2: In an emergency it is possible to place a BOP Function into the "block" position on the
Remote Control Panel without having to use the master/enable button
TRUE FALSE
3 marks
3: "The Block function on the BOP control panel can be used for", from the list below select
the correct statement.
TWO answers required.
a. To isolate an unexpected leak in the Power Fluid System below the SPM
valves.
b. To isolate an unexpected leak in the Power Fluid System above the SPM
valves.
4 marks
4: From the list below select the correct statement regarding the " Memory " function on the
BOP control Panel.
b. To remind the Driller the position the BOP was in before it was "blocked".
c. To store data in the memory bank of the current pressures on all the
panel gauges.
4 marks
5: State the consequences of putting a closed annular preventer into the block position.
TWO answers required.
4 marks
6: From the list below select the correct answer for the statement, when a closed preventer is
blocked "
THREE answers required.
4 marks
1 mark
3 marks
9: Which of the following are activated by using pilot pressure:
a. SPM valves.
b. Shuttle valves.
c. Flow meter.
2 marks
10: The term, Total Accumulator Volume, refers to which of the following:
c. The total volume of nitrogen and hydraulic fluid stored in the accumulator bottles.
2 marks
11: The hydraulic systems on a sub sea installation are the pilot system and the main hydraulic
control system. Which of the following statements are true with respect to both these fluid
systems.
TWO answers required.
a. If the pilot supply system fails, fluid pressure to the pilot system will be supplied
from the main hydraulic control system.
c. Pilot pressure will be regulated to a reduced pressure at the sub sea pod.
d. The main hydraulic control pressure will be regulated to a reduced pressure at the
sub sea pod.
3 marks
12: What is the main purpose of having a locking device on ram preventers?
c. To lock the ram in the closed position during well control operations.
2 marks
13: For sub sea installations the closing system should be capable of closing each ram preventer
within a limited time period. What is the time that should not be exceeded?
a. 30 seconds.
b. 35 seconds.
c. 40 seconds.
d. 45 seconds.
1 mark
14: API 16e recommends that sub sea annulars smaller than 18" must close on the size of drill
pipe in use at the time of operation within:
a. 30 seconds.
b. 60 seconds.
c. 45 seconds.
d. 40 seconds.
15: For sub sea BOP's API 16e states that the accumulator system should be capable of closing
annular preventers larger than 18" within:
a. 30 seconds.
b. 60 seconds.
c. 45 seconds.
d. 40 seconds.
1 mark
16: For a sub sea BOP system, API RP 53 requirements for charge pumps are that they should
be capable of charging the accumulator bank from pre-charge to maximum rated working
pressure within:
2 marks
17: Which of the following gaskets are fitted into an H-4 Wellhead Connector?
2 marks
18: What is the maximum hydraulic pressure available for an emergency release of an H.4
connector?
a. 1500 psi.
IWCF Comb. Dr.Equip. Sept 05 6
b. 3000 psi.
c. 5000 psi.
2 marks
19: Which of the following statements are true regarding wellhead connectors:
a. The piston area for latching is greater than the piston area for unlatching.
b. The piston area for latching is smaller than the piston area for unlatching.
3 marks
21: Are all pipe rams designed to be closed against their full rated working pressure?
YES NO 4 marks
22: Are all pipe rams designed to be opened against their full rated working pressure?
YES NO 4 marks
3 marks
a. A hydrostatic shell test on the body of the preventer made by the manufacturer
before the BOP is transported to the field.
3 marks
25: The designation 135/8 on an item of BOP equipment designated as 15M - 135/8 refers to
which of the following statements.
3 marks
26: Figure Alert 086 below shows an API example of a Diverter with an Insert-Type Packer.
Match the numbers to the items listed below.
27: From the list below select the statements that are correct regarding fixed bore ram BOPs.
TWO answers required.
a. Ram BOPs are designed to contain and seal Rated Working Pressure from
above the closed rams as well as from below.
c. Fixed bore ram BOPs can close and seal on various pipe sizes.
d. Fixed bore ram BOPs can be used to hang off the drill string.
3 marks
28: Annular preventer sealing elements are designed to primarily seal around any size of pipe in
the hole, but can also seal off the well with no tubulars in the wellbore.
29: Which statements regarding ring gaskets used for flange to flange make up are correct?
TWO answers required.
b. the same material specifications apply to ring gaskets as to the ring grooves.
3 marks
30: From the list below select the main components of a 291/2 Diverter System?
TWO answers required.
b. A vent line of sufficient diameter to permit safe venting using the mud/gas separator.
e. A vent line of sufficient diameter to permit safe venting and proper disposal of flow
from the well.
3 marks
31: The Lower Kelly Cock, Upper Kelly Cock, Full Opening Safety Valve and IBOP are tools
used to prevent flow from inside the drill string. To what pressure should these tools be
tested to?
a. Twice the rated working pressure of the tool used (up to 5,000 PSI)
c. One and a half times the rated working pressure of the tool used.
e. At least equal to 70% of the rated internal pressure at minimum yield strength for
new drill pipe of the size and grade used in the upper part of the drillstring, but
limited to the maximum rated working pressure of the Blow Out Preventer up to a
maximum of (10,000 PSI for a 10K stack).
2 marks
32: Match the items below to the number indicated in the drawing.
33: A well kicks with the bit off bottom and is shut-in. A decision is made to strip back into the
hole, what equipment should be made up to the drillstring before the stripping operation can
safely be performed, there is no DICV in the string.
d. A Gray valve, (inside blowout preventer) with a full opening safety valve
in the open position above.
e. A full opening safety valve in the open position with a Gray valve,
(inside blowout preventer) above.
3 marks
34: According to API RP16E which type of fluid should be used in the reservoir of the BOP
accumulator control system when ambient temperatures of below zero degrees centigrade
(32 degrees Fahrenheit) are expected.
a. Salt water.
d. Diesel Oil.
e. Kerosene.
2 marks
35: When a ram BOP on a surface stack is closed, what happens to the operating fluid displaced
from the opening chamber?
36: Figure Alert 021 is a Shaffer type 72 Blind/Shear ram match the items listed to the numbers
on the drawing below. (1 mark for each correct answer.)
Alert 021
37: Figure Alert 018 show a Hydril GK annular preventer match the items listed below to the
numbers on the drawing.
38: From the eight illustrations shown on the following pages and match the correct number to
each one of the names listed below. (1 mark for each correct answer)
e. Non-return float.
g. Flapper float.
1 2 3
38 cont:
7 8
39: Select the correct answers from the list below why a weep hole is required on a ram BOP.
TWO answers required.
b. The weep hole prevents leakage through the primary ram shaft packing from the
well
bore to the hydraulic opening chamber.
c. The weep hole allows visual inspection of the ram shaft and should be plugged with
a bull-plug between inspections.
d. The weep hole indicates if the primary ram shaft packing is leaking well bore fluid.
d
e e. The weep hole is a grease release port that prevents over-greasing of the ram shaft
packing.
4 marks
40: What is meant by the terms, Primary and Secondary seals, when used in connection with ram
BOPs.
a. The Primary seal is closing in the well using the annular. The Secondary seal is
closing in the well using the rams after the annular has been closed.
b. The Primary seal is a seal established by a ring gasket between connections on the
side outlets or on end outlets. The Secondary seal is a seal established by a ring
gasket covered with Teflon tape.
c. The Primary seal is a well control method utilising mud hydrostatic pressure. The
Secondary seal is a well control method utilising both mud hydrostatic pressure and
the BOP to balance the formation pressure.
d. The Primary seal is the mechanical ram shaft packing. The Secondary seal is plastic
packing injected to activate an additional seal on the ram shaft in an emergency
should the Primary seal be leaking.
4 marks
41: Select the correct answers if a non-ported conventional flapper float valve is run in the bit
sub when tripping in the hole?
THREE answers required.
4 marks
42: What happens on a BOP accumulator control unit on a land rig if the UNIT/REMOTE
selector switch is placed in UNIT position:
TWO answers required.
a. All BOP functions can be operated from the Drillers Remote BOP Control Panel.
b. No BOP functions can be operated from the Drillers Remote BOP Control Panel.
c. The annular pressure regulator cannot be adjusted from the Drillers Remote Panel.
3 marks
43: Which of the following statements regarding Annular BOPs are correct?
THREE answers required
b. Annular BOPs are designed to seal around any object in the wellbore.
e. Annular BOPs will allow the reciprocating and/or rotating of the drill
string while maintaining a seal against the wellbore.
4 marks
44: On a surface BOP stack a small volume of fluid is required to operate the HCR valves on
the BOP side outlets. On an AIR Operated Remote Panel the Driller pushes the master air
valve and the choke open valve simultaneously. The close light goes out and the open light
comes on. Do the lights confirm that the choke line valve is in the open position?
True False
2 marks