Al Hamra

Construction Co. LLC

Project RAKIA Accommodation (G+12 Bldgs.) 4nos. A3,A4,A5 & A6

MEP- ELECTRICAL MATERIAL SUBMITTAL LAST UPDATED: 25/Oct/2017


Consultant Returned
Submittal Manufacturer/ Brand
S.I. Date Ref. No. Description Supplier / Remarks Receiving Date from Status Comments
Name Date Consultant
Electrical
The meter should be with electric interface Point
5-Mar-12 MS/MEP/EL/32 KWH Meter -3Phase "ELSTER-A1350" (For A3&A4) M/s Elster Metering System M/s Elster Metering System 6-Mar-12 14-Mar-12 AAN
(RS232 or RS485)

27-Feb-12 MS/MEP/EL/36 CC TV System - "SAMSUNG" M/s Samsung M/s Al Shuaib Electronics LLC 26-Feb-12 17-Mar-12 N.A Rejected

The Meter should be with electrical interface unit


5-Mar-12 MS/MEP/EL/37 KWH Meter -1Phase "ELSTER-A220" (For A3&A4) M/s Elster Metering System M/s Elster Metering System 6-Mar-12 14-Mar-12 AAN
Rs232 or Rs485.

17-Mar-12 MS/MEP/EL/38 CC TV System - "CP Plus" M/s CP Plus M/s Acsys Control system 17-Mar-12 17-Mar-12 AAN For comments See the submittal

Intercom System

Light Fittings

27-Mar-12 MS/MEP/EL/39 Mirror Light - IVL M/s Noria Lighting Co. 27-Mar-12

27-Mar-12 MS/MEP/EL/40 External Wall Bracket Light - Noria M/s Noria Lighting Co. M/s Noria Lighting Co. 27-Mar-12

27-Mar-12 MS/MEP/EL/41 Staircase Wall Bracket Light M/s Noria Lighting Co. 27-Mar-12

Earthing and lighting protection

Fire Alarm System


M/s Najd Electricals & safety
12-Feb-12 MS/MEP/F.F&F.A/11 Fire Resistanct Cable - JST BS6387 M/s JST Fire Cable 12-Feb-12 3-Mar-12 APP
Equipments
Approved for the brand but you have to submit
M/s Edwards System following. 1. I/O modules devices sample. 2. All
15-Feb-12 MS/MEP/F.F&F.A/12 Addressable Fire Alarm system-EST M/s Al Arabia Safety & Security 15-Feb-12 27-Feb-12 AAN
Technology digital addressables (smoke,heat,sounder..etc)
sample

M/s Edwards System


11-Mar-12 MS/MEP/F.F&F.A/12R1 Addressable Fire Alarm system-EST -Sample Board M/s Al Arabia Safety & Security 11-Mar-12
Technology
28-Feb-12 MS/MEP/F.F&F.A/13 Emergency Light System -"SHEILD" M/s Sheild M/s Naffco 28-Feb-12 29-Feb-12 AAN Submit Sample for Final Approval

Central Battery System

1/4
Consultant Returned
Submittal Manufacturer/ Brand
S.I. Date Ref. No. Description Supplier / Remarks Receiving Date from Status Comments
Name Date Consultant

Gate Barrier System

Garbage Chute System


Garbage Chute System- (Company Profile,Technical
11-Mar-12 MS/AHCC/64 M/s Royal Steel Works M/s Royal Steel Works 11-Mar-12 11-Mar-12 AAN No PVC Junction Boxes to be there
Data&Samples)

Legend: APP - Approved NA - Not Approved, Resubmit AW- Awaiting for Comments
AAN - Approved Except As NotedFI - for information and record IR - Incomplete, Resubmit

2/4
Al Hamra
Construction Co. LLC

Project RAKIA Accommodation (G+12 Bldgs.) 4nos. A3,A4,A5 & A6

MEP - PLUMBING MATERIAL SUBMITTAL LAST UPDATED: 25/Oct/2017


Consultant Returned
Submittal Manufacturer/ Brand
S.I. Date Ref. No. Description Supplier / Remarks Receiving Date from Status Comments
Name Date Consultant

Plumbing
3-Mar-12 MS/MEP/PL/30 Water Meter - LIANLI (PD97TRP) Imperial Gallon M/s Dutco Tenant LLC M/s Dutco Tenant LLC 3-Mar-12 3-Mar-12 AAN Provide Sample for final approval
10-Mar-12 MS/MEP/PL/30R1 Water Meter - LIANLI (PD97TRP) - Sample M/s Dutco Tenant LLC M/s Dutco Tenant LLC 11-Mar-12 11-Mar-12 APP
7-Mar-12 MS/MEP/PL/31 Shataff Set - RAK 32005 (Sample Only) M/s Kludi RAK M/s Kludi RAK 7-Mar-12 11-Mar-12 APP

Drainage System

Fire fighting
Fire Fighting System & Equipments - BRISTOL
11-Mar-12 MS/MEP/FF&FA/10R1 M/s BRISTOL Fire Engineering M/s BRISTOL Fire Engineering 11-Mar-12
(Samples)

Legend: APP - Approved NA - Not Approved, Resubmit AW- Awaiting for Comments
AAN - Approved Except As NotedFI - for information and record IR - Incomplete, Resubmit

3/4
Al Hamra
Construction Co. LLC

Project Name: RAKIA Accommodation (G+12 Bldgs.) 4nos. A3,A4,A5 & A6

MEP - CO ORDINATION DRAWINGS SUBMITTAL LAST UPDATED: 25/Oct/2017


Returned
Submittal Propas Consultant
S.I. Date
Bldg. no.
al. no.
Drwg. Ref. No. Description Receiving Date
Date from Status Comments
Consultant
Coordination layout
Submit High Level Coordination First for
1 14-Mar-12 A6 001 E-CO-ER-151-0000-A6 Coordination Drawing For 1st Floor Reflected Ceiling layout N.A
14-Mar-12 17-Mar-12 MEP

RE-CI-02A Coordination Drawing For 2nd To 7th Floor Reflected Ceiling layout N.A

RE-CI-03A Coordination Drawing For 8th To 12th Floor Reflected Ceiling layout N.A

Resubmit We need High Level


2 14-Mar-12 A5 002 E-CO-ER-151-0000-A5 Coordination Drawing For 1st Floor Reflected Ceiling layout 14-Mar-12 17-Mar-12 N.A
Coordination First for MEP

RE-CI-02 Coordination Drawing For 2nd To 7th Floor Reflected Ceiling layout N.A

RE-CI-03 Coordination Drawing For 8th To 12th Floor Reflected Ceiling layout N.A

3 19-Mar-12 A6 003 CO-02 MEP Coordination Drawing for 1st Floor High Level Layout 19-Mar-12 24-Mar-12 AAN (1.Update the Architecture Drawing.
MEP Coordination Drawing for 2nd To 4th,11th & 12th Floor High Level 2.Three Washing Machines are in the
CO-04
Layout AAN Laundry)
CO-06 MEP Coordination Drawing for 5th To 10th Floor High Level Layout AAN
4 19-Mar-12 A5 004 CO-01 MEP Coordination Drawing for 1st Floor High Level Layout 19-Mar-12 24-Mar-12 AAN (1.Update the Architecture Drawing.
MEP Coordination Drawing for 2nd To 4th,11th & 12th Floor High Level 2.Three Washing Machines are in the
CO-03
Layout AAN Laundry)
CO-05 MEP Coordination Drawing for 5th To 10th Floor High Level Layout AAN

Legend: APP - Approved As Noted NA - Not Approved, Resubmit AW- Awaiting for Comments
AAN - Approved Except As Noted FI - for information and record IR - Incomplete, Resubmit