Project Plan

for an Infrastructure Type 3 project

The purpose of this document is to document how the project will be managed and to provide a baseline for
delivery of project.
Project Number:
Project Location:

Brief Project
Description:
Concept Phase Date Project Scope Identification Form - Approved: ___ / ____ / 20__
Approved Budget (refer Project Scope Identification Form): $ _________________
Project Sponsor:
Name/Position
Project Customer:
Name/Position

Project Control Development Phase Implementation Phase


Scope Management For any alterations to the approved scope, a Change of Scope form will be
For In and Out of Scope submitted and approved prior to implementing the scope variation.
statements refer approved
Project Scope
Identification Form.
Time Management Are design activities required for this Anticipated start of contract
Show dates here, or project? Yes/No. ___/ ___/ 20__
attach a PrimaVera Details?
Schedule output. Anticipated end of construction
contract: ___/ ___/ 20__
Austroads G/lines?
Brownfields?
Expected design start __/ ___/ 20_ ; Any changes in milestones are to be
Expected completion ___/ ___/ 20_. approved using a Change of Scope
Any changes in milestones are to be Form (incl. Program Variation).
approved using a Change of Scope
Form (incl. Program Variation).
Cost Management The Project Cost Estimate will be Any Variations during delivery will be
The initial project cost reviewed: - following any initial reviewed against the approved scope
estimate/budget is noted design activities/or design changes; - and approved budget.
in the Project Scope prior to accepting any Offers.
Identification Form.
ProjMan and SPIDA will be used to ProjMan and SPIDA will be used to
manage the current project cost manage the current project cost
estimate and expenditure forecasts. estimate and expenditure forecasts
Quality Management: Any required design activities will be Construction will be in accordance with
Note design requirements, in accordance with the MR Road the agreed delivery process. (Refer
construction requirements Planning & Design Manual. Procurement Management, below.)
incl exceptional safety, Any design exceptions will be
environment, documented and approved.
constructability or traffic
issues

Project Plan for Infrastructure Type 3 Project, Transport and Main Roads Page 1 of 3
Project Control Development Phase Implementation Phase
HR Management Project Manager: (Name) Project Manager: (Name)
Note Project Team ____________________ ____________________

Team Member/s: (Name/Role): Team Member/s: (Name/Role):


__________ / __________ __________ / __________

__________ / __________ __________ / __________


Communications Communications with?/By whom? Communications with?/By whom?
Management LG: LG:
(Internal & External) __________ / __________ __________ / __________
Note planned Indigenous: Indigenous:
communications. __________ / __________ __________ / __________
Adjacent land holders: Adjacent land holders:
__________ / __________ __________ / __________
Other/s: Other/s:
__________ / __________ __________ / __________
Risk Management Contingency/Risk Allowance will be Contingency/Risk Allowance will be
Note how risks will be determined by? (Select one) reviewed during this Phase, and
assessed/considered & Corporate Risk register, or updated in ProjMan.
documented? Adopting a % (refer MR Project
Cost Estimating Manual)
Procurement Any design activities will be procured Proposed delivery method of Contract?
Management by: e.g. internal design resources. (Note one)
Note method of Minor Works Contract
procurement/other Charges will be accrued using CATS Minor Works Performance Contract
method of delivery Letter of Acceptance/Agreement
under current RMPC.
Contract No.: ____
Design Development M4212 will be completed As constructed plans will be prepared

Learnings & Finalisation Any learnings will be recorded in a Any learnings will be noted in a
Phase project learnings register. Completion Report/Close-out
document/post-construction review.

The State of Queensland (Department of Transport and Main Roads) 2012

http://creativecommons.org/licences/by/3.0/au
To attribute this material, cite State of Queensland (Department of Transport and Main Roads) 2012, TMR OnQ Framework.

Template Version 1.0 (11/12/2012)

Project Plan for Infrastructure Type 3 Project, Transport and Main Roads Page 2 of 3
Submitted Project Manager

Name: Position:

Signature: ______________________ Date: ______/_____/_____

Agreed to proceed Sponsor


Position: Principal Engineer/Advisor/Coordinator
Name:

Signature: __________________ Date: ______/_____/_____

Comments:

Attachments: (where applicable)

A. Previous Scope Identification Statement and attachments


B. Any approved change of scope forms
C. Cost estimate
D. Schedule/Gantt chart
E. Corporate Risk Register

Project Plan for Infrastructure Type 3 Project, Transport and Main Roads Page 3 of 3