Sunteți pe pagina 1din 2
51.2, AIR CONDITIONING: 01. | Area to be air-conditioned Control room 02. | Location of A/c. plant In the ground floor as shown in the drawing . 03. | Ambient temperature 42 degree C to 45 C 04, | Inside room temperature to be | As per control panel requirement maintained. 09. | Roof 12.5mm Gypsm Board False ceiling and uncer deck insulation with thermo cool sheets shall be provided by supplier. 10. | Exposed Glass Veratian binds shall be provided by the supplier. 11. | Type of Cooler. Dry Type. 12. | General The air-conditioning shall be designed with package units only. The air-conditioning system should be complete with compressors, evaporator, condenser air handling fan, blowers, filters, cooling coil, refrigerant piping motor, control switches, vibration isolator, first charge, humidifier assembly hearing 358, 13. General coil, supply air Plenums. Air distribution shall system consist of galvanized steel sheet ducting, supply air diffusers, return air grilles, acoustic insulation for ducting complete supports and wooden frame work for mounting diffuser and grilles. Thermal insulation shall be provided for drain line from drain pan of air handling units to floor drain and refrigerant piping. 14. Calculations The contractor shall submit detailed caloulation for the capacity (Tonnage) offered. Tentative quantities of material and labour are provided in the schedules. 859)

S-ar putea să vă placă și