Sunteți pe pagina 1din 3
Limited Qatargas Operating Company [Effective Procedure | 02.16.60,08 01/12/2074 Issue Dato | 23/11/2014 Valid Until | 30/11/2017 Revision | 03 4 yo ZF Lalla QATARGAS Procedure Protective Coating Protective Coating Procedure Prepared By: Corrosion Engineering ~ Integrity Division Issued By: Engineering & Ventures Procedure [ 021800105 oiriareo%4 Zant 1204 Qatargas Operating Company Limited Valid Until} 30/11/2017 Revision | 03, 18.8 Visual Test & DFT checks - SSPC PA2 ‘+ Visual inspection shall reveal no defects such as grit inclusions, pitting, low DFT, Very high DFT, orange peel, cracking, bubbiing, pinholes, runs, tears, sags, bistering, missing, brush matks, Mud cracks in Zn slicate coatings, etc. ete * DFT check of paint system shall be measured after primer, intermediate & final coat. ‘+ Ascertain application of stripe coats by visual checks & fl thickness. + Total DFT - no single spot measurement can be less than 80% of specified thickness and no more than 120%, ‘+ Total DFT of paint system shall be average thickness calculated by averaging thickness of points measured on painted surface, 189 Coating repairs to application related defects ‘* The crew must understand reasons for occurrence of application related defects and they shall be trained as to avoid recurrence of such defects ‘= Quality Too! Box shall be held at site to brief above trainings & skills to avoid recurrence + Quantity & Intensity of pin holes or holidays shall be recorded before repairs * Spot repairs & Renovations of defects shall be carried out as per this procedure 18.10 Coating Inspection by Contractor's Coating Inspector Contractor's Foreman, Supervisor & Coating Inspector shall check Workmanship and Quality of work carried out on daily basis and also before company’s inspection Defects, it any, shall be marked for identifications and then repaired as per procedure, Contractor's Coating Inspector must Inspect Quality & confirm completion of work and then only shall raise request for company’s final inspection. Daily Painting Report shall be completed and presented to Company inspector atthe time of Final Inspection for review and approvals, 18,11 Coating Inspection by Company Coating Inspector / Representative ‘The Company Inspector or its Representative shall be allowed free access to the painting work site for Qualty surveillance & in progress quaity checks. ‘The Contractor shall make all means of close access like scaffolding etc. required for proper inspection of paining work. Up on completion of painting work and final inspection approval, Daily Painting Report shall be signed off by company inspector. ‘Company Inspector shall prepare *Painting / Coating Inspection Report’ as per approved format, attached with photographs of painted facility and submit the same fo Corrosion Engineer for approval Approved "Painting / Coating Inspection Report’ shall be scanned and filed in company's Qualification of Personnel All Coating Inspectors shall be individually certified by an approved organization like BGAS, FROSIO, NACE, SSPC. Cettification shall be minimum NACE level 2 or equivalent. All field blasters and painters shall be quaified in accordance with the procedure specified below as per Qatargas specification 003/00/00/SP/TS/00/025, Protective Coating Procedure | corrosion Engineering ~inteaily Dirsion Page 100 Issued By: Engineering & Ventures Qatargas Operating Company — [Entective J oinzm014 Procedure | 02.18.60.08 Issue Date | 23/11/2014 30/11/2017 03 Limited 18.13 18.14 GENERAL Qualification tests shall be done on test panels as per ASTM D428 standard, Test panel may be modified by paint applicator to suit specific application configuration Degree of surface cleanliness and anchor profile shall be in accordance with the requirements of this procedure, Application shail be with the same material, solvent, equipment, and methods to be used during actual application Inspection and testing of the coated test panel shell be in accordance with the requirements of his procedure. “The latest issue of the coating or lining manufacturer's product data sheets, application instruction and material safety datasheets shall be available and compiled with during qualification testing QUALIFICATION ‘The contractor shall schedule the time and ocation for testing, Qualification of operator shall be determined by the certified inspector conducting the test. ‘Atest panel that exhibits any defect that are not in compliance with the coating or lining Specification and are considered unacceptable by the inspector shall be rejected and aaceordingly the applicator qualification shall be rejected, Applicator may retake the qualification test as often as permitted by the Company. ‘An applicator qualified to apply a coating or lining using a specific application method must requalify for any other application method. DOCUMENTATION Documentation shall be kept to verify compliance to this procedure and to log all qualified applicators and the coating or lining system they are qualified for and the method of application, Up on passing qualification test as above, the applicator shall be provided with Qatargas trade approval card for the purpose of site verification, QG - Painting / Coating Inspection Report As given on page 102 of this procedure. QG - Painting / Coating Material inspection Report AAs given on page 103 of this procedure Protective Coating Procedure | corasion énginaering - integrity Division Propared By: Page 101 Issued By Engineering & Ventures

S-ar putea să vă placă și