Daily Report

Project Name: KBK Project


Project Code: 03 YG 00400 Report Date : 9-Oct-2017 Monday No. of Day 801 Report No. DPR-495

Project Start Date 2015-8-1 Contract Period 956 Calendar Day AM PM Fine
Weather
Estimate Completion Date 2018-3-13 Remain Period 155 Calendar Day 6~8 8~10 10 ~12 13~15 15~17 17~19 Rain

Work Force
M&E Site Surveyo Office General Crane Crane Steel
Trades PM PE SSE Site Engr QA/QC QS Admin Safety Security Geotech Welder
engineer Store r Staff Workers Operator Helper Worker
Today 1 2 1 1 2 3 4
Operator Helper Manson Steel Carpente
Trades M&E Manson Smith Stud Bolt Total
(ACP) (ACP) worker Supervisior r
Today 1 4 4 23

Machine & Equipments onsite

Description previous Today Cum. Remarks Description previous Today Cum. Remarks Description previous Today Cum. Remarks

25 Ton Crane 0 0 0 1.5 Hp Submer; pump 1 1 1 19KW Welding Box 6 6 6

Sheet pile machine 0 0 0 1 Hp Motor pump 0 0 0 60 KVA generator 1 1 1

3"x3" Air Compressor 1 1 1 1.5 Hp Motor pump 0 0 0 2Hp compressor 1 1 1

165 KVA Generator 1 1 1 2Hp Pressure pump 1 1 1

Material Delivery On Site

Quantity Quantity Quantity


Description Unit Description Unit Description Unit Remarks
Today Total Today Total Today Total

1-1/2" MS Pipe 9 ( 6 M ) Nos 50

QC - Test Sampling

FO-OP-01 REV-00 Page: 1/2


Daily Report

Project Name: KBK Project


Project Code: Item 03 YG 00400 Report Date : 9-Oct-2017 Monday
Remarks No. of Day Report No. DPR-495
Test
Sampl
e
Taken

LTI Free Day UA,UC Near Miss FAI MTC LTA Daily TBT
HSE Conducted By
Safety Officer

Works Carried out Details

Trades Of Work Location Remark

1 Shear Connector Welding Work for Encase Column 10 th Floor

2 Deck Sheet F/W for D/H Wall 11 th Floor

3 Rebar Production Work for 1st Floor D/H Wall 1 st Floor 1/2 Day Only

4 F/W Alingment & Bracing Work for 1st Floor D/H Wall 1 st Floor

5 Housekeeping & Cleaing Basement Floor

Special Event

Visitors Site
Purpose
on site Instruction

Project Manager Project Engineer Prepare By: Site Engineer

Name U Khin Maung Myint Name Name Aye Wit Yee Soe

Signature Signature Signature

FO-OP-01 REV-00 Page: 2/2


FO-OP-01 REV-00 Page: 3/2
FO-OP-01 REV-00 Page: 4/2
KBK Project
Site Progress Photo
Date: 9.10.2017

Shear connectors welding work & Decksheet F/W

Shear connectors welding work & decksheeet


KBK Project
Site Progress Photo
Shear connectors welding work & decksheeet Date: 9.10.2017

Formwork Bracing & Alingment for D/H Wall At 1 st


Floor