HOJA DE DATOS
IPE-10-1232-I-HD-004
CLIENTE: Hoja:
YPFB TRANSPORTE S.A. 1 de 3
PROYECTO: ING. BASICA Y DETALLE
ESTACION DE COMPRESION TOTOROCO
TITULO:
INDICE DE REVISIONES
IPE-10-1232 IPE-10-1232-I-HD-004=1.xls
Notes:
1. Vendor shall include 2" pipe mounting bracket.
2. Applies only for PIT-5015 y PIT-5040
Cliente: No. De Documento:
IPE-10-1232 IPE-10-1232-I-HD-004=1.xls
Item TAG NO. RANGO OPER. RANGO AJUSTE LINEA O EQUIPO SERVICIO
1 PIT-5000 0-2000 PSIG 0-4000 PSIG 6"0.250-D-G-1103 Regulacin de presin Gas a Oruro
2 PIT-5010 0-1500 PSIG 0-4000 PSIG 10"-0.500-D-G-1110 Descarga de gas Filtro separador V-5100
3 PIT-5011 0-1500 PSIG 0-4000 PSIG 3"-0.300-D-FG-2000 Entrada al 1er Puente de Regulacin
4 PIT-5102 0-1500 PSIG 0-4000 PSIG 6"-0.250-D-G-1101 Trampa Receptora PR-5100
5 PIT-5402 0-1500 PSIG 0-4000 PSIG 12"-0.688-D-G-1122 Entrada a Cmara de Valvulas
6 PIT-5202 0-1500 PSIG 0-4000 PSIG 12"-0.688-D-G-1102 Entrada a Estacin
7 PIT-5302 0-1500 PSIG 0-4000 PSIG 6"-0.250-D-G-1118 Trampa Lanzadora PL-5300
8 PIT-5112 0-1000 PSIG 0-4000 PSIG 3"-0.216-B-FG-2003 Salida del 1er Puente de Regulacin
9 PIT-5700 0-500 PSIG 0-800 PSIG F-5700 Entrada a filtro coalescente gas combustible F-5700