Types of Test
pH Theory Guide
Get an electronic Guide on pH
measurement. Download now!
pH Theory Guide
Get an electronic Guide on pH measurement. Download now! mt.com
https://bestengineeringprojects.com/pile-load-test/ 1/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects
In general two types of pile load tests are conducted. They are:
Initial Test
Routine Test
The initial test is performed before the start of construction to assess the design adeq
routine test is performed on a working pile. This test is also known as work test. In init
load 5/2 times the working load in work test load is 3/2 times the design load.
Methods of Testing
Maintained Test
Constant Rate of Penetration Test (CRP)
Maintained Load Test The maintained load test is a better method. This method pr
of both shaft and end resistance. In this method the contribution of each soil layer can
but it is time consuming. The failure load is not clearly de ned.
Loading Depending upon the workload, the load is applied by any one of the followi
https://bestengineeringprojects.com/pile-load-test/ 2/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects
Distance of anchor piles from test pile The distance cannot be less than 1.5 m. It s
less than 4 times the diameter of test pile for straight pile and not less than 2 times th
the bell for belled pile.
Load Application The load is applied in the pile in the following sequence.
Load applied in increment at the rate of 25 % of working load till working load is
https://bestengineeringprojects.com/pile-load-test/ 3/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects
For each load increment maintain the load constant till settlement is 0.1 mm for
Code, 0.1 mm for 20 min as per BS Code
Go for next loading
When working load is reached hold the load for 24 hr and unload
Reload from working load to higher loads
Hold load constant till settlement is 0.1 mm for 5 min as per IS Code, 0.1 mm for
BS Code
Repeat the process for subsequent load increments
Go either up to 5/2 times the working load for initial or routine test or to a settlem
10 % of pile diameter for straight piles and 7.5 % of base diameter for belled pile
Load Measurement The load is measured by any one of the following equipment
Burdon Gauge
Proving Ring
Load Cell
https://bestengineeringprojects.com/pile-load-test/ 4/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects
Constant Rate of Penetration Test This test is most suitable for friction pile. In this
de ned failure load is obtained and the method is very quick. However, this method d
elastic settlement at working load.
Method of Testing In this method, the pile is jacked continuously into soil at a const
failure takes place. The jacking rate in clay is 0.75 mm/min and a small movement req
In sands, the jacking rate is 5 mm/min and a large movement required for failure.
Load at which pile continues to move downwards without any further loading or
Load at which settlement is 10 % of pile diameter
https://bestengineeringprojects.com/pile-load-test/ 5/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects
Pile Capacity Based on SPT Results Group Action of Piles | Settlement Bearing Capacity of P
and Static Cone Penetration (CPT) of Pile Groups in Clay and in Sand Clay, sands and in Gr
Results September 30, 2013 September 30, 2013
September 30, 2013 In "Civil Projects" In "Civil Projects"
In "Civil Projects"
https://bestengineeringprojects.com/pile-load-test/ 6/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects
New DelhiTirupati CROCS Men's Casual CO2 Laser cutting Group Acti
on 10,Jan 2018 Sandals (BROWN ,... systems | Settlemen
Groups in C
Ad www.makemytrip.com Ad ajio.com Ad www.gboslaser.com bestengineeringpro
https://bestengineeringprojects.com/pile-load-test/ 7/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects
2 Comments bestengineeringprojects
Recommend Share
LOG IN WITH
OR SIGN UP WITH DISQUS ?
Name
ALSO ON BESTENGINEERINGPROJECTS
Auto Cut Circuit for Over and Under Voltage Organ Circuit | Top Octave Gene
2 comments 4 months ago 1 comment 4 months ago
AvatarBestEngineeringProjects Thank you Mr. Reeko AvatarAsterix One gripe that I've had
Azil for letting us know. We had updated the circuit electronic organs is not the absol
diagram with possible modification. individual notes on an evenly-tem
https://bestengineeringprojects.com/pile-load-test/ 8/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects
SUBSCRIBE
New
DelhiTirupati on
10,Jan 2018
4,764 only
New
DelhiTirupati on
13,Nov 2017...
9,427 only
New
DelhiTirupati on
9,Jan 2018
5,257 only
New
DelhiTirupati on
14,Nov 2017...
6,465 only
New
DelhiJammu on
12,Nov 2017
4,758 only
MumbaiGoa on
12,Nov 2017
Return
2,870 only
makemytrip.com
CATEGORIES
Co erdams (3)
https://bestengineeringprojects.com/pile-load-test/ 10/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects
Robotics (3)
Sheet Pile Wall (6)
Dreamlover Technology
5,554 likes
https://bestengineeringprojects.com/pile-load-test/ 11/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects
Google+
Follow
POPULAR PROJECTS
https://bestengineeringprojects.com/pile-load-test/ 12/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects
RECENT POSTS:
HOT TOPIC
Copyright 2017
https://bestengineeringprojects.com/pile-load-test/ 13/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects
https://bestengineeringprojects.com/pile-load-test/ 14/14