Sunteți pe pagina 1din 4

NAMA : YOGI MULYADI

NO BP : 1710003433012
KELAS : D

TUGAS BAHASA INGGRIS

TASK 1.

B: What is being described ? Choose from the words on the


opposite page.
1. This stucture is built across a river to hold back the water to produce
power,improve navigation or control
flooding. (DAM)

2. This structure is built along the banks of a river or along the coast to hold back
water and prevent flooding. (DIKE)
3. This carries a road or railway a cross water. (CLAPPER BRIDGE)
4. This carries water (canal or river) a cross land usually over a valley.
(SUSPENSION BRIDGE)
5. The section of canal where the water level changes to raise boats from one level
to the next. (PIER)
6. These allow water to flow in or out in order to change the water level in a canal.
(WEIR)
7. A deep hole in in the ground where people can get water. (WELL)
8. These are dug underground for roads and railways. (CULVERT)
9. This is the prosess of removing salt from sea water. (EARTHMOVER)
10. This large powerful vechile uses a large blade blade to move earth and rocks.
(EXCAVATOR)
11. This machine or ship is used for removing send and mud from the bottom of a
river or a harbour. (DREDGER)
12. This machine is used for rolling tarmae or asphalt flat a road suface. (ROAD
ROLLER)
C. A Civil engineer is showing an international visitor
xaround. Complete the text with words from roads from the
opposite page.
Here we are on one of our town streets . As you cansee the road is not flate.
It has a (A)..... (Drainage) .This is to allow rain water to run off the surface
and into the drains at the outside. The highest part of the road is the (B).....
(Macadam) in the centre. A (C)... (Manhole) . carrying waste water runs
below the surface of the road. At certain points along the road youll find
large (D)..... (Soft Shouther) Which alow engineers to go down and inspact
electricity and telephone cable which also run below the road . On either
side of the road there is a raised (E).... (Pavement) .for pedestrians which
is edged with (F).... (Tarsac) . siones. The black suface we use nowadays is a
variaty of (G)..... (Asphalt) . It was invented by a man of that name whose
company was later called Tarmac . As you can see this road needs to be
resurfaced. There are a number of (H)..... (Sewer) Following the heavy rain
we had last month.
Now here we are on a (I)...... (Main) road out of twon. There are no
pavementens here. Grass is allowed to grow along the edges and provides a
(J).... (Kerb) Over there you can see a (K)..... (Culvert) carrying a small
stream under the road .

TASK 2

1.match the following words and pahraseswith their


defanitions.
Answer:
1.Feasibility study = Investigation to assess both financial and
engineering aspects of a project.
2.Site = Building or installation which is built, supplied,or
investigation installed complate and ready to operate.
3.Maintenance = Activities carried out after the project to ensure
problems are solved.
4.Soil mechanics = Exstensive investigation to evaluate the load
bearing qualities and stability of the ground.
5.Specifications = Dimention and measurenmens

6.Technical = to order a plan to be carried out.


drawings

7.Commission a = Study of the proposed location to assess geology


project of the area
8.Costing system = Procedure to monitor the costof a project so that
management can get information on development.
9.Tender = Offer of a bid for engineering contract.

10.Turnkey =Deatailed plan of proposed sructures.


project

2. Put the following taks into the appropriate phase of


construction.
Anwer:
Phase Tasks
Before -Consulting engineer communication with client
construction - Employdment of consulting engineer.
-Feasibility study
During -Prelinary site investigation.
construction -Extensive site investigation consulting engineer with
contractors
After -Detailed design maintenance
construction

3.The following extract is from a latter written by a


qualified civil engineer in response to a job advertisement.
Complete the extract by unscrambling the latters in
brackets.
I am writing in connection with the job advertisement for a civil (A)....
Engineer (Renigeen). Which appreared in todays civil engineering.
I have a degree in (B)..... difficult (rnlutiasid) engineering. After Graduation.
I worked for four years at locke Engineers in the fild of (C).......
Constructions (onscorutiton) consulting. During my time there . I
specialized in (D)..... difficult (ilamse) preparation and construction
(E)......... difficult (ehdnsgulic). I am particulary interested in the
opportunities to further develop my skills ,especially in the followingareas:
Davelopment of (F)... Draft (tdfar) work plans.
(G)....... Site (etis) investigation.
Preparation of (H)........ difficult (nictel) communications.

S-ar putea să vă placă și