What is the ERI and how does it work? which are tied to the plants processes that could be created for that industry. For ex-
The ERI is the Equipment Reliability In- are required for safe and reliable operation. ample, the process could be a corrective
dex. Its a metrica performance indica- An ERI involves defining key plant pro- maintenance program at a nuclear plant, or
torused for gauging equipment reliabil- cesses that must work effectivelysuch as a widget-production facility at a processing
ity. The ERI could be used to measure work management, maintenance effective- plant. Its just a matter of defining
performance at one specific plant but also ness, long-range planning, etc.and then processesthose that are required to oper-
for a whole fleet of plants. That means that identifying a metric that depicts the effec- ate properlyand then developing a metric
each plant in the fleet could have an ERI, tiveness of each process. for each process. The sum of the weighted
and those ERIs could be compared from The ERI is not tied specifically to the nu- defining process metrics is the ERI.
site to site to a common set of parameters. clear industry. If there is a defined set of
These parameters consist of what are processes that are required to function prop- Which nuclear plants are using an ERI?
called lagging or leading subindicators, erly for satisfactory performance, an ERI Most sites in the United States use it in
28 N U C L E A R N E W S October 2005
Interview: Davis
some form or fashion. Some ERIs are called ERI Subindicators Industry ERI Count (15)
Plant Health Indexes, for example, while Corrective Maintenance Backlog (non-outage) 14
others are called Critical Component
Forced Loss Rate/UCLF 12
Clocks that reset when a critical component
fails. [Critical component as defined by System Health 9
INPO AP-913. The AP-913 describes an Safety System Availability 8
equipment reliability process to assist plants Unplanned LCO Entries (SD) 7
in maintaining high levels of safe and reli-
Equipment-related Power Reductions 6
able operation in an efficient manner.]
Whatever the name, each individual ERI Operator Work Arounds 6
consists of a certain number of subindica- Deferred Preventive Maintenance Activities 5
tors. The lowest number of subindicators Maintenance Rule System Performance (FF)/MPFF 5
used in the industry is five, while others Preventive Maintenance Program 5
have used as many as 20.
Unplanned SCRAMS 5
What is a lagging subindicator? Unit Capability Factor 5
Lagging is a reflection of something
ERIs used in the industry track a variety of equipment reliability subindicators, the most
that has already occurred. For example, it
popular one being for corrective maintenance backlog, tracked by 14 of 15 plants surveyed
could be a plants electrical generation or
by the ERWG.
force loss rate for a specific period of
time. The plant could assign a metric to the process being measured that decides By using the work management process
each one of those subindicators so that whether its leading or lagging. For exam- defined by INPO AP-928, a corrective
performance could be monitored. These ple, using a subindicator for corrective maintenance work issue could normally
specific parameters represent the outcome maintenance backlog, if a plant has a met- take 13 weeks to process through the sys-
of specific key processes required to sup- ric that monitors the average age of correc- tem, and, therefore, the average age of the
port satisfactory performance and are tive maintenance, then this indicator is lead- backlog should be about 90 days. If the av-
therefore lagging. ing. If, on the other hand, the plant is erage age of a specific backlog is 250 days,
monitoring the number of corrective main- then analysis should be performed to deter-
What is a leading subindicator? tenance work items in the backlog, then the mine the whys behind the backlog.
Leading or lagging has to do with the in- subindicator would be lagging, since the ef-
formation that is being portrayed by that fectiveness of a plants processes cannot be Who inputs the information into the ERI?
subindicator. It all depends on the status of described by a bulk number. Continued
October 2005 N U C L E A R N E W S 29
Plant Maintenance Special Section
0.8
0.6
0.4
0.2
0
04
04
04
05
05
05
05
06
06
06
06
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
30 N U C L E A R N E W S October 2005
Interview: Davis
How does an ERI forecast future perfor-
mance?
Some of the specific leading subindica-
tors give intelligence that can be acted upon
immediately to improve performance.
Other leading and lagging subindicators
must be trended to gain intelligence. I will
use Preventive Maintenance (PM) Defer-
rals, a lagging indicator, as an example. One
month, a plant may have to defer a PM past
its late date to allow more urgent work to
be performed. The next month, several
other items are deferred, and the trend con-
tinues for months afterward. The one
months data point may not be significant,
but several months may indicate a problem
with the plants ability to manage workload.
The problem then needs to be acted upon
because deferring PMs can lead to negative
plant performance.
October 2005 N U C L E A R N E W S 31
Plant Maintenance Special Section Interview: Davis
ticipating, equipment issues before they PM late date. The risk of component fail- What does the future hold for the ERI pro-
occur. ure increases as the PM late date draws gram?
nearer. An effort to reduce elective main- Right now, the ERWG is looking at pro-
What are the strengths of the ERI program? tenance backlog may result in an adverse viding a standard set of subindicators that
The strengths are that it provides infor- trend in the management of the PM grace all plants could use to provide data so they
mation for management to take action be- period that increases risk of failures. The can be gauged against each other. The
fore any particular process can negatively ERI would provide information needed to ERWG will call it the ERI Estimator, con-
affect plant performance. For instance, a identify the cause of unanticipated equip- sisting of 20 subindicators with specified
plant may decide to reduce a large Elec- ment failures and trigger actions to prevent goals for ranking a plants health in each
tive Maintenance Backlog. Ill define elec- recurrence. area. [The ERI Estimator was scheduled to
tive maintenance as those components that be presented at the Equipment Reliability
are degraded, but not to the point where Does the ERI have limitations? Forum taking place in Nashville, Tenn.,
they are considered unable to satisfy their Any performance metric has limita- September 1920, 2005.]
design functions. The ERI may include a tions. If a plant manages the indicator and
subindicator for PMs in the grace period, not the underlying issues, then it will not Was there a pilot program to test the ERI
i.e., PMs past their due date, but before the be effective. initiative?
Yes, there was, and its still ongoing as
we speak. The pilot program has participa-
tion from plants operated by various utili-
ties: Entergy, Dominion, Nuclear Manage-
ment Company, Florida Power & Light,
Exelon, and also some plants involved with
the Utilities Service Alliances Strategic
Teaming and Resource Sharing (STARS)
initiative, among others. People from those
utilities pulled the industry ERI data to-
gether and turned it over to the ERWG for-
mally to issue a standardized ERI. The pi-
lot started in 2004.
32 N U C L E A R N E W S October 2005