Sunteți pe pagina 1din 1

ISSUE DATE:- 1-02-2017

REV:- 00

S.P. ENGINEERING WORKS PART INSPECTION REPORT FMT NO:- F-QA-18

SAMPLING PLAN
DRAFT APPROVE DRAFT APPROVE

INSP. HEAD QA INSP. HEAD QA


INSPECTOR

QA HEAD
10
10 13

PPM :
ITEM INSPECTOR INSP DATE DELIVERY CLASSIFICATION

PART CODE TIGHTENED INSP.


INSPECTOR STATUS
MODEL ABNORMAL INSP .
CUSTOMER HEAD INSP DATE CONTROL
LOT NO 4M / ECN CHANGE
HEAD STATUS
LOT SIZE INTIAL PRODUCTS
INSP ITEMS
INSPECTOR INSP. RESULT QA HEAD INSP. RESULT
NO. INSP . ITEM SPECS. INST. REQD.

b
APPEARANCE

e
Raw Material / Grade

a
Functional /
Fittment

c
Dimension (mm)

g
Others

Remarks:

S-ar putea să vă placă și