A B C D E F LEGEND:

G
BPE -SPRAY CONTROL VALVE

BP-BYPASS CONTROL VALVE

BP-1 BP-2 BD-ISOLATION VALVE

OSU-OIL SUPPLY UNIT

A-ACCUMULATOR

H B-QUICK OPENING DEVICE


MS LINE MS LINE
C-CONNECTING MANIFOLD

D-BLOCKING ELEMENT

TO CRH LINE

TO CRH LINE
FROM BPE-1 E-SERVO VALVE

SPRAY WATER FROM


BFP DISCHARGE
FROM BPE-2
I F-THROTTLING VALVE
SPRAY WATER FROM
ISOLATING VALVE G-ISOLATING VALVE
SPRAY WATER FROM
ISOLATING VALVE J H-HP FILTER

I-BREAK DOWN ORIFICE

J-FEED BACK POSITION TRANSMITTER

K-UNEQUAL TEES

L-REDUCES
BPE-1 BD BPE-2 K M-STOP CHECK VALVE

N-ELECTRIC MOTOR

O-PIPE BEND 90 Deg.

Pr-PRESSURE GAUGE

N
Pr
Pr

LTP LTP O

OIL
NTPC VINDHYACHAL STPP STAGE-III 2 X 500 MW
OSU PIPING FOR HPBYPASS SYSTEM ( TYPICAL)
OSU

L DRG .NO.PW:TSX:SAF:02:00
DRAWN CHECKED APPROVED DATED