EQUIPO UND VALOR CANT

EQUIPO DE TOPOGRAFIA DE 103,500.00 0.004


CARGADOR hM 96,048.00 3,200
MINICARGADOR hM 72,036.00
RETROCARGADOR hM 102,051.00 0.350
CARROTANQUE DE AGUA dM 289,800.00 0.032
CARROTANQUE DE AGUA hM 26,225.00 0.005
CARROTANQUE IRRIGADOR DE ASFALTO hM 65,205.00
COMPACTADOR DE LLANTAS hM 96,048.00 0.032
RANA COMPACTADORA dM 54,027.00 0.200
ALLAADORA dM 144,072.00
RODILLO MONOCILINDRICO dM 240,120.00
RODILLO BICILINDRICO (A BORDO) hM 57,546.00
COMPRESOR DE 1 MARTILLO ( 175CFM . 115 PSI) hM 60,030.00 9,600
MINIEXCAVADOR CUCHARA DE 20" hM 84,042.00
RETROEXCAVADORA 420 E (0.7 M3-0.2 M3) hM 96,048.00 0.250
MARTILLO ELECTRICO ROMPEDOR dM 57,628.00
MARTILLO HIDRAULICO PARA RETRO dm 72,450.00
MOTOGUADAA hm 25,875.00 4,800
MOTOSIERRA hM 10,867.00 7,700
APISONADOR (CANGURO) hM 96,048.00
COMPRESOR DE AIRE hM 78,246.00 0.076
BULLDOZER hM 120,060.00 0.040
VIBRO CASE (BENITIN) hM 51,750.00
VIBROCOMPACTADOR hM 96,048.00 0.020
TERMINADOR DE ASFALTO hM 186,300.00
TANQUE IRRIGADOR Dm 360,180.00
MOTONIVELADORA hM 120,060.00 0.01
RETROEXCAVADORA 320 hM 150,075.00 0.037
RETROEXCAVADORA KOMATSU hM 180,090.00 0.090
RETROEXCAVADORA DE ORUGA hM 132,066.00 0.100
FINISHER SB-111 hM 108,675.00 0.083
FINISHER CEDARAPIDS hM 114,057.00
VOLQUETA 5M3 hM 43,780.00 0.040
VOLQUETA 5M3 VJE 80,000.00 0.085
VOLQUETA 5M3 M3/KM 950.00 250,000
CAMION 350 Hm 32,600.00 0.200
CAMIONETA D300 Hm 27,168.00 0.333
VEHICULO DELINEADOR Hm 11,300.00 0.001
PODADORA Dm 69,345.00
CORTADORA DE CESPED Dm 72,036.00
MEZCLADORA DE 1 BULTO Dm 57,628.00 1,620
MEZCLADORA DE 1.5 BULTOS Dm 57,628.00 0.200
MOTOBOMBA GAS/ELEC 3" Dm 57,628.00 0.200
PLUMA ELECTRICA Dm 57,628.00 0.012
BOMBA PARA CONCRETO M3 42,021.00 0.160
DIFERENCIAL 2 TONELADAS du 18,009.00
POLEA du 12,730.00
PLUMA GRUA BRAZO 20M - 1.0 T hM 51,750.00 0.084
REGLA VIBRATORIA (GAS) DM 55,269.00
ANALISIS UNITARIO

UNITARIO ESTUCO SOBRE MUROS UND: M2

MATERIALES
DESCRIPCION UNIDAD VR. UNIDAD CANTIDAD VR. PARCIAL
ESTUCOS LIJOS KG 3,000.00 2.3000 6,900.00
LIJA N80 UND 1,200.00 0.1000 120.00
0.00
0.00
0.00
DESPERDICIO (5%) 351
TOTAL MATERIALES: 7,371.00

EQUIPOS
DESCRIPCION UNIDAD VR. UNIDAD CANTIDAD VR. PARCIAL
RETROEXCAVADORA DE ORUGA #REF! #REF! 0.100
POLEA #REF! #REF! 0.0000
PLUMA ELECTRICA #REF! #REF! 0.012

TOTAL EQUIPOS:

MANO DE OBRA
DESCRIPCION UNIDAD VR. UNIDAD CANTIDAD VR. PARCIAL
DIA 293,488.41 10.0000 29,348.84

TOTAL MANO DE OBRA: 29,348.84

PRECIO UNITARIO TOTAL: 36,719.84