Sunteți pe pagina 1din 10

Shear Strength by Direct Shear

(Small Shear Box)

Client MUNICIPALIDAD DISTRITAL DE ECHARATI Structure CIMENTACIN


Project MEJ. AMPL. CAMINO VECINAL CIRCUITO INTEGRACIN EN MICRO Job 754
CUENCA RO CIRIALO ZONALES PALMA REAL Y KITENI-ECHARATI Sample C-2 E-2

Test Details
Standard ASTM D3080-03 / AASHTO T236-92 Specific Gravity 2.65
Sample Type Core Sample Single/ Multi Stage Single Stage
Lab. Temperature 30.0 deg.C Location ESTRIBO IZQUIERDO
Sample Description CIRIALO-MANZANARES KM 14+200 ESTRIBO IZQUIERDO
Observation None

Specimen Details
Specimen Reference A Description
Depth within Sample 0.00mm Orientation within Sample
Initial Height 19.570 mm Area 3166.92 mm2
Structure / Preparation Initial Water Content* 20.4 %
Initial Wet Unit Weight 17.25 kN/m3 Degree of Saturation 66.47 %
Initial Dry Unit Weight 14.33 kN/m3 Initial Voids Ratio 0.814
Final Wet Unit Weight 18.85 kN/m3 Final Water Content 21.42%
Final Dry Unit Weight 15.52 kN/m3 Dry Mass 90.52 g
Tested Dry or Submerged Submerged
Comments
* Calculated from initial and dry weights of whole specimen

Deformation vs Square Root Time

Tim e Square Root Mins


0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2
0.036

0.136

0.236
Deformation mm

0.336

0.436

0.536

0.636

0.736

0.836

0.936

ELE International, SM SAN MARCOS S.A. Page 1 of 10


Shear Strength by Direct Shear
(Small Shear Box)

Client MUNICIPALIDAD DISTRITAL DE ECHARATI Structure CIMENTACIN


Project MEJ. AMPL. CAMINO VECINAL CIRCUITO INTEGRACIN EN MICRO Job 754
CUENCA RO CIRIALO ZONALES PALMA REAL Y KITENI-ECHARATI Sample C-2 E-2

Shear Stress Vs Displacement

0.45

0.4
Shear Stress kg/cm2

0.35

0.3

0.25

0.2

0.15

0.1

0.05

0
0 10 20 30 40 50 60 70 80 90 100
Relative Lateral Displacem ent %

Change in Specimen Thickness Vs Displacement

Relative Lateral Displacem ent %


0 10 20 30 40 50 60 70 80 90 100
0

0.1
Change in Thickness

0.2

0.3

0.4

0.5

Rate of Horizontal Displacement Stage 1: 0.4000mm/min

ELE International, SM SAN MARCOS S.A. Page 2 of 10


Shear Strength by Direct Shear
(Small Shear Box)

Client MUNICIPALIDAD DISTRITAL DE ECHARATI Structure CIMENTACIN


Project MEJ. AMPL. CAMINO VECINAL CIRCUITO INTEGRACIN EN MICRO Job 754
CUENCA RO CIRIALO ZONALES PALMA REAL Y KITENI-ECHARATI Sample C-2 E-2

Conditions at Failure
Normal Stress 0.649 kg/cm2
Peak Strength 0.420 kg/cm2
Horizontal Deformation 2.698 mm
Residual Stress 0.000 kg/cm2
Vertical Deformation 1.560 mm

Tested By Ing Scrates Palomino Gamboa


and Date: Julio de 2017

ELE International, SM SAN MARCOS S.A. Page 3 of 10


Shear Strength by Direct Shear
(Small Shear Box)

Client MUNICIPALIDAD DISTRITAL DE ECHARATI Structure CIMENTACIN


Project MEJ. AMPL. CAMINO VECINAL CIRCUITO INTEGRACIN EN MICRO Job 754
CUENCA RO CIRIALO ZONALES PALMA REAL Y KITENI-ECHARATI Sample C-2 E-2

Test Details
Standard ASTM D3080-03 / AASHTO T236-92 Specific Gravity 2.65
Sample Type Core Sample Single/ Multi Stage Single Stage
Lab. Temperature 30.0 deg.C Location ESTRIBO IZQUIERDO
Sample Description CIRIALO-MANZANARES KM 14+200 ESTRIBO IZQUIERDO
Observation None

Specimen Details
Specimen Reference B Description
Depth within Sample 0.00mm Orientation within Sample
Initial Height 19.570 mm Area 3166.92 mm2
Structure / Preparation Initial Water Content* 20.4 %
Initial Wet Unit Weight 17.28 kN/m3 Degree of Saturation 66.66 %
Initial Dry Unit Weight 14.35 kN/m3 Initial Voids Ratio 0.812
Final Wet Unit Weight 19.28 kN/m3 Final Water Content 21.15%
Final Dry Unit Weight 15.91 kN/m3 Dry Mass 90.65 g
Tested Dry or Submerged Submerged
Comments
* Calculated from initial and dry weights of whole specimen

Deformation vs Square Root Time

Tim e Square Root Mins


0 0.5 1 1.5 2 2.5
0

0.2
Deformation mm

0.4

0.6

0.8

1.2

ELE International, SM SAN MARCOS S.A. Page 4 of 10


Shear Strength by Direct Shear
(Small Shear Box)

Client MUNICIPALIDAD DISTRITAL DE ECHARATI Structure CIMENTACIN


Project MEJ. AMPL. CAMINO VECINAL CIRCUITO INTEGRACIN EN MICRO Job 754
CUENCA RO CIRIALO ZONALES PALMA REAL Y KITENI-ECHARATI Sample C-2 E-2

Shear Stress Vs Displacement

0.6
Shear Stress kg/cm2

0.5

0.4

0.3

0.2

0.1

0
0 10 20 30 40 50 60 70 80 90 100
Relative Lateral Displacem ent %

Change in Specimen Thickness Vs Displacement

Relative Lateral Displacem ent %


0 10 20 30 40 50 60 70 80 90 100
0

0.1
Change in Thickness

0.2

0.3

0.4

0.5

0.6

Rate of Horizontal Displacement Stage 1: 0.4000mm/min

ELE International, SM SAN MARCOS S.A. Page 5 of 10


Shear Strength by Direct Shear
(Small Shear Box)

Client MUNICIPALIDAD DISTRITAL DE ECHARATI Structure CIMENTACIN


Project MEJ. AMPL. CAMINO VECINAL CIRCUITO INTEGRACIN EN MICRO Job 754
CUENCA RO CIRIALO ZONALES PALMA REAL Y KITENI-ECHARATI Sample C-2 E-2

Conditions at Failure
Normal Stress 0.965 kg/cm2
Peak Strength 0.628 kg/cm2
Horizontal Deformation 8.620 mm
Residual Stress 0.000 kg/cm2
Vertical Deformation 1.919 mm

Tested By Ing Scrates Palomino Gamboa


and Date: Julio de 2017

ELE International, SM SAN MARCOS S.A. Page 6 of 10


Shear Strength by Direct Shear
(Small Shear Box)

Client MUNICIPALIDAD DISTRITAL DE ECHARATI Structure CIMENTACIN


Project MEJ. AMPL. CAMINO VECINAL CIRCUITO INTEGRACIN EN MICRO Job 754
CUENCA RO CIRIALO ZONALES PALMA REAL Y KITENI-ECHARATI Sample C-2 E-2

Test Details
Standard ASTM D3080-03 / AASHTO T236-92 Specific Gravity 2.65
Sample Type Core Sample Single/ Multi Stage Single Stage
Lab. Temperature 30.0 deg.C Location ESTRIBO IZQUIERDO
Sample Description CIRIALO-MANZANARES KM 14+200 ESTRIBO IZQUIERDO
Observation None

Specimen Details
Specimen Reference C Description
Depth within Sample 0.00mm Orientation within Sample
Initial Height 19.570 mm Area 3166.92 mm2
Structure / Preparation Initial Water Content* 20.4 %
Initial Wet Unit Weight 17.28 kN/m3 Degree of Saturation 66.64 %
Initial Dry Unit Weight 14.35 kN/m3 Initial Voids Ratio 0.812
Final Wet Unit Weight 19.77 kN/m3 Final Water Content 20.93%
Final Dry Unit Weight 16.35 kN/m3 Dry Mass 90.63 g
Tested Dry or Submerged Submerged
Comments
* Calculated from initial and dry weights of whole specimen

Deformation vs Square Root Time

Tim e Square Root Mins


0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2
0.001

0.201

0.401
Deformation mm

0.601

0.801

1.001

1.201

1.401

1.601

ELE International, SM SAN MARCOS S.A. Page 7 of 10


Shear Strength by Direct Shear
(Small Shear Box)

Client MUNICIPALIDAD DISTRITAL DE ECHARATI Structure CIMENTACIN


Project MEJ. AMPL. CAMINO VECINAL CIRCUITO INTEGRACIN EN MICRO Job 754
CUENCA RO CIRIALO ZONALES PALMA REAL Y KITENI-ECHARATI Sample C-2 E-2

Shear Stress Vs Displacement

0.8

0.7
Shear Stress kg/cm2

0.6

0.5

0.4

0.3

0.2

0.1

0
0 10 20 30 40 50 60 70 80 90 100
Relative Lateral Displacem ent %

Change in Specimen Thickness Vs Displacement

Relative Lateral Displacem ent %


0 10 20 30 40 50 60 70 80 90 100
0

0.1
Change in Thickness

0.2

0.3

0.4

0.5

0.6

Rate of Horizontal Displacement Stage 1: 0.4000mm/min

ELE International, SM SAN MARCOS S.A. Page 8 of 10


Shear Strength by Direct Shear
(Small Shear Box)

Client MUNICIPALIDAD DISTRITAL DE ECHARATI Structure CIMENTACIN


Project MEJ. AMPL. CAMINO VECINAL CIRCUITO INTEGRACIN EN MICRO Job 754
CUENCA RO CIRIALO ZONALES PALMA REAL Y KITENI-ECHARATI Sample C-2 E-2

Conditions at Failure
Normal Stress 1.281 kg/cm2
Peak Strength 0.820 kg/cm2
Horizontal Deformation 8.443 mm
Residual Stress 0.000 kg/cm2
Vertical Deformation 2.415 mm

Tested By Ing Scrates Palomino Gamboa


and Date: Julio de 2017

ELE International, SM SAN MARCOS S.A. Page 9 of 10


Shear Strength by Direct Shear
(Small Shear Box)

Test Summary
Reference A B C
Normal Stress 0.649 kg/cm2 0.965 kg/cm2 1.281 kg/cm2
Peak Strength 0.420 kg/cm2 0.628 kg/cm2 0.820 kg/cm2
Corresponding Horizontal Displacement 2.698 mm 8.620 mm 8.443 mm
Residual Stress N/A N/A N/A
Stage 1: Stage 1: Stage 1:
Rate of Shear Displacement
0.4000mm/min 0.4000mm/min 0.4000mm/min
Final Height 18.07 mm 17.65 mm 17.17 mm
Sample Area 3166.92 mm2 3166.92 mm2 3166.92 mm2
Initial Wet Unit Weight 17.25 kN/m3 17.28 kN/m3 17.28 kN/m3
Initial Dry Unit Weight 14.33 kN/m3 14.35 kN/m3 14.35 kN/m3
Final Wet Unit Weight 18.85 kN/m3 19.28 kN/m3 19.77 kN/m3
Final Dry Unit Weight 15.52 kN/m3 15.91 kN/m3 16.35 kN/m3
Final Moisture Content 21.4 % 21.1 % 20.9 %
Particle Specific Gravity 2.65 2.65 2.65
Final Void Ratio 0.6750 0.6339 0.5899
Final Saturation 84.10% 88.41% 94.04%

ELE International, SM SAN MARCOS S.A. Page 10 of 10

S-ar putea să vă placă și