
Cv T90
Test for OC-1 2.6475 >'c Hence not in OC-1
Test for OC- 'c< 2.6475 Hence in OC-2

Over Consolidation Ratio (OCR)=


#DIV/0! <2 Hence the Soil is NC Soil Cv T90
>2 Hence OC Soil

Test for OC-1 0 >'c Hence not in OC-1


Test for OC- 'c< 0 Hence in OC-2

Over Consolidation Ratio (OCR)=


#DIV/0! <2 Hence the Soil is NC Soil Cv T90
>2 Hence OC Soil

Test for OC-1 0 >'c Hence not in OC-1


Test for OC- 'c< 0 Hence in OC-2

Over Consolidation Ratio (OCR)=


#DIV/0! <2 Hence the Soil is NC Soil Cv T90
>2 Hence OC Soil

Test for OC-1 0 >'c Hence not in OC-1


Test for OC- 'c< 0 Hence in OC-2

Over Consolidation Ratio (OCR)=


#DIV/0! <2 Hence the Soil is NC Soil Cv T90
>2 Hence OC Soil

Test for OC-1 0 >'c Hence not in OC-1


Test for OC- 'c< 0 Hence in OC-2
Avg.
Submerg Pre- initial eff.
ed Unit Normal Initial Thicknes Compr consolidation Vertical
Weight Moisture Sp. Degree of Void s of clay ession Swelling Pressure stress
(t/m3) Content Gravity Saturation Ratio layer (m) Index Index (t/m2) (t/m2)
' G Sr e0 Hc Cc Cs 'c '0
0.67 0.253 2.62 1 0.663 2 0.12 0.0315 25 1.675
olidation Settlement (Sc)=
(CC * Hc)/(1+e0)*Log(('0+'avg)/'0)
(Cs * Hc)/(1+e0)*Log(('0+'avg)/'0)

(Cs * Hc)/(1+e0)*Log('c/'0) + (CC * Hc)/(1+e0)*Log(('0+'avg)/'c)

s of the clay Layer


d ratio of the clay layer
ssion Index, Cs= Swelling Index

T50 Sc

T50 Sc

T50 Sc

T50 Sc

T50 Sc

OUTPUT
Prese
nt eff.
Vertic
Increase in al Consolidation
eff. Vertical stress Settlement Sc
stress(t/m2) (t/m2) S (OC-1)
(OC-2)
c

'avg 'eff. (mm)


0.9725 1.675
### 33.8