Documente Academic
Documente Profesional
Documente Cultură
ARI (year) 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
2 212.5 201.5 193.7 187.8 183.3 179.6 171.3 164.4 158.5 153.5 149.1 143.6 138.7 134.4 130.5 127.0 123.0 119.4 116.0 113.0 110.2 107.6
5 288.1 266.9 251.8 240.5 231.7 224.6 213.0 203.3 195.1 188.1 182.0 174.8 168.4 162.7 157.7 153.1 148.1 143.5 139.3 135.5 132.0 128.7
10 315.3 292.7 276.5 264.4 255.0 247.4 234.7 224.1 215.2 207.5 200.9 192.9 185.9 179.7 174.2 169.2 163.6 158.6 154.0 149.8 145.9 142.3
20 352.4 325.8 306.9 292.7 281.6 272.8 258.5 246.6 236.6 228.0 220.5 211.7 203.9 197.0 190.8 185.3 179.2 173.6 168.5 163.9 159.6 155.6
50 385.3 356.6 336.1 320.8 308.8 299.3 283.7 270.7 259.8 250.3 242.2 232.5 224.0 216.5 209.7 203.6 196.9 190.8 185.2 180.1 175.4 171.1
100 432.3 398.8 374.9 356.9 342.9 331.8 314.2 299.6 287.2 276.6 267.4 256.7 247.2 238.7 231.2 224.4 217.0 210.2 204.0 198.3 193.1 188.3
60
64.8
75.7
83.9
91.3
100.5
110.2
27 28 29 30
105.2 103.0 101.0 99.0
0.3 FB TWL
Box Culvert
D
W
Pudu Cut Drain
Box culvert Capacity computation area,Ap =
perimeter, Pp =
depth, D= 1.35 m without FB
width, W= 1.20 m
Area, A = 1.78 m2
perimeter, P = 4.02 m
R= 0.44 m
0.3 FB TWL
Box Culvert
D
W
Pudu Cut Drain
area,Ap =
Box culvert Capacity computation perimeter, Pp =
Area, A = 4.95 m2
perimeter, P = 4.65 m
R= 1.06 m
SDN. BHD.
signed : YauTY
e : Jun-06
ecked :
OUTPUT
0.16 m
1.17 m
= 8.82 m3/s
= 6.19 m3/s
= 5.27 m3/s
'file:///conversion/tmp/scratch/370956013.xls'#$MD (RSD)
SDN. BHD.
signed : YauTY
e : Jun-06
ecked :
OUTPUT
0.16 m
1.17 m
= 6.87 m3/s
= 4.63 m3/s
= 4.04 m3/s
'file:///conversion/tmp/scratch/370956013.xls'#$Catchm
d
PROJECT : 06186 Designed :
r
page Catchment Flow Compuation fora Main Drain A1 Date :
of Existing Catchment A1 i Checked :
REF. n CALCULATION
1.0 a
Post Development Catchment Area
Upstream Catchment Area gA1 A1=Forest Reserve = 33.23ac.
e
r
1.1 Determine of time of concentration, t
e up c (up stream)
d
PROJECT : 06186 Designed :
r
page Catchment Flow Compuation fora Main Drain A2 Date :
of Existing Catchment A2 i Checked :
REF. n CALCULATION
1.0 a
Post Development Catchment Area
Upstream Catchment Area gA2 A2=Forest Reserve = 33.23ac.
e
r
1.1 Determine of time of concentration, t
e up c (up stream)
YauTY
Apr-06
OUTPUT
13.45 ha
17 mins
600 m
5 mins
22 mins
143.50 mm/hr
158.57 mm/hr
210.18 mm/hr
0.53
0.56
0.63
2.84 m3/s
3.32 m3/s
4.95 m3/s
YauTY
Apr-06
OUTPUT
17.42 ha
17 mins
100 m
1 mins
18 mins
131.96 mm/hr
145.87 mm/hr
193.11 mm/hr
0.51
0.53
0.61
3.26 m3/s
3.74 m3/s
5.70 m3/s
'file:///conversion/tmp/scratch/370956013.xls'#$Ex
0.3 FB TWL
Box Culvert
D
W
Pudu Cut Drain
Box culvert Capacity computation area,Ap = 0.16
perimeter, Pp = 1.17
depth, D= 3.10 m without FB
width, W= 3.10 m
Area, A = 9.77 m2
perimeter, P = 9.42 m
R= 1.04 m
SDN. BHD.
YauTY
Jun-06
OUTPUT
m
m
'file:///conversion/tmp/scratch/370956013.xls'#$
0.3 FB TWL
Box Culvert
D
W
Pudu Cut Drain
Box culvert Capacity computation area,Ap =
perimeter, Pp =
depth, D= 1.50 m without FB
width, W= 2.40 m
Area, A = 3.76 m2
perimeter, P = 5.52 m
R= 0.68 m
0.3 FB TWL
Box Culvert
D
W
Pudu Cut Drain
area,Ap =
Box culvert Capacity computation perimeter, Pp =
Area, A = 3.15 m2
perimeter, P = 5.10 m
R= 0.62 m
SDN. BHD.
signed : YauTY
e : Jun-06
ecked :
OUTPUT
0.16 m
1.17 m
= 8.82 m3/s
= 6.19 m3/s
= 5.27 m3/s
'file:///conversion/tmp/scratch/370956013.xls'#$MD
SDN. BHD.
signed : YauTY
e : Jun-06
ecked :
OUTPUT
0.16 m
1.17 m
= 6.87 m3/s
= 4.63 m3/s
= 4.04 m3/s
xx
'file:///conversion/tmp/scratch/370956013.xls'#$C
d
PROJECT : 06186 Designed :
r
page Catchment Flow Compuation a Date :
of post-development discharge computaion
i - Catchment A1 Checked :
REF. n CALCULATION
1.0 Post Development Catchment a Area
Upstream Catchment Area g(A1-A1b) A1a=Forest = 35.2ac.
e
Project Site (A1b) ( developed area ) = 17.2ac.
r Overall Catchment, A1 =
1.1 Determine of time of concentration, t
e up c (up stream)
Ai avg
C 100 =
Rainfall Intensity Based on I22 from section 1.2
1.6 Discharge flow computaion, Qpre , for Post-development
Q = (A1 x Cavg) x I22
Discharge flow for 5 years storm Q5,post =
Discharge flow for 10 years storm Q10,post =
Discharge flow for 100 years storm Q100,post =
JURUTERA PERUNDING TEGAP SDN. BHD.
d
PROJECT : 06186 Designed :
r
page Catchment Flow Compuation a Date :
of post-development discharge computaion
i - Catchment A2 Checked :
REF. n CALCULATION
1.0 Post Development Catchment a Area
Upstream Catchment Area g(A2-A2b) A2a=Forest = 42.12ac.
e
Project Site (A2b) ( developed area ) = 7.1ac.
r Overall Catchment, A2 =
1.1 Determine of time of concentration, t
e up c (up stream)
Cavg = Ci Ai C5 =
avg
Ai
C 10 =
avg
avg
C 100 =
Rainfall Intensity Based on I25 from section 1.2
1.6 Discharge flow computaion, Qpre , for Post-development
Q = (A2 x Cavg) x I25
Discharge flow for 5 years storm Q5,post =
Discharge flow for 10 years storm Q10,post =
Discharge flow for 100 years storm Q100,post =
///conversion/tmp/scratch/370956013.xls'#$Catchment
YauTY
Apr-06
OUTPUT
14.09 ha
6.89 ha
20.98 ha
17 mins
600 m
5 mins
22 mins
143.50 mm/hr
158.57 mm/hr
210.18 mm/hr
0.53
0.56
0.63
12 mins
200 m
4 mins
16 mins
174.77 mm/hr
192.93 mm/hr
256.66 mm/hr
0.84
0.89
0.90
0.63
0.67
0.72
5.27 m3/s
6.19 m3/s
8.82 m3/s
YauTY
Apr-06
OUTPUT
16.85 ha
0.00 ha
16.85 ha
17 mins
1000 m
8 mins
25 mins
131.96 mm/hr
145.87 mm/hr
193.11 mm/hr
0.51
0.53
0.61
12 mins
200 m
4 mins
16 mins
174.77 mm/hr
192.93 mm/hr
256.66 mm/hr
0.84
0.89
0.90
0.51
0.53
0.61
3.15 m3/s
3.62 m3/s
5.51 m3/s