Sunteți pe pagina 1din 3
SITE ACCEPTANCE TEST FORMAT FOR COMMON ALARM PANEL DC CHANGE OVER SCHEME CHECKS retienr: ‘CONSULTANT: WAIN CONTRACTOR: | " ENERGOPROJEKT 1] cam Bin Ue esilatate —e! ME | [cnt SIEMENS. as ‘QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. GICI643N2014 | PHASE 12 SUBSTATIONS ~ PACKAGES St, S2, 86 & $7 Date 0310572017 | [Name of Substation 1132/66/11 kV WAKRAH REPLACEMENT Bay Number ‘CAP [Name of Equpment = CAP Manufacturer SIEMENS List of Content S.No Description Page No 1 Purpose of Test. es (nha amare ‘ 2 2. Reference Drawing and Documents... 2 3. Initial Checks, seosimnnninnnnnninninn 2 4, Ust of Schematic Drawings. 2 5. DC Change Over Scheme Checks .. s 6 Instruments Used nnientnmnnenen sins — 4 7 Remarks..... * SIEMENS: ENERGOPROJEKT-ENTEL/KAHRAMAA Signature Me BAN Signature AE Name. _ M.BALAMURURGAN ee Name Mr. SALEEM“ =| Date | 03105/2017 - Date 03/05/2017 Doo.No. PH12-3A-10-40-P036 Rev. o Annexure 1 Page No. | of 3 ENERGOPROJEKT ee iE pee erecta | SIEMENS ‘QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 12 SUBSTATIONS — PACKAGES $1, 82, S6 & S7 Name of Substation 1192/68/11 KV WAKRAH REPLACEMENT Name of Equipment CAP 1. PURPOSE OF TEST: [Contract No. [Bay Number [Manufacturer SIEMENS ‘These tests are intended to check the Change over Contactor Healthiness, Healthiness of relay & ‘Supervision relay Checks. 2. REFERENCE DRAWING AND DOCUMENTS : Electrical drawing for Common alarm panel B.INITIAL CHECKS: 11KV alarm & Common alarm Panel Bus Wiring Tightness/Ferrules Checked L1KV alarm & Common alarm Panel Bus Wiring Checked as per approved scheme All relevant equipment Type, rating and labelling checked as per approv 4,LIST OF SCHEMATIC DRAWINGS: Common alarm panel Drawing Drawing No. PH12-3A-10-40-1005-RB Checked (1) led Scheme: Category SIEMENS ENERGOPROJEKT-ENTELIKAHRAMAA ——_| Signature N. dn Signature ate Name _M.BALAMURURGAN Nemo Mr.SALEEM<{_ | Date 0310872017 Date 03105/2017 Doo. No. PH12-3A-10-40-PO36 _| Rev. 0 Annevure | 1 Page No 20f3 | | SITE ACCEPTANCE TEST FORMAT FOR COMMON ALARM PANEL DC CHANGE OVER SCHEME CHECKS ce CONSULTANT AT CONTRRCTOR: ie peo ENERGOPROJEKT | wee ae ee VA tome | SIEMENS QATAR POWER TRANSMISSION SYSTEM EXPANSION ‘Contract No. GTCI643AN2014 L PHASE 12 SUBSTATIONS ~ PACKAGES $1, $2, 86 & S7 Date 2 03/052017 Name of Substation 132/86/11 KV WAKRAH REPLACENENT Bay Number CAP, Name of Equipment CAP Manufacturer = SIEMENS 5, DC CHANGEOVER CIRCUIT CHECKS: OC Source status Common Alarm Panel Remarks oci-orF | c2-oFF aa ss Be Kat Drop Out ow oct-on | 0¢2-0FF A204 on = Kit Pick up ok ocrorr | oc2-0n Azan ou }__olé Kit Drop Out oK en ee ‘ON oe peon | ocz0N Fe au |e Note: DC Source! from DCDB Bus 1 DC Source 2 from DCDB Bus 2 Confirm DC-1 and DC-2 supply healthy 6. INSTRUMENT USED: | S.No | Equipments] Make | S.No Calibration date Calibration due date 1 Pita ruuxe | 21160142 23 Nov 2016 22 Nov 2017 + | satimeter F 7. Remarks: Circuit found Healthy YES/NO SIEMENS ENERGOPROJEKT-ENTELIKAHRAMAA Signature M. pA Slonature RE Name M.BALAMURURGAN Namo Mr. SALEEM-{ Date 03/08/2017 Date 3108/2017 Doce. 10-40-PO36 Rev 0‘ Awrenre [1 Page No 3 0f3 |

S-ar putea să vă placă și