2.1 General
- All Shims for steelwork, Equipment (including shims for rotating
equipment), and pipe supports.
- All consumables for the execution of the work including:
Welding Rods, Gases.
- All oils, grease, paint, inhibitors, sheet metal blinds and all
other materials necessary for preventative maintenance.
2.2 Fireproofing
- Fireproofing Reinforcement.
- Fireproofing Concrete.
2.3 Grouting
- Concrete Infill.
2.4 Piping
- All materials for testing pipe including temporary piping,
blinds, flanges and make up pieces.
- Pipe for welder qualification outside Nigeria.
2.8 General
- Cement mix, aggregate, sand, inhibitors (as applicable),
formwork, release agents, burlap sacking and weather protection materials, Joint
Filler and Sealer materials, Bituthene Sheeting.
Notes
a) Underground GRVE piping will be free-issued, pre-spooled with mechanical
couplings in the field (essentially straight runs). Spool lengths will be 12LM
maximum.
b) Underground carbon steel piping will be free-issued as bulk pipe, fittings,
flanges, weldolets etc, for site fabrication by SUBCONTRACTOR. Straight pipe will
be coated and wrapped by the supplier. All testing, coating and wrapping of
weld joints and fittings and all repairs will be by SUBCONTRACTOR.
c) Quantities of steel reinforcement bars, anchor bolts and metal inserts free-
issued by CONTRACTOR will be sufficient for Scope of Work. Costs of additional
materials necessary for reasons attributable to SUBCONTRACTOR wastage,
rework, loss or other default by SUBCONTRACTOR will be to SUBCONTRACTORs account.