Art. 73 y 74
Art.106 LSS Art.106 LSS Art.25 Art.107 LSS(7.58875 Art.211 y Art.168 Art.147 LSS
(2.08%) (19.10%) LSS(1.050%) LSS(0.70%) %) 212 LSS(1%) LSS(2%) (1.75%)
$0.93 $13.39 $2.04 $1.36 $14.77 $1.95 $3.89 $3.41
$1.55 $13.39 $3.41 $2.27 $24.62 $3.24 $6.49 $5.68
$1.86 $13.39 $4.09 $2.73 $29.54 $3.89 $7.79 $6.81
$1.24 $13.39 $2.73 $1.82 $19.69 $2.60 $5.19 $4.54
$1.49 $13.39 $3.27 $2.18 $23.63 $3.11 $6.23 $5.45
$1.86 $13.39 $4.09 $2.73 $29.54 $3.89 $7.79 $6.81
$1.18 $13.39 $2.59 $1.73 $18.71 $2.47 $4.93 $4.31
$1.73 $13.39 $3.82 $2.54 $27.57 $3.63 $7.27 $6.36
$1.24 $13.39 $2.73 $1.82 $19.69 $2.60 $5.19 $4.54
$1.42 $13.39 $3.13 $2.09 $22.65 $2.98 $5.97 $5.22
$1.36 $13.39 $3.00 $2.00 $21.66 $2.85 $5.71 $5.00
$1.30 $13.39 $2.86 $1.91 $20.68 $2.73 $5.45 $4.77
$1.61 $13.39 $3.54 $2.36 $25.60 $3.37 $6.75 $5.90
$1.11 $13.39 $2.45 $1.64 $17.73 $2.34 $4.67 $4.09
$3.03 $13.39 $6.68 $4.45 $48.25 $6.36 $12.72 $11.13
$1.92 $13.39 $4.22 $2.82 $30.53 $4.02 $8.05 $7.04
$1.80 $13.39 $3.95 $2.63 $28.56 $3.76 $7.53 $6.59
$2.29 $13.39 $5.04 $3.36 $36.44 $4.80 $9.60 $8.40
$3.03 $13.39 $6.68 $4.45 $48.25 $6.36 $12.72 $11.13
$2.79 $13.39 $6.13 $4.09 $44.31 $5.84 $11.68 $10.22
$2.29 $13.39 $5.04 $3.36 $36.44 $4.80 $9.60 $8.40
$2.97 $13.39 $6.54 $4.36 $47.27 $6.23 $12.46 $10.90
$3.03 $13.39 $6.68 $4.45 $48.25 $6.36 $12.72 $11.13
$0.99 $13.39 $2.18 $1.45 $15.76 $2.08 $4.15 $3.63
$0.80 $13.39 $1.77 $1.18 $12.80 $1.69 $3.37 $2.95
$1.86 $13.39 $4.09 $2.73 $29.54 $3.89 $7.79 $6.81
$1.23 $13.39 $2.72 $1.81 $19.63 $2.59 $5.17 $4.53
$0.82 $13.39 $1.81 $1.21 $13.09 $1.72 $3.45 $3.02
$0.93 $13.39 $2.04 $1.36 $14.77 $1.95 $3.89 $3.41
$0.37 $13.39 $0.82 $0.55 $5.91 $0.78 $1.56 $1.36
$1.11 $13.39 $2.45 $1.64 $17.73 $2.34 $4.67 $4.09
$0.40 $13.39 $0.89 $0.59 $6.40 $0.84 $1.69 $1.48
$2.35 $13.39 $5.18 $3.45 $37.42 $4.93 $9.86 $8.63
Art. 160
Art. 168 Art. 29 LI RLOP
(3.15%) (5%) Sp (Sp/SBC)
$6.13 $9.73 $57.60 0.29594618
$10.22 $16.22 $87.08 0.26843096
$12.26 $19.46 $101.82 0.26155216
$8.18 $12.98 $72.34 0.27874917
$9.81 $15.57 $84.13 0.27015067
$12.26 $19.46 $101.82 0.26155216
$7.77 $12.33 $69.39 0.28146449
$11.45 $18.17 $95.92 0.26400888
$8.18 $12.98 $72.34 0.27874917
$9.40 $14.92 $81.18 0.27201991
$8.99 $14.27 $78.24 0.27405908
$8.58 $13.63 $75.29 0.27629245
$10.63 $16.87 $90.03 0.26684355
$7.36 $11.68 $66.45 0.28448151
$20.03 $31.79 $157.82 0.2482157
$12.67 $20.11 $104.77 0.26044268
$11.85 $18.82 $98.87 0.26273816
$15.12 $24.01 $122.45 0.25504518
$20.03 $31.79 $157.82 0.2482157
$18.39 $29.20 $146.03 0.25008749
$15.12 $24.01 $122.45 0.25504518
$19.62 $31.14 $154.88 0.2486544
$20.03 $31.79 $157.82 0.2482157
$6.54 $10.38 $60.55 0.29164693
$5.31 $8.43 $51.71 0.30652895
$12.26 $19.46 $101.82 0.26155216
$8.15 $12.93 $72.15 0.27891739
$5.43 $8.62 $52.56 0.30479701
$6.13 $9.73 $57.60 0.29594618
$2.45 $3.89 $31.07 0.39912823
$7.36 $11.68 $66.45 0.28448151
$2.66 $4.22 $32.55 0.38589977
$15.53 $24.65 $125.40 0.25431131
Cuadrilla 1 (ayudante)
No Descripcin Unidad Cantidad Costo Importe
Mano de obra
1 Ayudante jor 1 $252.25 $252.25
2 Cabo de ayudante jor 0.05 $331.87 $16.59
Herramienta y equipo
1 Herramienta menor %mo 0.03 $268.84 $8.07
Costo Directo $276.91
Cuadrilla 9()
No Descripcin Unidad Cantidad Costo Importe
Mano de obra
1 jor 1 $0.00
2 jor 1 $0.00
3 Cabo de oficio (M.O) jor 0.033333 $0.00
Herramienta y equipo
1 Herramienta menor %mo 0.03 $0.00 $0.00
Costo Directo $0.00
Cuadrilla 10(Oficial Azulejero+ayudante)
No Descripcin Unidad Cantidad Costo Importe
Mano de obra
1 Oficial azulejero jor 1 $411.49 $411.49
2 Ayudante jor 1 $252.25 $252.25
3 Cabo de oficio (M.O) jor 0.033333 $491.10 $16.37
Herramienta y equipo
1 Herramienta menor %mo 0.03 $680.10 $20.40
Costo Directo $700.50
Cuadrilla 11()
No Descripcin Unidad Cantidad Costo Importe
Mano de obra
1 jor 1 $0.00
2 jor 1 $0.00
3 Cabo de oficio (M.O) jor 0.033333 $0.00
Herramienta y equipo
1 Herramienta menor %mo 0.03 $0.00 $0.00
Costo Directo $0.00
Cuadrilla 15()
No Descripcin Unidad Cantidad Costo Importe
Mano de obra
1 jor 1 $0.00
2 jor 1 $0.00
3 Cabo de oficio (M.O) jor 0.033333 $0.00
Herramienta y equipo
1 Herramienta menor %mo 0.03 $0.00 $0.00
Costo Directo $0.00
Cuadrilla 16(Tubero+ayudante)
No Descripcin Unidad Cantidad Costo Importe
Mano de obra
1 Tubero jor 1 $491.10 $491.10
2 Ayudante jor 1 $252.25 $252.25
3 Cabo de oficio (M.O) jor 0.033333 $491.10 $16.37
Herramienta y equipo
1 Herramienta menor %mo 0.03 $759.72 $22.79
Costo Directo $782.51
Cuadrilla 33(aluminero+ayudante)
No Descripcin Unidad Cantidad Costo Importe
Mano de obra
1 Aluminero jor 1 $300.02 $300.02
2 Ayudante jor 1 $116.89 $116.89
3 Cabo de oficio (M.O) jor 0.033333 $491.10 $16.37
Herramienta y equipo
1 Herramienta menor %mo 0.03 $433.28 $13.00
Costo Directo $446.28
Cuadrilla 34(Colocador+ayudante)
No Descripcin Unidad Cantidad Costo Importe
Mano de obra
1 Oficial Colocador jor 1 $618.49 $618.49
2 Ayudante jor 1 $252.25 $252.25
3 Cabo de oficio (M.O) jor 0.033333 $491.10 $16.37
Herramienta y equipo
1 Herramienta menor %mo 0.03 $887.11 $26.61
Costo Directo $913.72
Resumen de cuadrillas
No. Cuadrilla Costo directo
1 ayudante $276.91
2 Oficial albail+ayudante $700.50
3 Oficial electricista+ayudante $684.10
4 Oficial plomero+ayudante $782.51
5 Oficial albail+2 ayudantes $968.75
6 Oficial carpintero de obra negra+ayudante $602.10
7 Oficial Fierrero+ayudante $667.70
8 Oficial herrero en campo+ayudente $749.71
9 $0.00
10 Oficial Azulejero+ayudante $700.50
11 $0.00
12 Oficial yesero+ayudante $618.50
13 Oficial carpintero de banco+ayudante $651.30
14 Oficial pintor+ayudante $634.90
15 $0.00
16 Tubero+ayudante $782.51
17 Operador de equipo ligero $497.87
18 Operador de vehiculo con grua $448.66
19 Operador de camion+ayudante $585.69
20 Operador de cargador+ayudante $585.69
21 Operador de carpeteador+ayudante $2,395.51
22 Operador de compresor $530.67
23 Operador de duo-pactor $629.08
24 Operador de motoconformadora+ayudante $1,094.14
25 Operador de perforadora+ayudante $782.51
26 Operador de petrolizadora+ayudante $1,028.54
27 Operador de plancha $629.08
28 Operador de retroexcavadora+ayudante $1,077.74
29 Operador de tractor+ayudante $1,094.14
30 Auxiliar de topografia+2 cadeneros $821.15
31 Oficial vidriero+ayudante $388.88
32 Oficial albail+6 ayudante $1,999.58
33 aluminero+ayudante $446.28
34 Colocador+ayudante $913.72
Lista de Materiales
No. Concepto Unidad P/U
1 Agua de toma municipal m3
2 Alambre TW m
3 Alambre liso galvanizado cal. 10 kg $22.41
4 Alambre recocido No. 18 kg $12.81
5 Alambron liso de No. 2 (1/4") kg $18.00
6 Acero Tubular (perfil tubular) kg $20.00
7 Acero Estructural (perfil Estructural) kg $16.00
8 Arbotante 100W pza
9 Arbotante 75W pza
10 Arbotante 50W pza
11 Arbotante ahorradora 25W pza
12 Arbotante ahorradora 22W pza
13 Arbotante ahorradora 10w pza
14 Arena m3 $160.00
15 Azulejo de 11X11 cms m2 $73.00
16 Block hueco de 12X20X40 cms pza $6.00
17 Block hueco de 14X20X40 cms pza
18 Block hueco de 15X20X40 cms pza $6.00
19 Bovedila de concreto 16/70 pza
20 Bovedilla de concreto 20/70 pza
21 Brida con rosca de 4" de FoFo pza
22 Brida con rosca de 3" de FoFo pza
23 Brida con rosca de 2 1/2" de FoFo pza
24 Brida con rosca de 2" de FoFo pza
25 Brocal ligero pza
26 Brocal mediano pza
27 Brocal pesado pza
28 Brocal y tapa de concreto pza
29 Calhidra en saco pza $45.00
30 Cemento crest kg
31 Cemento normal gris ton $2,500.00
32 Clavo de 2 1/2" a 3 1/2" kg $16.38
33 Codo FoGo de 45 de 4" pza
34 Codo FoGo de 45 de 3" pza
35 Codo FoGo de 45 de 2 1/2" pza
36 Codo FoGo de 45 de 2" pza
37 Codo FoGo de 45 de 1 1/2" pza
38 Codo FoGo de 45 de 1" pza
39 Codo FoGo de 45 de 3/4" pza
40 Codo FoGo de 45 de 1/2" pza
41 Codo FoGo de 90 de 4" pza
42 Codo FoGo de 90 de 3" pza
43 Codo FoGo de 90 de 2 1/2" pza
44 Codo FoGo de 90 de 2" pza
45 Codo FoGo de 90 de 1 1/2" pza
46 Codo FoGo de 90 de 1" pza
47 Codo FoGo de 90 de 3/4" pza
48 Codo FoGo de 90 de 1/2" pza
49 Codo CPVC de 45 de 1" pza
50 Codo CPVC de 45 de 3/4" pza $2.51
51 Codo CPVC de 45 de 1/2" pza $1.50
52 Codo CPVC de 90 de 1" pza $5.22
53 Codo CPVC de 90 de 3/4" pza $2.41
54 Codo CPVC de 90 de 1/2" pza $1.04
55 Codo cobre de 45 de 1" pza $47.16
56 Codo cobre de 45 de 3/4" pza $14.97
57 Codo cobre de 45 de 1/2" pza $6.42
58 Codo cobre de 90 de 1" pza $24.59
59 Codo cobre de 90 de 3/4" pza $9.52
60 Codo cobre de 90 de 1/2" pza $4.84
61 Codo TUBO PLUS de 45 de 1" pza $6.82
62 Codo TUBO PLUS de 45 de 3/4" pza $7.36
63 Codo TUBO PLUS de 45 de 1/2" pza $4.53
64 Codo TUBO PLUS de 90 de 1" pza $11.47
65 Codo TUBO PLUS de 90 de 3/4" pza $4.11
66 Codo TUBO PLUS de 90 de 1/2" pza $2.83
67 Coladera de 4X4" pza
68 Coladera de 6"X6" pza
69 Coladera de 8"X8" pza
70 Concreto presmezclado fc=100 kg/cm2 m3
71 Concreto presmezclado fc=150 kg/cm2 m3
72 Concreto presmezclado fc=200 kg/cm2 m3
73 Concreto presmezclado fc=250 kg/cm2 m3
74 Cristal transparente 3 mm m2 $140.00
75 Cristal transparente 6 mm m2 $350.00
76 Cristal transparente 12 mm m2
77 Cristal transparente 16 mm m2
78 Cruz FoGo de 4" pza
79 Cruz FoGo de 3" pza
80 Cruz FoGo de 2 1/2" pza
81 Cruz FoGo de 2" pza
82 Cruz FoGo de 1 1/2" pza
83 Cruz FoGo de 1" pza
84 Cruz FoGo de 3/4" pza
85 Cruz FoGo de 1/2" pza
86 Cruz CPVC de 1" pza
87 Cruz CPVC de 3/4" pza
88 Cruz CPVC de 1/2" pza
89 Cruz cobre de 1" pza
90 Cruz cobre de 3/4" pza
91 Cruz cobre de 1/2" pza
92 Cruz TUBO PLUS de 1" pza
93 Cruz TUBO PLUS de 3/4" pza
94 Cruz TUBO PLUS de 1/2" pza
95 Curva de 90 grados y 50mm diametro en PVC pza
96 Curva de 90 grados y 25mm diametro en PVC pza
97 Curva de 90 grados y 19mm diametro en PVC pza
98 Curva de 90 grados y 13mm diametro en PVC pza
99 Diesel lts $14.20
100 Emulsion asfaltica lts
101 Escalerilla de 15 cm m
102 Festerblanc cubeta
103 Festerflex 1.10x10 m bolsa
104 Foco de vapor de sodio de 150w pza
105 Foco de vapor de sodio de 250w pza
106 Gas butano kg
107 Grava m3 $160.00
108 Hidroprimer (cellador) cubeta
109 Juego de herrajes para puerta jgo $1,200.00
110 Ladrillo rojo recocido de 14x28X5 cm pza $3.50
111 Ladrillo rojo recocido de 14x28X7 cm pza $3.80
112 Ladrillo rojo recocido de 14x28X8 cm pza $4.00
113 Ladrillo rojo recocido de 14x28X10 cm pza $4.50
114 Lamina negra cal. 10 kg
115 Lamina negra cal. 12 kg
116 Lamina negra cal. 14 kg
117 Lamina negra cal. 16 kg
118 Lamina negra cal. 18 kg
119 Lamina negra cal. 20 kg
120 Lamina negra cal. 22 kg
121 Lamina galvanizada cal. 26 m
122 Lamina galvanizada cal. 32 m
123 Loseta de barro marca----- tipo. m2
124 Loseta vinilica de 2mm m2
125 Loseta vinilica de 3mm m2
126 Madera de pino de 3a. pt
127 Malla electrosoldada de 6x6-10/10 m2
128 Malla electrosoldada de 6x6-12/12 m2
129 Malla de refuerzo para DUROCK m
130 Moldura de poliestireno tipo pecho de paloma m
131 Panel de yeso de 12.7 mm de 1.22X2.44 m hoja
132 Panel estructural de 4" de 1.22X2.44 m marca? pza
133 Panel estructural de 3" de 1.22X2.44 m marca? pza
134 Panel estructural de 2" de 1.22X2.44 m marca? pza
135 Panel tablacemento DUROCK 12.7mm 1.22X2.44 m pza
136 Pasta ESTREY standard 21.80 kg pza
137 Pasta texturi marca COMEX cubeta
138 Pegaloseta cubeta
139 Piedra braza m3 $170.00
140 Piedra de canto rodado m3 $250.00
141 Pintura anticorrosiva primer lts
142 Pintura anticorrosiva lts
143 Pintura epoxica amarillo transito lts
144 Pintura esmalte lts
145 Pintura vinilica lts $70.00
146 Plafond acustone de 61X61 cm caja
147 Plafond acustone de 122X61 cm caja
148 Reduccion de FoGo de 3" a 2" pza
149 Reduccion de FoGo de 3" a 1 1/2" pza
150 Reduccion de FoGo de 3" a 1" pza
151 Reduccion de FoGo de 2" a 1 1/2" pza
152 Reduccion de FoGo de 2" a 1" pza
153 Reduccion de FoGo de 1" a 3/4" pza
154 Reduccion de FoGo de 1" a 1/2" pza
155 Reduccion de FoGo de 3/4" a 1/2" pza
156 Reduccion de CPVC de 1" a 3/4" pza
157 Reduccion de CPVC de 1" a 1/2" pza
158 Reduccion de CPVC de 3/4" a 1/2" pza
159 Reduccion de cobre de 1" a 3/4" pza
160 Reduccion de cobre de 1" a 1/2" pza
161 Reduccion de cobre de 3/4" a 1/2" pza
162 Reduccion de cobre bushin de 1" a 3/4" pza
163 Reduccion de cobre bushin de 1" a 1/2" pza
164 Reduccion de cobre bushin de 3/4" a 1/2" pza
165 Reduccion de TUBO PLUS de 1" a 3/4" pza
166 Reduccion de TUBO PLUS de 1" a 1/2" pza
167 Reduccion de TUBO PLUS de 3/4" a 1/2" pza
168 Reduccion de PVC SANITARIO de 6" a 4" pza
169 Reduccion de PVC SANITARIO de 6" a 3" pza
170 Reduccion de PVC SANITARIO de 4" a 3" pza
171 Reduccion de PVC SANITARIO de 4" a 2" pza
172 Reduccion de PVC SANITARIO de 3" a 2" pza
173 Reduccion de PVC SANITARIO de 3" a 1 1/2" pza
174 Reduccion de PVC SANITARIO de 2" a 1 1/2" pza
175 Silicon estandar pza $45.00
176 Silicon para policarbonato pza $65.00
177 Soldadura E-6013 de 1/8" kg $25.00
178 Tabicon de 14X10X28 cm pza $5.50
179 Taquete de plastico de 1X1/4" pza $0.80
180 Taquete de expansion de 2X8/16" pza $3.40
181 Tee de FoGo de 4" pza
182 Tee de FoGo de 3" pza
183 Tee de FoGo de 2" pza
184 Tee de FoGo de 1 1/2" pza
185 Tee de FoGo de 1" pza
186 Tee de FoGo de 3/4" pza
187 Tee de FoGo de 1/2" pza
188 Tee de PVC SANITARIO de 6" pza
189 Tee de PVC SANITARIO 4" pza
190 Tee de PVC SANITARIO 3" pza
191 Tee de PVC SANITARIO 2" pza
192 Tee de PVC SANITARIO 1 1/2" pza
193 Tee de CPVC 1" pza
194 Tee de CPVC 3/4" pza
195 Tee de CPVC 1/2" pza
196 Tee de cobre 1" pza
197 Tee de cobre 3/4" pza
198 Tee de cobre 1/2" pza
199 Tee de TUBO PLUS 1" pza
200 Tee de TUBO PLUS 3/4" pza
201 Tee de TUBO PLUS 1/2" pza
202 Thiner lts $41.00
203 Tira de refuerzo para panel covintec pza
204 Tira de zig-zag o malla plana pza
205 Tornillo de 2" rosca estandar pza
206 Tornillo de acero de 16X64 mm pza
207 Tornillo de acero de 16X76 mm pza
208 Tornillo de acero de 19X89 mm pza
209 Tornillo de acero de 22X102mm pza
210 Tornillo para madera de 10X38 caja Caja
211 Tornillo S de 1 5/8" para tablaroca mill
212 Triplay de madera de pino de 1era. De 6mm hoja
213 Triplay de madera de pino de 2da. De 16mm hoja
214 Tubo conduit de pvc tipo R-1 de 51 mm m
215 Tubo conduit de pvc tipo R-1 de 25 mm m
216 Tubo conduit de pvc tipo R-1 de 19 mm m
217 Tubo conduit de pvc tipo R-1 de 13 mm m
218 Tubo PVC hidraulico RD 26 con campana de 150mm m
219 Tubo PVC hidraulico RD 26 con campana de 100mm m
220 Tubo PVC hidraulico RD 26 con campana de 64mm m
221 Tubo PVC hidraulico RD 26 con campana de 51mm m
222 Tubo PVC hidraulico RD 26 con campana de 75mm m
223 Tubo PVC sanitario de 6" m
224 Tubo PVC sanitario de 4" m
225 Tubo PVC sanitario de 3" m
226 Tubo PVC sanitario de 2" m
227 Tubo PVC sanitario de 1 1/2" m
228 Tubo de CPVC de 1" m
229 Tubo de CPVC de 3/4" m
230 Tubo de CPVC de 1/2" m
231 Tubo de cobre de 1" m
232 Tubo de cobre de 3/4" m
233 Tubo de cobre de 1/2" m
234 Tubo de TUBO PLUS 1" m
235 Tubo de TUBO PLUS 3/4" m
236 Tubo de TUBO PLUS 1/2" m
237 Valvula check de 4" de bronce pza
238 Valvula check de 3" de bronce pza
239 Valvula check de 2" de bronce pza
240 Valvula check de 1 1/2" de bronce pza
241 Valvula check de 1 " de bronce pza
242 Valvula check de 3/4" de bronce pza
243 Valvula check de 1/2" de bronce pza
244 Valvula de compuerta de 4" de bronce pza
245 Valvula de compuerta de 3" de bronce pza
246 Valvula de compuerta de 2" de bronce pza
247 Valvula de compuerta de 1 1/2" de bronce pza
248 Valvula de compuerta de 1" de bronce pza
249 Valvula de compuerta de 3/4" de bronce pza
250 Valvula de compuerta de 1/2" de bronce pza
251 Valvula de globo de 4" de bronce pza
252 Valvula de globo de 3" de bronce pza
253 Valvula de globo de 2" de bronce pza
254 Valvula de globo de 1 1/2" de bronce pza
255 Valvula de globo de 1" de bronce pza
256 Valvula de globo de 3/4" de bronce pza
257 Valvula de globo de 1/2" de bronce pza
258 Varilla de acero de fy=4200 kg/cm2 kg $19.00
259 Vigueta pretensada de 16 m
260 Vigueta pretensada de 25 m
261 Yeso kg $13.00
1 Alambre de amarre cal. 18 kg $15.86
2 Alambron kg $12.84
3 Arena de mina m3 $160.00
4 Block hueco de 12X20X40 cms pzs $5.60
5 Block hueco de 14X20X40 cms pzs $5.80
6 Block hueco de 15X20X40 cms pzs $6.00
7 Calhidra bulto $46.00
8 Cemento blanco 25 kg bulto $111.00
9 Cemento tipo II CPC bulto $129.00
10 Cimbra play de 1.22mX2.44mX15 mm, 1ra hoja $490.00
11 Cimbra play de 1.22mX2.44mX15 mm, 2da hoja $456.89
12 Clavos de 2 1/2" a 3 1/2" kg $18.00
13 Grava de mina m3 $160.00
14 Ladrillo rojo recocido artesanal 14X5X28 cms pzs $3.30
15 Ladrillo rojo recocido artesanal 14X7X28 cms pzs $3.60
16 Ladrillo rojo recocido artesanal 14X9X28 cms pzs $4.00
17 Malla electrosoldada 6-6 10/10 ml
18 Malla electrosoldada 6-6 6/6 ml
19 Material mejorado mina m3 $140.00
20 Mortero maestro bulto $114.00
21 Poln de 3"X3"X2.50 m pzs $61.22
22 Poln de 3"X3"X3.00 m pzs $89.00
23 Poln de 3.5"X3.5"X2.50 m pzs $84.00
24 Poln de 4"X4"X2.50 m pzs $110.73
25 Poln de 76X76 mm de 2.44 m pzs $70.71
26 Prefabricado de cadena pzs $93.00
27 Prefabricado de castillo pzs $91.00
28 Tabicon 14X10X28 cms pzs $4.00
29 Varilla del No 3 hasta No 6 ton $12,750.00
30 Agua en pipa m3 $35.00
TABLA DE MADERA DE PINO DE 2da PZA $80.00
Concreto fc=100 kg/cm2 cemento normal
No Concepto Unidad Cantidad Costo Importe
1 Cemento portland RN bulto 3 1/2 $125.00 $440.92
2 Arena de banco m3 0.36507937 $160.00 $58.41
3 Grava de banco T.M.A 3/4" m3 0.38095238 $160.00 $60.95
4 Agua potable m3 0.12698413 $0.14 $0.02
Costo directo $560.30
Muro de block hueco a sillar de 15X20X40 cm asentado con mortero cem-arena 1:6
No Concepto Unidad Cantidad Costo Importe
1 Block hueco 15X20X40 cm pza 13 $6.00 $78.00
2 Mortero cem-arena 1:6 m3 0.02418 $810.74 $19.60
Costo directo $97.60 m2
Muro de block hueco a tizon de 15X20X40 cm asentado con mortero cem-arena 1:6
No Concepto Unidad Cantidad Costo Importe
1 Block hueco 15X20X40 cm pza 34 $6.00 $204.00
2 Mortero cem-arena 1:6 m3 0.10064 $810.74 $81.59
Costo directo $285.59 m2
Muro de block hueco a sillar de 14X20X40 cm asentado con mortero cem-arena 1:6
No Concepto Unidad Cantidad Costo Importe
1 Block hueco 14X20X40 cm pza 13 $6.00 $78.00
2 Mortero cem-arena 1:6 m3 0.022568 $810.74 $18.30
Costo directo $96.30 m2
Muro de block hueco a tizon de 14X20X40 cm asentado con mortero cem-arena 1:6
No Concepto Unidad Cantidad Costo Importe
1 Block hueco 14X20X40 cm pza 36 $6.00 $216.00
2 Mortero cem-arena 1:6 m3 0.10368 $810.74 $84.06
Costo directo $300.06 m2
Muro de block hueco a sillar de 12X20X40 cm asentado con mortero cem-arena 1:6
No Concepto Unidad Cantidad Costo Importe
1 Block hueco 14X20X40 cm pza 13 $6.00 $78.00
2 Mortero cem-arena 1:6 m3 0.019344 $810.74 $15.68
Costo directo $93.68 m2
Cadena de desplante armado con 4 var. No. 3 y estribos de var. No. 2 @ 18 cm, de 15x20 cm
No. Concepto Unidad Cantidad Costo Importe
1 Var. No. 3 kg 2.236 $12.75 $28.51
2 Var. No. 2 kg 1.12344 $18.00 $20.22
3 Alambre de amarre No. 18 kg 0.2687552 $12.81 $3.44
Costo Directo $52.17 ml
Cadena de cerramiento armado con 4 var. No. 3 y estribos de var. No. 2 @ 18 cm, de 15x25 cm
No. Concepto Unidad Cantidad Costo Importe
1 Var. No. 3 kg 2.236 $12.75 $28.51
2 Var. No. 2 kg 1.28464 $18.00 $23.12
3 Alambre de amarre No. 18 kg 0.2816512 $12.81 $3.61
Costo Directo $55.24 ml
Castillo armado con 4 var. No. 3 y estribos de var. No. 2 @ 15 cm, de 15x15 cm
No. Concepto Unidad Cantidad Costo Importe
1 Var. No. 3 kg 2.236 $12.75 $28.51
2 Var. No. 2 kg 1.07136 $18.00 $19.28
3 Alambre de amarre No. 18 kg 0.2645888 $12.81 $3.39
Costo Directo $51.18 ml
Columna armado con 4 var. No. 6 y estribos de var. No. 3 @ 12 cm extremos y @ 18 cm centro, 2.50
m de altura. De 30x30 cm.
No. Concepto Unidad Cantidad Costo Importe
1 Var. No. 6 kg 22.35 $12.75 $284.96
2 Var. No. 3 kg 12.10794 $12.75 $154.38
3 Alambre de amarre No. 18 kg 2.7566352 $12.81 $35.31
Costo Directo $474.65 pza
Escalera armada con var. No. 3, Lado corto @ 16 cm, lado largo @ 30 cm.
No. Concepto Unidad Cantidad Costo Importe
1 Var. No. 3 kg 6.149 $12.75 $78.40
2 Alambre de amarre No. 18 kg 0.49192 $12.81 $6.30
Costo Directo $84.70 m2
Cantidad Rec 1 m3
Latas Volumen lataVolumen Porcentaje Latas Bultos
2 0.018 0.036 12.6984127 0.12698413 7 3 1/2
5.75 0.018 0.1035 36.5079365 0.36507937 20 2/7
6 0.018 0.108 38.0952381 0.38095238 21 1/6
2 0.018 0.036 12.6984127 0.12698413 7
15.75 0.2835 100 1
Cantidad Rec 1 m3
Latas Volumen lataVolumen Porcentaje Latas Bultos
2 0.018 0.036 14.5454545 0.14545455 8 1/9 4
4.75 0.018 0.0855 34.5454545 0.34545455 19 1/5
5.25 0.018 0.0945 38.1818182 0.38181818 21 2/9
1.75 0.018 0.0315 12.7272727 0.12727273 7 1/9
13.75 0.2475 100 1
Cantidad Rec 1 m3
Latas Volumen lataVolumen Porcentaje Latas Bultos
2 0.018 0.036 16.6666667 0.16666667 9 1/4 4 5/8
4 0.018 0.072 33.3333333 0.33333333 18 1/2
4.5 0.018 0.081 37.5 0.375 20 5/6
1.5 0.018 0.027 12.5 0.125 7
12 0.216 100 1
Cantidad Rec 1 m3
Latas Volumen lataVolumen Porcentaje Latas Bultos
2 0.018 0.036 18.6046512 0.18604651 10 1/3 5 1/6
3.5 0.018 0.063 32.5581395 0.3255814 18 1/9
4 0.018 0.072 37.2093023 0.37209302 20 2/3
1.25 0.018 0.0225 11.627907 0.11627907 6 4/9
10.75 0.1935 100 1
Cantidad Rec 1 m3
Latas Volumen lataVolumen Porcentaje Latas Bultos
2 0.018 0.036 21.6216216 0.21621622 12 6
2.75 0.018 0.0495 29.7297297 0.2972973 16 1/2
3.5 0.018 0.063 37.8378378 0.37837838 21
1 0.018 0.018 10.8108108 0.10810811 6
9.25 0.1665 100 1
Cantidad Rec 1 m3
Latas Volumen lataVolumen Porcentaje Latas Bultos
2 0.018 0.036 16.6666667 0.16666667 9 1/4 4 5/8
2 0.018 0.036 16.6666667 0.16666667 9 1/4 9 1/4
6 0.018 0.108 50 0.5 27 7/9
2 0.018 0.036 16.6666667 0.16666667 9 1/4
12 0.216 100 1
Cantidad Rec 1 m3
Latas Volumen lataVolumen Porcentaje Latas Bultos
2 0.018 0.036 15.3846154 0.15384615 8 5/9 4 2/7
1 0.018 0.018 7.69230769 0.07692308 4 2/7 4 2/7
8 0.018 0.144 61.5384615 0.61538462 34 1/5
2 0.018 0.036 15.3846154 0.15384615 8 5/9
13 0.234 100 1
Cantidad Rec 1 m3
Latas Volumen lataVolumen Porcentaje Latas Bultos
2 0.018 0.036 11.7647059 0.11764706 6 5/9 3 2/7
1 0.018 0.018 5.88235294 0.05882353 3 2/7 3 2/7
12 0.018 0.216 70.5882353 0.70588235 39 2/9
2 0.018 0.036 11.7647059 0.11764706 6 5/9
17 0.306 100 1
Cantidad Rec 1 m3
Latas Volumen lataVolumen Porcentaje Latas Bultos
2 0.018 0.036 25.8064516 0.26 14 1/3 7 1/6
4 0.018 0.072 51.6129032 0.51612903 28 2/3
1.75 0.018 0.0315 22.5806452 0.22580645 12 5/9
7.75 0.1395 100 1.00
Cantidad Rec 1 m3
Latas Volumen lataVolumen Porcentaje Latas Bultos
2 0.018 0.036 20.5128205 0.21 11 2/5 5 5/7
6 0.018 0.108 61.5384615 0.62 34 1/5
1.75 0.018 0.0315 17.9487179 0.18 10
9.75 0.1755 100 1.00
Cantidad Rec 1 m3
Latas Volumen lataVolumen Porcentaje Latas Bultos
2 0.018 0.036 16.6666667 0.17 9 1/4 4 5/8
8 0.018 0.144 66.6666667 0.67 37
2 0.018 0.036 16.6666667 0.17 9 1/4
12 0.216 100 1.00
Cantidad Rec 1 m3
Latas Volumen lataVolumen Porcentaje Latas Bultos
2 0.018 0.036 25.8064516 0.26 14 1/3 7 1/6
4 0.018 0.072 51.6129032 0.51612903 28 2/3
1.75 0.018 0.0315 22.5806452 0.22580645 12 5/9
7.75 0.1395 100 1.00
ml Peso/ml kg
4 0.559 2.236
4.53 0.248 1.12344
0.2687552
ml Peso/ml kg
4 0.559 2.236
5.18 0.248 1.28464
0.2816512
ml Peso/ml kg
4 0.559 2.236
4.32 0.248 1.07136
0.2645888
ml Peso/ml kg
10 2.235 22.35
21.66 0.559 12.10794
2.7566352
ml Peso/ml kg
11 0.559 6.149
0.49192
No. Elementos Concepto UNIDAD
1 CUADRILLA 1 (1 PEON) LIMPIEZA DE TERRENO M2
2 CUADRILLA 1 (1 PEON) DESHIERVE DE TERRENO M2
3 CUADRILLA 1 (1 PEON) EXCAVACION DE SUELO HASTA 20 CMS M3
4 CUADRILLA 1 (1 PEON) TRAZO DE PROYECTO M2
5 CUADRILLA 1 (1 PEON) DEMOLICION DE MUROS BLOCK M2
6 CUADRILLA 1 (1 PEON) DEMOLICION DE MUROS LADRILLO M2
7 CUADRILLA 1 (1 PEON) DEMOLICION DE LOSA HASTA 16 CMS DE ESPESOR M2
DEMOLICION DE CIMIENTO DE CONCRETO ARMADO
8 CUADRILLA 1 (1 PEON) SIN RECUPERACION DE ARMADO M2
DEMOLICION DE APLANADOS DE 2.5 CM DE
9 CUADRILLA 1 (1 PEON) ESPESOR M2
0.75 1.33333333
35 0.02857143
23 0.04347826
6.5 0.15384615
12.5 0.08
12 0.08333333
4.4 0.22727273
2.1 0.47619048
3.9 0.25641026
1.8 0.55555556
11 0.09090909
61.7 0.01620746
9.5 0.10526316
9.5 0.10526316
10.3 0.09708738
6 0.16666667
20.4 0.04901961
130 0.00769231
190 0.00526316
205 0.00487805
220 0.00454545
265 0.00377358
10 0.1
7.5 0.13333333
40.8 0.0245098
40.8 0.0245098
8.14 0.12285012
3.56 0.28089888
15 0.06666667
5.1 0.19607843
11 0.09090909
10 0.1
12 0.08333333
10 0.1
10.5 0.0952381
15.94 0.06273526
17.86 0.05599104
35.71 0.02800336
6 0.16666667
25 0.04
18 0.05555556
33.3 0.03003003
23 0.04347826
12 0.08333333
13 0.07692308
8.4 0.11904762
11.76 0.08503401
40 0.025
22 0.04545455
20 0.05
INTEGRACION DE PRECIO UNITARIO
PARTIDA: PRELIMINARES
CONCEPTO: LIMPIEZA DE TERRENO A MANO, INCLUYE: MANO DE OBRA Y HERRAMIENTA MENOR
UNIDAD: M2
CANTIDAD: 1
MATERIAL
CLAVE DESCRIPCION CANTIDAD UNIDAD PRECIO/UNI IMPORTE
COSTALES 1 PZA $5.00 $5.00
CARGO POR MATERIALES: $5.00
MANO DE OBRA
SALARIO
CLAVE CATEGORIA CANTIDAD UNIDAD REAL IMPORTE
CUA1 CUADRILLA 1 (AYUDANTE) 0.01 JOR $276.91 $2.77
CARGO POR MANO DE OBRA: $2.77
MAQUINARIA Y/O EQUIPO Y EQ. SEGURIDAD
COSTO
CLAVE DESCRIPCION CANTIDAD UNIDAD HORA/DIA IMPORTE
CASCO 1 PZA $1.68 $1.68
CHALECO 1 PZA $2.25 $2.25
GUANTES 1 PAR $0.90 $0.90
CARGO POR MAQUINARIA Y/O EQUIPO, HERRAMIENTA Y EQ. SEGURIDAD: $4.83
A) TOTAL DE COSTO DIRECTO: $12.60
B)COSTO INDIRECTO (30%): $3.78
C) FINANCIAMIENTO (5%): $0.63
D) UTILIDAD (10%): $1.26
E) SUBTOTAL: $18.27
F) CARGOS ADICIANALES (8%): $1.01
G) PRECIO UNITARIO: $19.28
PARTIDA: PRELIMINARES
CONCEPTO: DESHIERVE DE TERRENO A MANO, INCLUYE: MANO DE OBRA Y HERRAMIENTA MENOR
UNIDAD: M2
CANTIDAD: 1
MATERIAL
CLAVE DESCRIPCION CANTIDAD UNIDAD PRECIO/UNI IMPORTE
PARTIDA: PRELIMINARES
CONCEPTO: DESPALME DE TERRENO A MANO, ATAQUE A 20 CMS. DE PROFUNDIDAD INCLUYE: MANO DE
OBRA Y HERRAMIENTA MENOR
UNIDAD: M2
CANTIDAD: 1
MATERIAL
CLAVE DESCRIPCION CANTIDAD UNIDAD PRECIO/UNI IMPORTE
CALHIDRA 3 KG $2.00 $6.00
CARGO POR MATERIALES: $6.00
MANO DE OBRA
SALARIO
CLAVE CATEGORIA CANTIDAD UNIDAD REAL IMPORTE
CUA1 CUADRILLA 1 (AYUDANTE) 0.05747126 JOR $276.91 $15.91
CARGO POR MANO DE OBRA: $15.91
MAQUINARIA Y/O EQUIPO Y EQ. SEGURIDAD
COSTO
CLAVE DESCRIPCION CANTIDAD UNIDAD HORA/DIA IMPORTE
CASCO 1 PZA $1.68 $1.68
CHALECO 1 PZA $2.25 $2.25
GUANTES 1 PAR $0.90 $0.90
CARGO POR MAQUINARIA Y/O EQUIPO, HERRAMIENTA Y EQ. SEGURIDAD: $4.83
A) TOTAL DE COSTO DIRECTO: $26.74
B)COSTO INDIRECTO (30%): $8.02
C) FINANCIAMIENTO (5%): $1.34
D) UTILIDAD (10%): $2.67
E) SUBTOTAL: $38.78
F) CARGOS ADICIANALES (8%): $2.14
G) PRECIO UNITARIO: $40.92
PARTIDA: PRELIMINARES
CONCEPTO: TRAZO DE TERRENO A MANO, INCLUYE: MANO DE OBRA Y HERRAMIENTA MENOR
UNIDAD: M2
CANTIDAD: 1
MATERIAL
CLAVE DESCRIPCION CANTIDAD UNIDAD PRECIO/UNI IMPORTE
CALHIDRA 6 KG $2.00 $12.00
MADERA DE PINO DE 2da. 1 PZAS $61.00 $61.00
CUERDA 1 ROLLO $25.00 $25.00
CLAVO DE 3" 0.25 KG $16.38 $4.10
CARGO POR MATERIALES: $102.10
MANO DE OBRA
SALARIO
CLAVE CATEGORIA CANTIDAD UNIDAD REAL IMPORTE
CUA1 CUADRILLA 1 (AYUDANTE) 0.01 JOR $276.91 $2.77
CARGO POR MANO DE OBRA: $2.77
MAQUINARIA Y/O EQUIPO Y EQ. SEGURIDAD
COSTO
CLAVE DESCRIPCION CANTIDAD UNIDAD HORA/DIA IMPORTE
CASCO 1 PZA $1.68 $1.68
CHALECO 1 PZA $2.25 $2.25
GUANTES 1 PAR $0.90 $0.90
CARGO POR MAQUINARIA Y/O EQUIPO, HERRAMIENTA Y EQ. SEGURIDAD: $4.83
A) TOTAL DE COSTO DIRECTO: $109.69
B)COSTO INDIRECTO (30%): $32.91
C) FINANCIAMIENTO (5%): $5.48
D) UTILIDAD (10%): $10.97
E) SUBTOTAL: $159.06
F) CARGOS ADICIANALES (8%): $8.78
G) PRECIO UNITARIO: $167.83
PARTIDA: DEMOLICIONES
CONCEPTO: DEMOLICON DE MURO DE BLOCK A MANO, INCLUYE: MANO DE OBRA Y HERRAMIENTA
MENOR
UNIDAD: M2
CANTIDAD: 1
MATERIAL
CLAVE DESCRIPCION CANTIDAD UNIDAD PRECIO/UNI IMPORTE
PARTIDA: DEMOLICIONES
CONCEPTO: DEMOLICON DE MURO DE LADRILLO A MANO, INCLUYE: MANO DE OBRA Y HERRAMIENTA
MENOR
UNIDAD: M2
CANTIDAD: 1
MATERIAL
CLAVE DESCRIPCION CANTIDAD UNIDAD PRECIO/UNI IMPORTE
PARTIDA: ALBAILERIA
CONCEPTO: HABILITADO DE ANDAMIO SIMPLE DE 0.20 MTS HASTA 2.00 MTS, CON MADERA DE PINO DE
2do.
UNIDAD: PZS
CANTIDAD: 1
MATERIAL
CLAVE DESCRIPCION CANTIDADUNIDAD PRECIO/UNI IMPORTE
TABLA DE 2.50x0.28x0.02 MTS 1 PZA $80.00 $80.00
Poln de 3"X3"X2.50 m 5 PZA $61.22 $306.10
CLAVO DE 2" 0.125 KG $18.00 $2.25
CLAVO DE 3" 0.065 KG $18.00 $1.17
CARGO POR MATERIALES: $389.52
MANO DE OBRA
SALARIO
CLAVE CATEGORIA CANTIDAD UNIDAD REAL IMPORTE
CUADRILLA 6 (Oficial carpintero de obra
CUA1 negra+ayudante) 0.07 JOR $602.10 $42.15
CARGO POR MANO DE OBRA: $42.15
MAQUINARIA Y/O EQUIPO Y EQ. SEGURIDAD
COSTO
CLAVE DESCRIPCION CANTIDAD UNIDAD HORA/DIA IMPORTE
CASCO 1 PZA $1.68 $1.68
CHALECO 1 PZA $2.25 $2.25
GUANTES 1 PAR $0.90 $0.90
CARGO POR MAQUINARIA Y/O EQUIPO, HERRAMIENTA Y EQ. SEGURIDAD: $4.83
A) TOTAL DE COSTO DIRECTO: $436.50
B)COSTO INDIRECTO (30%): $130.95
C) FINANCIAMIENTO (5%): $21.82
D) UTILIDAD (10%): $43.65
E) SUBTOTAL: $632.92
F) CARGOS ADICIANALES (8%): $34.92
G) PRECIO UNITARIO: $667.84
PARTIDA: ALBAILERIA
CONCEPTO: HABILITADO DE MURO DE BLOCK HUECO DE 14X20X40 CMS, DE 0.00 HASTA 2.00 MTS,
ASENTADO CON MORTERO CEM-AREANA 1:6, INCLUYE: MANO DE OBRA, MATERIAL Y TODO
LO NECESARIO PARA SU CORRECTA EJECUCION.
UNIDAD: M2
CANTIDAD: 1
MATERIAL
CLAVE DESCRIPCION CANTIDAD UNIDAD PRECIO/UNI IMPORTE
PARTIDA: ALBAILERIA
CONCEPTO: HABILITADO DE MURO DE TABLAROCA A DOS CARAS 2.44 MTS ALTURA, ACABADO COMUN,
INCLUYE: MANO DE OBRA, MATERIAL, HARRAMIENTA MENOR Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.
UNIDAD: M2
CANTIDAD: 1