Sunteți pe pagina 1din 3

Usman Asif

S/O Malik Muhammad Asif Date of Birth: 24-07-1985


Dubai, UAE Gender: Male
Cell Phone#:+971559240417 (UAE) Nationality: Pakistan
engg.usmanasif@gmail.com Driving License: UAE
OBJECTIVE

I wish to develop my professional career in a leading institution within the telecommunication system sector,
where knowledge, skills and experience can be used more effectively and more productively.
PERSONAL STRENGTHS

I am a quick learner and a good team player who is able to work in a team environment, set and achieve long
and short term goals, think analytically and solve problems
EXPERIENCE

Wajda Group International L.L.C (APR, 2013-Present)

Working as Project Engineer in Wajda Group, UAE

Currently working on DU TK IBS Project


Conducting survey for 3G and LTE installation in IBS site
Supervise the installation of new 3G and LTE IBS site (Huawei Equipment)
Installation, troubleshooting and commission of Huawei 3G/LTE site
Integration of Huawei 3G/LTE site using WDT mobile application
Ensuring Site installation quality delivery according to customer and vendor standard.
VSWR troubleshooting using site master
Strictly follow EHS and safety rules during installation at site.
Good Knowledge of ISDP site sign in and verification.
EHS approval from Huawei through ISDP SmartQC for site Installation
Site PREPAT as per client requirements.
Snags Identification and Rectification as per Client Requirement.

Worked on ETISALAT MW16H Project


Conducting Site Survey for installation of MW
MW installation and Commissioning
2G/3G/LTE Service creation and Migration on newly installed MW link

Worked on DU MBB PROJECT


Working on 2G3G Rollout Project and LTE Rollout Project

Installation, troubleshooting, testing and commissioning of indoor and outdoor (APM30) 2G/3G/LTE Sites
Commissioning & integration of Huawei M/W RTN 9XX.
Conduct Line-of-Site survey for transmission connectivity and path profile (map study) for sites
RTN950A and ODU software upgrade using DC Tool
3G/LTE service Creation
Preparing MW Installation Report
Microwave link hardware upgrade 1+1 to 2(1+1).
Implemented Microwave links (1+1), 2(1+1) (n+1) and Xpic Protection Systems and EBAND links
2G, 3G and LTE IIB Migration on Alcatel Lucent PRE aggregator SR-7 and Huawei OSN3500

Commissioning & integration of Huawei 2G, 3G and LTE BTS3900 ,BTS3902E


Conduct TSSV for new 2G/3G and LTE sites
Preparing TSSR Reports for new 2G/3G LTE sites
WMPT/LMPT and UMPT card software upgrade and script loading
Indoor and Outdoor (APM30) sites Alarm Testing.
Implemented F3 expansion of 2G/3G sites
Sector addition in 3G sites
Installation and implementation of feeder and fiber solution LTE Site.
3G BBU cutover for LTE installation. (scenario 1 solution)
Installation and Integrations of Atom Cell sites (BTS3902E)

Site Quality Assurance experience


Supervision for removing and clearance of snags
Monitoring Projects on daily basis regarding Quality
Coordinating with Clients on daily basis.
Ensuring Quality standard as required by clients on both Indoor and Outdoor Telecom sites.
Assuring Site is working properly before the PAT date.
PAT inspection along Clients inspectors.

NetKom (OCT, 2011-SEP, 2012)

Worked as a Site engineer in NetKom, Lahore, Pakistan

Installation, troubleshooting, testing and commissioning of BTS and Microwave antennas


Indoor BTS cabling, Power and Battery, Jumper and Grounding connections, prepare connectors
TX, RX Calibration & Troubleshooting of BTS
Planning all BTS related equipment required for new cell site projects.
Conduct Line-of-Site survey for transmission connectivity and path profile (map study) for sites
VSWR testing at different sites.
Commissioning & integration of Huawei M/W RTN 620 and 950.
Commissioning & integration of BTS3012

University of Surrey - Centre for Communication Systems Research (NOV-2008 TO MAY-2010)

Worked as Research Assistant in University of Surrey - Centre for Communication Systems Research
Worked as a member of Delay Tolerant Network Research Group. My duties were:
Designing research methodologies.
Analyzing the collected data for the given topic by Research Supervisor.
Executing Simulations on different tools. (OMNET ++, NS-2, ONE simulator and OPNET)
Presentations to the Research Supervisor and Report Writing

PROFFESIONAL TRAINING
CISCO Training:
CCNA (Cisco Certified Network Associate) Cisco ID # CSCO11963097
SPECIALIZATION: Routing & Switching
CCNP (Cisco Certified Network Professional) Cisco ID # CSCO11963097
SPECIALIZATION: Routing & Switching
BSS Training:
BTS of HUAWEI (3012, 3012AE Installation & Software commissioning) from HUAWEI UET Joint Telecom
IT center (HUTIC)

QUALIFICATION
Institute Level Year

University of Surrey, Surrey, UK MSc Mobile & Satellite Communication (2008-2010)


UMT, Lahore, Pakistan BS (H) Telecommunication Engineering (2004-2008)
FINAL YEAR PROJECTS
MSc Project:
Network & Transport layers Issues for Delay/Disruption Tolerant Networking
BS (H) Project:
Design and implementation of VOIP network using Asterisk PBX.

MSc COURSE PROJECTS

Calculating the uplink capacity of a linear cellular system using Monte Carlo simulations.
Mobility management in IPv4 and IPv6.
Satellite Downlink link budget calculations.
Simulation of a Satellite Communication Link using Simulink.
A Study of Future Internet Applications and their impact on the Internet Architecture.

COMPUTER SKILLS
EDITING: Microsoft Word, Microsoft PowerPoint
DATABASE: Microsoft Excel, Microsoft Access
NETWORKING: Microsoft Internet Explorer, Mozilla Firefox, Microsoft Outlook
OPERATING SYSTEM: MS DOS, Windows (2000, XP, Vista, 7,8,10), Linux (Fedora, Red Hat and Ubuntu)
HARDWARE & SOFTWARE INSTALLATION: troubleshooting and configuring LAN, Wi-Fi and ADSL
routers
PROGRAMMING LANGUAGES: C++, java, SQL
SOFTWARE PACKAGES: Asterisk, Matlab, OMNET++, The ONE simulator, NI Multisim

PERSONAL SKILLS
Team work Skills. Leadership Skills, Stress Management, Analytical Problem Solving & Decision-Making
skills, Negotiation & Presentation Skills

S-ar putea să vă placă și