Pile Load Test | Purpose of Pile Loa


SEPTEMBER 30, 2013 BY ENGINEEERING PROJECTS 2 COMMENTS

The purpose of pile load test is:

To determine settlement under working load


To determine ultimate bearing capacity
To ascertain as a proof of acceptability

Types of Test

pH Theory Guide
Get an electronic Guide on pH
measurement. Download now!

pH Theory Guide
Get an electronic Guide on pH measurement. Download now! mt.com

https://bestengineeringprojects.com/pile-load-test/ 1/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects

In general two types of pile load tests are conducted. They are:

Initial Test
Routine Test

The initial test is performed before the start of construction to assess the design adeq
routine test is performed on a working pile. This test is also known as work test. In init
load 5/2 times the working load in work test load is 3/2 times the design load.

Methods of Testing

There are two methods of testing piles. They include:

Maintained Test
Constant Rate of Penetration Test (CRP)

Maintained Load Test The maintained load test is a better method. This method pr
of both shaft and end resistance. In this method the contribution of each soil layer can
but it is time consuming. The failure load is not clearly de ned.

Loading Depending upon the workload, the load is applied by any one of the followi

Directly through a kentledge for smaller loads


By taking reaction against a kentledge for loads upto 5000 kN
By jacking against a beam or truss connecting adjacent anchor piles or loads high
kN

The typical loading of the piles are shown in Fig.1 below.

https://bestengineeringprojects.com/pile-load-test/ 2/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects

Distance of anchor piles from test pile The distance cannot be less than 1.5 m. It s
less than 4 times the diameter of test pile for straight pile and not less than 2 times th
the bell for belled pile.

Load Application The load is applied in the pile in the following sequence.

Load applied in increment at the rate of 25 % of working load till working load is

https://bestengineeringprojects.com/pile-load-test/ 3/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects

For each load increment maintain the load constant till settlement is 0.1 mm for
Code, 0.1 mm for 20 min as per BS Code
Go for next loading
When working load is reached hold the load for 24 hr and unload
Reload from working load to higher loads
Hold load constant till settlement is 0.1 mm for 5 min as per IS Code, 0.1 mm for
BS Code
Repeat the process for subsequent load increments
Go either up to 5/2 times the working load for initial or routine test or to a settlem
10 % of pile diameter for straight piles and 7.5 % of base diameter for belled pile

Fig.2 shows the time settlement and load settlement curves.

A load settlement curve for point bearing pile is shown in Fig.3.

Load Measurement The load is measured by any one of the following equipment

Burdon Gauge
Proving Ring
Load Cell

https://bestengineeringprojects.com/pile-load-test/ 4/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects

Settlement Measurement The settlement is measured either by a dial gauge or by


instrument.

Ultimate Load The failure load is taken as either of the followings.

2/3rd of nal load casing 12 mm settlement


load causing a total settlement of 10 % of pile diameter for straight piles or 7.5
diameter for a belled pile.

Constant Rate of Penetration Test This test is most suitable for friction pile. In this
de ned failure load is obtained and the method is very quick. However, this method d
elastic settlement at working load.

Method of Testing In this method, the pile is jacked continuously into soil at a const
failure takes place. The jacking rate in clay is 0.75 mm/min and a small movement req
In sands, the jacking rate is 5 mm/min and a large movement required for failure.

Failure The failure is de ned as follows.

Load at which pile continues to move downwards without any further loading or
Load at which settlement is 10 % of pile diameter

https://bestengineeringprojects.com/pile-load-test/ 5/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects

The typical load settlement curves are shown in g.4 below.

Pile Capacity Based on SPT Results Group Action of Piles | Settlement Bearing Capacity of P
and Static Cone Penetration (CPT) of Pile Groups in Clay and in Sand Clay, sands and in Gr
Results September 30, 2013 September 30, 2013
September 30, 2013 In "Civil Projects" In "Civil Projects"
In "Civil Projects"

FILED UNDER: CIVIL PROJECTS, FOUNDATION, PILED FOUNDATION

YOU MAY ALSO LIKE

https://bestengineeringprojects.com/pile-load-test/ 6/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects

New DelhiTirupati CROCS Men's Casual CO2 Laser cutting Group Acti
on 10,Jan 2018 Sandals (BROWN ,... systems | Settlemen
Groups in C
Ad www.makemytrip.com Ad ajio.com Ad www.gboslaser.com bestengineeringpro

Pile Capacity Based Pile Driving Formula | Negative Skin Underpinni


on SPT Results and Engineering News Fraction on Single Underpinni
Static Cone... Formula Pile and on Pile... Methods an

bestengineeringprojects.com bestengineeringprojects.com bestengineeringprojects.com bestengineeringpro

ABOUT ENGINEEERING PROJECTS


Hello! I am Krishan Keshab Chaudhary, Founder and Chief Strategy
Dreamlover Technology.
I edit and author this site.You can connect with me on : Google Plus
Facebook. If you have any comments or suggestions please use our contact page
We strictly ignore emails regarding post helps or explanation of circuits and proje
those purpose please use our comment feature ; We will surely help you by replyi
comment; It may helps other too.

Negative Skin Fraction on Single Pile and on Pile Group Staircase

https://bestengineeringprojects.com/pile-load-test/ 7/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects

2 Comments bestengineeringprojects

Recommend Share

Join the discussion

LOG IN WITH
OR SIGN UP WITH DISQUS ?

Name

Md. Borhan khandoker 2 years ago


very important. thank you.
Reply Share

Jack Palmer 2 years ago


I thought it was rather interesting to learn, "The initial test is performed before the start o
assess the design adequacy." I think it's really smart to run tests before the pile installat
make sure everything looks right before starting. My brother-in-law has decided he is go
construction in school and make it a career. I wonder if he will learn about this? Thanks
Reply Share

ALSO ON BESTENGINEERINGPROJECTS

Audio Power Amplifier CONTACT US!


2 comments 4 months ago 3 comments a year ago

AvatarBestEngineeringProjects Thank you Eva Finch AvatarSoumitra Seth GOOD AFTERN


for suggestion.But here in this section (i.e. ??????????
Electronics Design) we are trying to post only

Auto Cut Circuit for Over and Under Voltage Organ Circuit | Top Octave Gene
2 comments 4 months ago 1 comment 4 months ago

AvatarBestEngineeringProjects Thank you Mr. Reeko AvatarAsterix One gripe that I've had
Azil for letting us know. We had updated the circuit electronic organs is not the absol
diagram with possible modification. individual notes on an evenly-tem

Subscribe d Add Disqus to your siteAdd DisqusAdd Privacy

Search this website...

GET DAILY UPDATES VIA EMAIL

Join 689 other subscribers

https://bestengineeringprojects.com/pile-load-test/ 8/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects

Enter your email

SUBSCRIBE

New
DelhiTirupati on
10,Jan 2018
4,764 only

New
DelhiTirupati on
13,Nov 2017...
9,427 only

New
DelhiTirupati on
9,Jan 2018
5,257 only

New
DelhiTirupati on
14,Nov 2017...
6,465 only

New
DelhiJammu on
12,Nov 2017
4,758 only

MumbaiGoa on
12,Nov 2017
Return
2,870 only

makemytrip.com

CATEGORIES

555 Timer Projects (55)

8051 Projects (11)


AC Voltage Stabilizer (6)

alarm / sound generator (29)

Ampli er Circuit (18)


https://bestengineeringprojects.com/pile-load-test/ 9/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects

Arduino Projects (33)

ATmega Projects (7)

Automobile Engineering (8)


Automotive Circuit (4)

AVR Projects (6)

Basic Electronic Projects (41)


Bearing Capacity Theories (17)

C Based Project (18)

C++ Based Projects (5)


Civil Projects (122)

Co erdams (3)

Communication Based Projects (19)


Computer Projects (25)

Conductor and Connection (1)

Digital Electronics Projects (24)


Earth Pressure and Retaining Wall (19)

Easy Electronics Projects (17)

Electrical Projects (1)


Electrical Symbols (1)

Electronic Game and Fun Projects (12)

Electronic Measurement and Tester Circuit (29)


Electronic Timer Circuit (8)

Electronic Tutorial (7)

Electronics Design (18)


Electronics Projects (322)

Electronics Troubleshooting (15)


Foundation (122)

Geotechnical Process (7)

IC 741 Based Projects (27)


IOT Projects (1)

JAVA Based Projects (2)

Led Projects (2)

https://bestengineeringprojects.com/pile-load-test/ 10/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects

Machine Foundation (12)

Mat Foundation (5)

Microcontroller Projects (23)


Microprocessor Program (2)

Motor Driver Circuit (9)

Numerical method Lab Manual (1)


Op amp Tutorials (1)

PIC Projects (3)


Piers and Caissons (7)

Piled Foundation (15)

power supply (35)


Preampli er Circuit (12)

RFID Projects (1)

Robotics (3)
Sheet Pile Wall (6)

Site Investigation (20)

Spread Foundation (9)

Switching and Controlling (35)

Top 10 Electronics Projects (1)

Dreamlover Technology
5,554 likes

Like Page Contact Us

Be the first of your friends to like this

https://bestengineeringprojects.com/pile-load-test/ 11/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects

Google+

best engineering projects


google.com/+Bestengineeringprojectsbep

electronics projects,free civil tutorials,free


computer projects,free foundation tutorials

Follow

POPULAR PROJECTS

24-Hour Digital Clock and Timer


Crcuit

Arduino Gesture Controlled Robot

Adjustable Ripple-Regulated Power


Supply Using 741

Sound detector circuit using op-


amp 741

Automatic Voltage Stabiliser Circuit

Battery Voltage State Indicator


using 741

Automatic Light Operated Switch


using LDR and IC741

Sinking of the Well

https://bestengineeringprojects.com/pile-load-test/ 12/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects

Mat Foundation | Types of Mat


Foundation

RECENT POSTS:

Elementary Database Management System


using C

Arduino and ESP8622 Based Web Server


Arduino Gesture Controlled Robot

PIC16F877A Based Dual Mode Robot

Automobile Brake Failure Indicator

HOT TOPIC

1. Best Arduino Projects


2. Complete Electrical Symbol
3. Project Using 555 and 556
4. Easy Electronic Projects
5. Electronic Game and Fun Projects

Copyright 2017

https://bestengineeringprojects.com/pile-load-test/ 13/14
11/13/2017 Pile Load Test | Purpose of Pile Load Test | Best Engineering Projects

https://bestengineeringprojects.com/pile-load-test/ 14/14

S-ar putea să vă placă și