NGI-15-790 CONSTRUCTION OF New HAS Internation School Building IN SUR

Master Query List

Date : 30.05.2016 Query No.1 Clarification No.

SN Company Tender Doc Document/ Meeting ref Query Description Query Answer

1 Teejan Please provide the drawing No. 150063-NEO-SB-307-004-Main single line


Diagram-1 R0

2 Teejan Please provide the drawing No. 150063-NEO-SB-307-005-Main Single Diagram-2


R0

3 HFP Finishes Schedule Drawing No. LNA-900 & The finishes F-01 to F-17 is mentioned in the finishes schedule. Only Purchase
BOQ Page 5/16 Item A Cost (PC) rate for the finishing item F5 is mentioned in the BOQ. As the cost of
these items may vary in the market very much, we request you to issue a PC rate
for the finishing items.

Page No. 10 of 53, Clause 6 Interior Design The classrooms have vinyl mural wall finish up to 1.40m height and approved
Work Item (a) & Drawing No. LNA-900 painting system 200mm above false ceiling. The drawing indicates KG classroom
walls have vinyl wall features up to 1.40m level with multi-coloured vinyl patterns,
Blocks & Anfles. This similar finish is applicable to the corridor walls. We
4 HFP
understand that this is not a part of our contract as Mural painting is done by
specialist artists. Please instruct.

5 HFP Bill No. 4 Page No. 4/9 Item A to C In the BOQ the superstructure Reinforcement steel quantity is wrongly typed.
Please instruct

6 HFP Drawings Please issue us the AutoCAD drawings for quantity take-off, preparation & pricing
of BOQ.

7 HFP Bill of Quantities Please issue us the BOQ in MS Excel format without any password protection in
order to price for the same with quantities as per the drawings.

8 HFP Fire Fighting and Fire Alarm Drawings Please issue us the Fire Policy (Fire Alarm and Fire Fighting) drawings for Guard
Room, Driver Room and Service Yard.

HFP Page No. ME-122, Clause 6 Section 1.5 The specification calls for FM 200 System. There are no drawings or BOQ issued
9 Scope of Works for this system along with the tender. Please advise.

10 HFP Page ME-134/135, Section 4.0-Fire Water Pump The fire pump capacity indicated in the specifications is 600gpm electric and
set, 4.1-General Clause 4. And Drg No. diesel drive with 42LPH Jockey pump. The drawing indicates Fire pump
150063-NEO-SP-600-001 (1E+1D+1J) capacity of 750gpm @ 8bar. Please advise.

11 HFP Drg. No. 150063-NEO-SY-301-002 The drawing shows 4 Nos. Chilled Water Primary Pumps whereas the HVAC
schedule indicates 3 Nos. Please advise.

12 HFP Drg. No. 150063-NEO-SB-307-004 & 150063- The Main Single Line Diagram is not available along with the tender documents.
NEO-SB-307-005 Please issue us the same.

13 HFP Section D - Page No. 10 of 53 Clause 5.b The scope of work describes that CONTRACTOR should refer to the detailed
drawings, scope of works, BOQ, Specifications and tender documents.contd,
there are no details available in the BOQ, specification or drawings issued along
with the tender. Please confirm that whether the LED based SSLS system is in
the Main Contractors scope of work. If yes please issue us the necessary details.
NGI-15-790 CONSTRUCTION OF New HAS Internation School Building IN SUR

Master Query List

Date : 30.05.2016 Query No.1 Clarification No.

SN Company Tender Doc Document/ Meeting ref Query Description Query Answer
14 HFP Drawing No. 150063-NEO-LNG-S-2201 The details regarding the Multipurpose Hall Stage are given in the Structural
Multipurpose Hall Stage Details drawing. The item is not reflected in the BOQ for Main School Building. Please
instruct.

15 HFP Bill of Quantities Bill No. 2 Kitchen There are no details (setting-out plan / schedule of equipment / specifications)
Equipment available for kitchen along with the tender documents. Please confirm whether it
is under Main Contractors scope of work. If yes, please issue us the above
mentioned details.

16 UCC Please provide CAD drawings for all the Architectural, Structural and MEP work
etc under the Contractor scope.

17 UCC As per BOQ-1 external work, within the plot boundary is shown as provisional,
kindly clarify.

18 UCC Screen for external faade (SCR-01) KINDLY REFER DRAWING No.LNG-A-204
showing screen. Kindly provide its detail drawing showing the material and its
fixation.

19 UCC Please provide the type of textile used for canopy in Sheded Play Area and Bicycle
Stand

20 UCC Kindly provide the landscape drawing and detail BOQ,showing the type of trees
and quantity