Revamping fired heaters is a practical and effective way to improve heater perform-
ance. This focuses on working with existing components and as a result, investment
and downtime is minimized. Revamping provides:
Longer Run Lengths
Capacity Increases
Efficiency Improvement
NOx Reduction
Engineering
Project Management
Procurement
Fabrication
Site Services
Revamping Process
A fired heater revamping project typically has the following phases:
Phase I → Engineering Study +/- 30% Cost Estimates.
Phase II → Project Design Basis Report +/- 10% Cost Estimates.
Phase III → Detailed Engineering and Project Services.
Do it Once, Do it Right!
FIS Technologies
Heaters have many common problems such as low capacity, high tube skin temperature, coking
issues and bad burner flame. To combat these issues FIS developed and patented three different
technologies.
CASE STUDY. We were hired to improve the efficiency of a Platformer Heater, and reduce the NOx
emissions to 0.06 lb/MMBtu. The client did not want to generate steam or preheat combustion air to
improve efficiency. The stack temperatures were over 1100 F. Thermal efficiency of the heater was
only 66%.
CANADA
CALIFORNIA, USA
Paul Henry
Bjurn Ltd.
David P. Diggins
Tel: (949)497-6551
Tel: 450-676-3222
Mobile: (949) 463-8591
Fax: 450-676-5997
digginsinc@cox.net
Bjuren@bellnet.ca
SAUDI ARABIA
Azfar Mahmood
Tel: +966-3-899-6333
Mobile: +966-5-3451-2635
azfar@smartbde.com