27-Feb-12 MS/MEP/EL/36 CC TV System - "SAMSUNG" M/s Samsung M/s Al Shuaib Electronics LLC 26-Feb-12 17-Mar-12 N.A Rejected
17-Mar-12 MS/MEP/EL/38 CC TV System - "CP Plus" M/s CP Plus M/s Acsys Control system 17-Mar-12 17-Mar-12 AAN For comments See the submittal
Intercom System
Light Fittings
27-Mar-12 MS/MEP/EL/39 Mirror Light - IVL M/s Noria Lighting Co. 27-Mar-12
27-Mar-12 MS/MEP/EL/40 External Wall Bracket Light - Noria M/s Noria Lighting Co. M/s Noria Lighting Co. 27-Mar-12
27-Mar-12 MS/MEP/EL/41 Staircase Wall Bracket Light M/s Noria Lighting Co. 27-Mar-12
1/4
Consultant Returned
Submittal Manufacturer/ Brand
S.I. Date Ref. No. Description Supplier / Remarks Receiving Date from Status Comments
Name Date Consultant
Legend: APP - Approved NA - Not Approved, Resubmit AW- Awaiting for Comments
AAN - Approved Except As NotedFI - for information and record IR - Incomplete, Resubmit
2/4
Al Hamra
Construction Co. LLC
Plumbing
3-Mar-12 MS/MEP/PL/30 Water Meter - LIANLI (PD97TRP) Imperial Gallon M/s Dutco Tenant LLC M/s Dutco Tenant LLC 3-Mar-12 3-Mar-12 AAN Provide Sample for final approval
10-Mar-12 MS/MEP/PL/30R1 Water Meter - LIANLI (PD97TRP) - Sample M/s Dutco Tenant LLC M/s Dutco Tenant LLC 11-Mar-12 11-Mar-12 APP
7-Mar-12 MS/MEP/PL/31 Shataff Set - RAK 32005 (Sample Only) M/s Kludi RAK M/s Kludi RAK 7-Mar-12 11-Mar-12 APP
Drainage System
Fire fighting
Fire Fighting System & Equipments - BRISTOL
11-Mar-12 MS/MEP/FF&FA/10R1 M/s BRISTOL Fire Engineering M/s BRISTOL Fire Engineering 11-Mar-12
(Samples)
Legend: APP - Approved NA - Not Approved, Resubmit AW- Awaiting for Comments
AAN - Approved Except As NotedFI - for information and record IR - Incomplete, Resubmit
3/4
Al Hamra
Construction Co. LLC
RE-CI-02A Coordination Drawing For 2nd To 7th Floor Reflected Ceiling layout N.A
RE-CI-03A Coordination Drawing For 8th To 12th Floor Reflected Ceiling layout N.A
RE-CI-02 Coordination Drawing For 2nd To 7th Floor Reflected Ceiling layout N.A
RE-CI-03 Coordination Drawing For 8th To 12th Floor Reflected Ceiling layout N.A
3 19-Mar-12 A6 003 CO-02 MEP Coordination Drawing for 1st Floor High Level Layout 19-Mar-12 24-Mar-12 AAN (1.Update the Architecture Drawing.
MEP Coordination Drawing for 2nd To 4th,11th & 12th Floor High Level 2.Three Washing Machines are in the
CO-04
Layout AAN Laundry)
CO-06 MEP Coordination Drawing for 5th To 10th Floor High Level Layout AAN
4 19-Mar-12 A5 004 CO-01 MEP Coordination Drawing for 1st Floor High Level Layout 19-Mar-12 24-Mar-12 AAN (1.Update the Architecture Drawing.
MEP Coordination Drawing for 2nd To 4th,11th & 12th Floor High Level 2.Three Washing Machines are in the
CO-03
Layout AAN Laundry)
CO-05 MEP Coordination Drawing for 5th To 10th Floor High Level Layout AAN
Legend: APP - Approved As Noted NA - Not Approved, Resubmit AW- Awaiting for Comments
AAN - Approved Except As Noted FI - for information and record IR - Incomplete, Resubmit
4/4