TITLE:

CONSTRUCTION
TECHNOLOGY III
COURSE WORK
REPORT
N

GROUP 5 1SBEQ

NURUL IMAN BT
MUSTAFFAR
KAMAR
A12BE0189

Subject:
CONSTRUCTION
TECHNOLOGY III
(SBEQ&C2112)
Course: Bachelor of
Quantity Surveyor
Year: 2 SBEQ
2013/2014
Submission &
Presentation Date:
Final Week

Lecturer:
AMINUDIN ALI
DEPARTMENT OF
QUANTITY SURVEYING
FACULTY OF BUILT
ENVIRONMENT
UNIVERSITI TEKNOLOGI
MALAYSIA
SKUDAI JOHOR
TITLE:
CONSTRUCTION TECHNOLOGY III
COURSE WORK REPORT

GROUP 1
_______________________________
MEMBERS NAME

1 A12BE0157 AIDILA SYAHIRAH BINTI ZULKEFLI (Leader)


2 A12BE0158 ANA FATIHA BINTI ROSMANSHAH (2nd Leader)
3 A12BE0161 AZI ZUL HAKIM BIN OTHMAN
4 A12BE0162 CHRISTMAWA WAILI
5 A12BE0163 CHUA JIT-NI GINNY
6 A12BE0164 CHUAH SHIANG PIN
7 A12BE0166 FATIN FARHANA BINTI ROSLI
8 A12BE0167 HAMIZAH AMIRAH BINTI AYUP
9 A12BE0169 KERK CHIA CUN
10 A12BE0171 LAW SONG KOON
11. ___________________________________
12. ___________________________________
13. ___________________________________
14. ___________________________________
15. ___________________________________

Subject: CONSTRUCTION TECHNOLOGY III (SBEQ & SBEC2112)


Course: Bachelor of Quantity Surveyor & Construction
Year: 2 SBEQ & SBEC 2013/2014
Submission & Presentation Date: Week Final
Lecturer: AMINUDIN ALI
DEPARTMENT OF QUANTITY SURVEYING
FACULTY OF BUILT ENVORONMENT
UNIVERSITI TEKNOLOGI MALAYSIA
SKUDAI JOHOR
COURSE WORK
AMIN/SBEQ&C2112 TECH2/SEPT13
CONSTRUCTION TECHNOLOGY 3 SBEQ & SBEC 2112

Lecturer : Aminudin Ali (Room: B11 234 01)


Subject : SBEQ & SBEC 2112 Construction Technology 3
Allocated Marks :Coursework 10% & Presentation 10% (Coursework File 10%; min 5 meeting)

Course Work Instruction


The aim of this course is to develop an understanding of construction plants and machinery, method and techniques in
demolition, renovation and repair works including the technology of industrialised and more advance construction. The
course will provide students with skills to allow the evaluation of a range of technologies towards the adoption of an
appropriate design decision and knowledge of the centrality of technological decision making in the context of the wider
construction process. The course also provides the environment to develop studentscommunication skills and the
ability to work effectively as a team member to achieve mutual objective.

You are required to form a group consist of 7 to 15 multi racial members each. (Upon approval by lecturers)
The group must identify construction sites and for the a case study of the followings topics:
The method and process of construction, fixing and/or assembling, construction detailing of various elements and
components.
1. Pre-stressed Concrete Works: Pre & Post Tensioned, the principles of design and construction of various forms
and types of prestressed and precast concrete construction and its application including construction details.
2. Industrialised Building System (IBS): Precast Concrete Framing, Panel and Box, Formwork Systems, Steel
Framing Systems, Timber Framing Systems and Block work Systems. The principles of industrialised construction;
the manufacturing process; various types and forms of industrialised construction system.
3. Plant, Machinery & Tools: Construction Plant Classification; Earthwork, Roadworks, Cranes.Traditional,
Innovative and Latest technology.
4. Temporary Works: The traditional and innovative temporary works-formworks, supports and props, work space,
temporary building and structures including method and approach to environmental protection.
5. Demolition, Renovation and Repair Works: The technology, methods and techniques of demolition, renovation
and repair to building works, the process, procedure and work sequencing.
6. External Works: Road & Carparks, Surface Water Drainage, Fencing & Gate.
7. Landscape Works: Soft & Hard Landscape.
A construction site case study is a must. Further outline and detail circumstances will be discussed for each group.
Apart from this directive, additional instruction and information will be given as it seems fit depending on the related
problems discussed during the tutorial session. Tutorial for each group must be done fairly and accordingly, controlled
by the class representative and group leader without any dispute in regarding the time period spend for each group.

A report must be made in the form of softcopy and consist of the following requirements:
Describe the various types of plant, machinery and hand tools used in construction and their implication on the cost
and time of constructions.
Illustrate the method, techniques and the current technology in design and construction of various construction
temporary works.
Assess the alternative technology, process and sequencing, method and techniques of demolition, renovation and
repairs works.
Discuss the current development of the industrialised construction and other advanced construction techniques and
systems.
Work effectively in a team.
Related brochures/ catalogs/pamphlets etc.
Measurement & Cost for each types(SBEQ) & Panning & Method Statement (SBEC).

Date of submission: Week 15

Date of presentation: Week 15


Presentations are to be in the form of Powerpoint only.

All submission must be in CD or Pen drive form including all brochures / catalogs / pamphlets etc.

i
AMIN/SBEQ&C2112 TECH2/SEPT13

PREFACE

(Personal acknowledgement)

Example:

The group would like to thanks our group member Azmi for getting
the construction site for out coursework as without that we would
face much difficulty.

ii
AMIN/SBEQ&C2112 TECH2/SEPT13

ACKNOWLEDGEMENT

(Official acknowledgement)

Example:

The group would like to thanks Mr. Azrul, Project Manager,


Pembinaaan Sari Sdn. Bhd. for allowing us to use the construction
site as case study for out coursework as without that we would
face much difficulty.

iii
AMIN/SBEQ&C2112 TECH2/SEPT13

TABLE OF CONTENT
page
COURSE WORK INSTRUCTION .i
ACKNOWLEDGEMENT.....ii
LIST OF FIGURES ....iii

1 INTRODUCTION ........................................................................................................................... 1
1.1 GENERAL KNOWLEDGE AND UNDERSTANDING OF CONSTRUCTION TECHNOLOGY.................. 1
1.2 RELATED KNOWLEDGE AND PRACTICES ................................................................................... 2
1.3 MAIN CASE STUDY DESCRIPTION .................................................................................. 3
1.3.1 CASE STUDY CONSTRUCTION PROCESS ........................................................... 3
1.3.1.1 Others Related Case Study .................................................................................................... 3
1.3.1.1.1 Case Study 1 Description ................................................................................................. 3
1.3.1.1.1.1 Case Study 1 Construction Process ....................................................................... 3
2 SUBSTRUCTURE ......................................................................................................................... 4
2.1 EARTH RETENTION SYSTEM & SHEET PILE ............................................................................... 4
2.2 SOIL STABILIZATION & FREEZING METHOD .............................................................................. 4
2.3 CAISSON ................................................................................................................................... 4
2.4 COFFERDAMS ........................................................................................................................... 4
2.5 DIAPHRAGM W ALL .................................................................................................................... 4
2.6 GROUND W ATER CONTROL ..................................................................................................... 4
2.7 CONSTRUCTION CASE STUDY................................................................................................... 4
3 PRE-STRESSED CONCRETE CONSTRUCTION................................................................... 5
3.1 PRINCIPLE, DESIGN AND CONSTRUCTION ................................................................................ 5
3.2 POST TENSION STRUCTURE ..................................................................................................... 5
3.3 PRE TENSION STRUCTURE ....................................................................................................... 5
3.4 MATERIALS & COMPONENTS .................................................................................................... 5
3.5 METHOD OF CONSTRUCTION .................................................................................................... 5
3.6 CONSTRUCTION CASE STUDY................................................................................................... 5
4 TOPIC LEVEL 1............................................................................................................................. 6
4.1 TOPIC LEVEL 2 ..................................................................................................................... 6
4.1.1 TOPIC LEVEL 3 ............................................................................................................. 6
4.1.1.1 Topic Level 4 ............................................................................................................................. 6
4.1.1.1.1 Topic Level 5 ...................................................................................................................... 6
4.1.1.1.1.1 Case Study 1 Construction Process ....................................................................... 6
5 BUDGET AND EXPENSES FOR THE COURSE WORK ....................................................... 7
5.1 STATONARIES ...................................................................................................................... 7
5.2 TELEPHONE BILLS .............................................................................................................. 7
5.3 TREVELING EXPENSES ..................................................................................................... 7
5.4 OTHERS ................................................................................................................................. 7
5.5 BILLS PASTE TO PAPER..................................................................................................... 7
6 CONCLUSION ............................................................................................................................... 8
6.1 CRITICAL THINKING FOR THE RATIONALE/SUITABILITY OF USAGE OF THE
METHODOLOGY/CHRONOLOGY OF CONSTRUCTION TECHNOLOGY ...................................................... 8
6.2 DIFFULTY AND PROBLEMS OF THE CONSRUCTION SITE RELATED TO
METHODOLOGY/CHRONOLOGY OF CONSTRUCTION TECHNOLOGY ...................................................... 8
6.3 RECOMMENDATIONS ......................................................................................................... 8
6.4 DIFFULTY AND PROBLEMS FACED IN COMPLETING THE COURSE WORK......... 8
7 BIBLIOGRAPHY/REFERENCES ............................................................................................... 9
7.1 REFERENCES ....................................................................................................................... 9
7.2 BIBLIOGRAPHY .................................................................................................................... 9
8 APPENDIX.................................................................................................................................... 10

iv
AMIN/SBEQ&C2112 TECH2/SEPT13

LIST OF FIGURES
page

Figure 1 Case Study photo over view ................................................................................................. 3


Figure 2 Caisson .................................................................................................................................... 4
Figure 3 Pre-stress Concrete Members ............................................................................................. 5
Figure 4 Insert Auto Caption for Figure .............................................................................................. 6

v
AMIN/SBEQ&C2112 TECH2/SEPT13

1 INTRODUCTION
1.1 GENERAL KNOWLEDGE AND UNDERSTANDING OF
CONSTRUCTION TECHNOLOGY

1
AMIN/SBEQ&C2112 TECH2/SEPT13

1.2 RELATED KNOWLEDGE AND PRACTICES

2
AMIN/SBEQ&C2112 TECH2/SEPT13

1.3 MAIN CASE STUDY DESCRIPTION

Figure 1 Case Study photo over view

1.3.1 CASE STUDY CONSTRUCTION PROCESS

1.3.1.1 Others Related Case Study

1.3.1.1.1 Case Study 1 Description

1.3.1.1.1.1 Case Study 1 Construction Process

3
AMIN/SBEQ&C2112 TECH2/SEPT13

2 SUBSTRUCTURE

2.1 EARTH RETENTION SYSTEM & SHEET PILE

2.2 SOIL STABILIZATION & FREEZING METHOD

2.3 CAISSON

2.4 COFFERDAMS

2.5 DIAPHRAGM WALL

2.6 GROUND WATER CONTROL

2.7 CONSTRUCTION CASE STUDY

Figure 2 Caisson

4
AMIN/SBEQ&C2112 TECH2/SEPT13

3 PRE-STRESSED CONCRETE CONSTRUCTION

3.1 PRINCIPLE, DESIGN AND CONSTRUCTION

3.2 POST TENSION STRUCTURE

3.3 PRE TENSION STRUCTURE

3.4 MATERIALS & COMPONENTS

3.5 METHOD OF CONSTRUCTION

3.6 CONSTRUCTION CASE STUDY

Figure 3 Pre-stress Concrete Members

5
AMIN/SBEQ&C2112 TECH2/SEPT13

4 TOPIC LEVEL 1

4.1 TOPIC LEVEL 2

4.1.1 TOPIC LEVEL 3

4.1.1.1 Topic Level 4

4.1.1.1.1 Topic Level 5

4.1.1.1.1.1 Case Study 1 Construction Process

Figure 4 Insert Auto Caption for Figure

6
AMIN/SBEQ&C2112 TECH2/SEPT13

5 BUDGET AND EXPENSES FOR THE COURSE


WORK

5.1 STATONARIES

5.2 TELEPHONE BILLS

5.3 TREVELING EXPENSES

5.4 OTHERS

5.5 BILLS PASTE TO PAPER

7
AMIN/SBEQ&C2112 TECH2/SEPT13

6 CONCLUSION

6.1 CRITICAL THINKING FOR THE RATIONALE/SUITABILITY


OF USAGE OF THE METHODOLOGY/CHRONOLOGY OF
CONSTRUCTION TECHNOLOGY

6.2 DIFFULTY AND PROBLEMS OF THE CONSRUCTION SITE


RELATED TO METHODOLOGY/CHRONOLOGY OF
CONSTRUCTION TECHNOLOGY

6.3 RECOMMENDATIONS

6.4 DIFFULTY AND PROBLEMS FACED IN COMPLETING THE


COURSE WORK

8
AMIN/SBEQ&C2112 TECH2/SEPT13

7 BIBLIOGRAPHY/REFERENCES
7.1 REFERENCES
1. Koontz H. & Weihrich H, 1988, Management McGraw-Hill Book Co, New York
(HD31 K662 1988 n2)
2. Luthans F., 2005, Organizational Behavior McGraw-Hill Book Co, New York
(HD58.7 L88 2005 c1)
3. Gomez-Mejia LR et al, 2001,Managing Human Resources Prentice Hall, New
Jersey(HF5549 G65 2001)
4. Johnson G. & Scholes 2001, Exploring Corporate Strategy Prentice Hall, London
(HF5549 G65 2001 f)
5. Salamon M.2000, Industrial Relation Prentice Hall, London (HF6971 s24 2000
c1)

7.2 BIBLIOGRAPHY
1. Stoner J.A.F. & Freeman RE. 1992 Management Prentice Hall, London (HD31
869 1992 c1)
2. Yusof Ismail 1991 Mengurus Secara Islam A.S. Noordeen Kuala Lumpur
(HD38.y87 1991 n1)
3. Martin J.1998 Organizational Behavior International Thomson Press London
(HD58.7 M373 1998 c1)
4. Sherman 1992,Managing Human Resources South Western Publishing Ohio
(HF5549 S43 1992 c2)
5. Green G.D. Industrial Relation Pitman Publishing London (HD6971 G73 1994)
6. Aminuddin M 1990, Malaysian Industrial Relation McGraw-Hill Book Co,
Singapore (HD8700.6.A64 1990)

9
AMIN/SBEQ&C2112 TECH2/SEPT13

8 APPENDIX