DRAINAGE CALCULATIONS

Design Basis:

A) Water demand (Guest) = 350 Liters / Person / Day


B) Water demand (Staff) = 40 Liters / Person / Day

Calculations:

A) Water demand (Guest) = 350 Liters / Person / Day


Total No. of Guests = 348 Persons
Total Water Storage = 122 m3 / day

Assumed Sewage Waste = 90%

= 109.8 m3

B) Water demand (Staff) = 40 Liters / Person / Day

Total No. of Staff = 100 Persons

Total Water Storage = 4000 Liters / day

= 4.0 m3 / day

Assumed Sewage Waste = 90%

= 3.6 m3

Therefore,

Total Sewage collection = 109.8 m3 + 3.6 m3

= 113.4 m3

Size of the main Pipe at full flow = 160mm Dia.

Pipe Gradient considered within the building - 1:100

Pipe Gradient considered for external - 1:150

Swimming pool Volume = 150 m3

Pool turnover period = 4

Swimming pool water flow = 150 / 4 x 3.6


= 10.4 lps
Therefore
Assumed 8.0 min. Backwash = 10.4 x 8 x 60

Say = 5.0 m3 / day (Approximate)

Blow down flow rate from cooling tower = 2.0 m3 (Approximate)

Water pool = 38 m3 / day

Therefore total storage = 158.4 m3

2. HOLDING TANK

Total storage = 158.4 m3

Sewage collection = 113.4 m3 / day

The estimated Sewage contribution / day


at Grey plant working condition = Assumed 50% Waste water

= 56.7m3

Blow down flow rate from cooling tower = 2.0 m3

= 56.7 m3 + 2.0 m3

= 58.7 m3

For two days storage = 117.4 m3

The estimated Sewage contribution / day = 158.4 m3 /day


In case of Grey water plant shutdown

For one days storage = 158.4 m3

Therefore, Effective tank size = 27.7m x 3.0m x 1.9m Deep

Holding tank size = 27.7m x 3.0m x 3.0m Deep

2. SEWAGE LIFTING STATION (BASEMENT-2)

Size of the chamber = 1.5mx1.0mx0.5m Deep

Storage Volume = 0.75m3

Pump Duty: = 01 Duty / 01 Standby


Flow Rate = 750 / 5 / 60

= 2.5 lps

3. STORM WATER LIFTING STATION (BASEMENT-2)

Size of the chamber = 1.2m x 1.2m x 0.2m Deep

Storage Volume = 0.288m3

Pump Duty: = 01 Duty/ 01 Standby

Flow Rate = 288 / 5 / 60

= 0.96 lps

Say = 1.0 lps

4. RAIN WATER DRAINAGE

Design Basis:

A) Maximum rain water intensity = 75mm / Hr.

Calculations:

Total area to be drained = 1100 m2

Total volume to be drained = 82.5 m3

Total flow rate = 22.9 lps

Flow through each outlets = 22.9 / 11

= 2.1 lps

Size of the pipe at 1/4 full flow = 110mm Dia.

No. of out lets = 11 Nos.

5. GREY WATER SYSTEM

Design Basis:

Guest = 348

Staff = 100

Water allocation = 350 Liters / Guest

= 40 Liters / Staff
Calculations:

Usage per Guest,

For Meals = 20 Liters

For Laundry = 20 Liters

WC Flush = 40 Liters

Total = 350 80

= 270 Liters / Guest

Usage per Staff,

Assumed 50% for Grey water = 20 Liters

Total usage, Guest + Staff = (270x 348) + (20 x 100)

= 96m3/day

Total Backwash from Swimming pool & Waterfall = 43m3/day

Total Grey water = 139m3/day

Therefore for 18hrs. period = 2.15 lps