Central Public Works Department

NIT No.: 18/EE(E)/ACD-III/2017-18

Name of Work:- Replacement of defective / damaged fitting with LED fitting at dispensary, SPG
complex, Dwarka, New Delhi.

SCHEDULE OF QUANTITY
Name of the Contractor M/S A P ENGINEERS

S. Quantit Quoted rates Rate in


No. Description of Items y Unit
are negative Figures in
or positive Rupees Amount
1 Replacement of defective / broken CFL fititng with 12-15
watt 6000K LED surface mounted LED downlighter in
powder coated finish with integrated electronic driver
complete with all accessories i/c connections testing and
commissioning & rebate for dismantled material
complete as required.
16 nos Normal Item 2000.00 32000
2 Replacement of defective / broken 1 x 40 watt fititng with
21 watt-5700 K suspended / surface mounted linear LED
lighting system with suitable size suspension for LED
fitting continous mounting in powder coated finish with
integrated electronic driver complete with all accessories
i/c making connections, testing & commissioning &
rebate for dismantled material complete as required.

105 nos Normal Item 5200.00 546000


3 Replacement of defective / broken 2 x 40 watt fititng with
32 watt-5700 K suspended / surface mounted linear LED
lighting system with suitable size suspension for LED
fitting continous mounting in powder coated finish with
integrated electronic driver complete with all accessories
i/c making connections, testing & commissioning &
rebate for dismantled material complete as required.

11 nos Normal Item 6200.00 68200


4 Replacement of defective / broken step light fitting with 4
watt LED step light fitting white powder coated cast
aluminium body with IP54 protection with integrated
electronic driver complete with all accessories i/c
connections testing and commissioning & rebate for
dismantled material complete as required.
26 nos Normal Item 1800.00 46800
Grand Total 693000.00
NOTE:
1. If quoted rates is "Normal Item" this amount will be paid to contractor/Firm by CPWD. IF quoted rates is "Minus Item" this
amount will be paid to CPWD by contractor/Firm.
2. If any cells (Rates) left Blank, then the same will be treated as "Zero".

Executive Engineer (E)


Contractor