Guangarcucho 2050
SECONDARY CLARIFIER
Recycle ratio fraction of Q Rs 1.01
Area of secondary clarifier m2 Ased 5196.08
Total suspended solids load Kg TSS/m2/h CSOLs 51.30
Volume of secondary clarifier m3 Vols 23382.35
Nominal retention period in clarifier hours TRS 5.29
Return sludge Pump HP HP HPS 7.12
Volume of sludge to be wasted from the reactor m3/day VL1s 7034.00
Height of aeration tank to be drained m HLs 2.62
GRAVITY SLUDGE THICKENER
Total suspended solids load to thickeners Kg SST/day CSOLes 51.30
Area of thickeners m2 Athis 14150.47
Volumen of thickeners m3 Ves 70752.35
Nominal retention time of thickeners hours TREs 241.41
SOLAR SLUDGE DRYING BEDS
Sludge volume to drying beds m3/days VL2s 9504.05
Anual volume of sludge to dry m3/year VL3s 2376011.70
Area od drying beds m2 Als 586669.60
Performance of drying beds Hab/m2 HAM2s 182.07