Sunteți pe pagina 1din 11

LEGEND

............. P.P.R. for cold water


............. P.P.R. for hot water
............. Gate valve
............. One way valve
@HL ............. At higher level
T/LL ............. To lower level
F/HL ............. From higher level
F/B ............. From below
F/A ............. From above
T/A ............. To above
T/B ............. To below
FW ............. Fire Water

1 12
gate valve and coupling connection to drain
the water tank
1 inch hose of approved quality
with coupling connection to fill
1" inch coupling connection to fill the the wate tank
water tank, provide a similar connection
in the basement water supply line as appropriate
T/LL
1 12 inch canvas hose with coupling
T/LL connection for draining the water
Q = 0.5 L/sec @ H = 15 with pressure tank to outside, Total hose length = 50m
switch for automatic operation to be
connected to emergency electric power
source (one is stand by)

1" heavey duty

2500
Waste Water 2.5x2x1.5 (height) mxmxm bronze floot
Waste Water
Riser stainless steel water tank with steel valve
Riser
or equivalent support .water tank bottom
level +1.5m from basement level
2000 Key Plan

SAFE HEAVEN STORE


1. Final Design Issued March 24,2016
SAFE HEAVEN No. Description/ Reference Date

STORE SAFE HEAVEN


STORE
STORE
SB Consult
&
HALL
ABAY Architects
f.f Granite T.

Client
FDRE PALACE ADMISTRATION
PANORAMIC
LIFT
GENERAL STORE Project Title & Address
f.f Granite T.
MEKELE PALACE
STAIRCASE
GAME/CINIMA RM.
GUEST HOUSE COMPLEX
f.f Granite T.
f.f Granite T.

EL. RM

Status
W-1 Water Supply
Final Design
Riser
BOILER/MACHINE RM.
f.f Granite T.
SERVICE STAIR Drawing Name
f.f Granite T.
UTILITY RM.
f.f Granite T. Head Of State House
18 18

17 17

MCH.RM SERVICE
LIFT
16

15
16

15
LEVEL- 0
Waste Water Waste Water
14 14

Riser
Riser
13

12
13

12
WATER SUPPLY LAYOUT
11 11

Adapter
Scale Project No. Date
10 10

1:150 Jan 19,2016

Drawn by
BIZUAYEHU TAMERAT CEA 1565

Design Team
HAYEMERO DAGNEW PPSNE-016

LEVEL 0 FLOOR WATER SUPPLY Checked by


LAYOUT SC,1:150 WOREDE MELAKU PPSNE-09

DWG. ID
SN- 101
LEGEND
............. P.P.R. for cold water
............. P.P.R. for hot water
............. Gate valve
............. One way valve
@HL ............. At higher level
T/LL ............. To lower level
F/HL ............. From higher level
F/B ............. From below
F/A ............. From above
T/A ............. To above
T/B ............. To below
1 2 3 4 5 6 7 8 9 FW ............. Fire Water

Key Plan
F

Waste Water Waste Water


Riser Riser
BAR PATIO
f.f Granite T.
Traditional Kitchen 1. Final Design Issued March 24,2016
f.f Granite T.
No. Description/ Reference Date
GYMNASIUM

BEV. ST.
W.C.
f.f Porcelain T.
f.f Granite T.
SB Consult
f.f Granite T.

E DAY STORE
&
f.f Granite T.

ABAY Architects
UTENSIL ST. HAIR DRESSER FOYER
f.f Granite T. f.f Granite T. f.f Granite T. LOBBY
f.f Granite T. Client

CORRIDOR
FDRE PALACE ADMISTRATION
f.f Granite T.
LOBBY To water feature
D f.f Granite T. PANORAMIC Project Title & Address
LIFT

COLD ST./FREEZ.
STORE
f.f Granite T.
LOCKER/CHANGING
f.f Granite T. MEKELE PALACE
f.f Granite T.
JAN. GUEST HOUSE COMPLEX
f.f Granite T.

SHOWER

CORRIDOR SAUNA
f.f Granite T. f.f Granite T.
EL. RM SHOWER Status
C W-1
LINEN ST.
Final Design
Water Supply f.f Granite T. STEAM
MAIN KITCHEN SERVICE STAIR Riser SECURITY BEDRM.
f.f Granite T. f.f Granite T. STAIRCASE f.f Granite T.
f.f Granite T.
f.f Granite T. Drawing Name

LAUNDRY
f.f Granite T.
SECURITY BEDRM. Head Of State Guest House
f.f Granite T.
MASSAGE RESTING
MCH.RM SERVICE
Waste Water LIFT Waste Water
LEVEL 1 FLOOR WATER SUPPLY LAYOUT
Riser Riser
12

B 11

Scale Project No. Date


1:150 Jan 19,2016

Drawn by
BIZUAYEHU TAMERAT CEA 1565

Design Team
HAYEMERO DAGNEW PPSNE-016

Checked by
LEVEL 1 FLOOR WATER SUPPLY WOREDE MELAKU PPSNE-09
LAYOUT SC,1:150 DWG. ID
SN- 102
LEGEND
............. P.P.R. for cold water
............. P.P.R. for hot water
............. Gate valve
1 2 3 4 5 6 7 8 9
............. One way valve
@HL ............. At higher level
T/LL ............. To lower level
F/HL ............. From higher level
F/B ............. From below
F/A ............. From above
T/A ............. To above
T/B ............. To below
FW ............. Fire Water

Waste Water Waste Water


Riser Riser

RECEPTION PROTOCOL
SECURITY/ f.f Parquet T. f.f Parquet T.
Key Plan
MONITORING
f.f Granite T.

1. Final Design Issued March 24,2016


E
No. Description/ Reference Date

DINING ROOM
f.f Parquet T.
SB Consult
&
PANORAMIC SALON
ABAY Architects
D LIFT f.f Parquet T.

Client
FDRE PALACE ADMISTRATION

Project Title & Address


slab line above
MEKELE PALACE
EL. RM
W-1
GUEST HOUSE COMPLEX
C LOBBY
f.f Granite T.
Water Supply
Riser
STAIRCASE
SERVICE STAIR f.f Granite T. Status
f.f Granite T.
Final Design
18 18

MCH.RM SERVICE 17 17

Drawing Name
Waste Water
16 16

LIFT 15 15
Waste Water
Riser 14 14
Riser
13

12
13

12
Head Of State Guest House
B 11 11

10 10

LEVEL 2 FLOOR WATER SUPPLY LAYOUT

Scale Project No. Date


1:150 Jan 19,2016

Drawn by
BIZUAYEHU TAMERAT CEA 1565

Design Team
LEVEL 2 FLOOR WATER SUPPLY HAYEMERO DAGNEW PPSNE-016

LAYOUT SC,1:150 Checked by


WOREDE MELAKU PPSNE-09

DWG. ID
SN- 103
LEGEND
............. P.P.R. for cold water
............. P.P.R. for hot water
............. Gate valve
............. One way valve
@HL ............. At higher level
B T/LL ............. To lower level
F/HL ............. From higher level
F/B ............. From below
1 2 3 4 5 6 7 8 9
F/A ............. From above
T/A ............. To above
T/B ............. To below
FW ............. Fire Water

BALCONY
BALCONY

DRESSING DRESSING
Key Plan
MASTER BEDROOM-1 MASTER BEDROOM-2
wc f.f Parquet T. f.f Parquet T.
BATH RM.
f.f Porcelain T.

CLOSET CLOSET
f.f Parquet T. f.f Parquet T.
1. Final Design Issued March 24,2016
No. Description/ Reference Date

E
SB Consult
CORRIDOR
OFFICE
&
f.f Granite T.
f.f Parquet T.

ABAY Architects
@HL
BALCONY
PANORAMIC Client
D PRIVATE LIFT
LIVING/DINING FDRE PALACE ADMISTRATION
BALCONY
f.f Parquet T.
STORE
Project Title & Address
BEDROOM-2
f.f Parquet T.
MEKELE PALACE
GUEST HOUSE COMPLEX
EL. RM W-1
@HL
C
OPEN DOWN
Status
Water Supply
SERVICE STAIR STAIR C.
f.f Granite T.
Riser
f.f Granite T. Final Design

PRIVATE KITCHEN BEDROOM-1 Drawing Name


f.f Granite T. 18 18
f.f Parquet T.
MCH.RM SERVICE
17

16
17

16
Head Of State Guest House
LIFT 15 15

14 14

13 13

12 12

B 11

10
11

10
LEVEL 3 FLOOR WATER SUPPLY LAYOUT

Scale Project No. Date


1:150 Jan 19,2016

Drawn by
BIZUAYEHU TAMERAT CEA 1565

Design Team
LEVEL 3 FLOOR WATER SUPPLY HAYEMERO DAGNEW PPSNE-016

LAYOUT SC,1:150 Checked by


WOREDE MELAKU PPSNE-09

DWG. ID
SN- 104
LEGEND
WASTE WATER RISER DIAGRAM ............. P.P.R. for cold water
SC.1:50 ............. P.P.R. for hot water
............. One way valve
............. Gate valve
H.W. ............. Hand wash basin
W.C. ............. Low flush water closet
S.H. ............ Shower
K.S. ............. Kitchen sink
B.T.............. Bathtap
H.W. J.A. ............. Jacuzzi
W1 ............. Water Riser

W-1
Key Plan

1. Final Design Issued March 24,2016


No. Description/ Reference Date

SB Consult
&
ABAY Architects
Client
FDRE PALACE ADMISTRATION

Project Title & Address

MEKELE PALACE
GUEST HOUSE COMPLEX

Status
Final Design

Drawing Name

Head Of State Guest House

WATER RISER DIAGRAM

Scale Project No. Date


1:150 Jan 19,2016

Drawn by
BIZUAYEHU TAMERAT CEA 1565

Design Team
HAYEMERO DAGNEW PPSNE-016

Checked by
WOREDE MELAKU PPSNE-09

DWG. ID
SN- 110
LEGEND
............. PVC waste pipe
............. PVC vent pipe
@HL ............. At higher level
T/LL ............. To lower level
F/HL ............. From higher level
F/B ............. From below
F/A ............. From above
T/A ............. To above
T/B ............. To below
1 2 3 4 5 6 7 8 9

M.H. B M.H. M.H.

G
UPVC PIPE

2570
F 2500
Waste Water 600 2100 F.W.G Waste Water
Riser 355 Riser

2900
2500
F.W.G 600 SAFE HEAVEN STORE Key Plan

600
1. Final Design Issued March 24,2016
SAFE HEAVEN

1430
STORE STORE Description/ Reference
SAFE HEAVEN No. Date
E
SB Consult
F.W.G
&
UPVCPIPE HALL
f.f Granite T.
ABAY Architects
@HL F.W.G Client
PANORAMIC
D LIFT
FDRE PALACE ADMISTRATION
GENERAL STORE
f.f Granite T. UPVCPIPE
Project Title & Address

STAIRCASE
f.f Granite T. GAME/CINIMA RM. MEKELE PALACE
f.f Granite T.
GUEST HOUSE COMPLEX
EL. RM
BOILER/MACHINE RM. Status
C f.f Granite T.
Water Supply Final Design
Riser
SERVICE STAIR
f.f Granite T.
Drawing Name
UTILITY RM.
Head Of State Guest House
18 18

17 17

MCH.RM SERVICE
LEVEL 0 FLOOR WASTE WATER
16 16

Waste Water LIFT 15 15

Waste Water
14 14

Riser
13

12
13

12
Riser
DRAINAGE LAYOUT
B 11 11

10 10

Scale Project No. Date


1:150 Jan 19,2016
UPVCPIPE
UPVCPIPE
Drawn by
BIZUAYEHU TAMERAT CEA 1565

Design Team
HAYEMERO DAGNEW PPSNE-016

LEVEL 0 FLOOR WASTE WATER DRAINAGE Checked by


LAYOUT SC,1:150 WOREDE MELAKU PPSNE-09

DWG. ID
SN- 120
LEGEND
............. PVC waste pipe
............. PVC vent pipe
@HL ............. At higher level
T/LL ............. To lower level
F/HL ............. From higher level
F/B ............. From below
F/A ............. From above
T/A ............. To above
T/B ............. To below

1 2 3 4 5 6 7 8 9

M.H. M.H. M.H. M.H. M.H. M.H. M.H.

& T/B
& T/B Key Plan
F

Waste Water Waste Water


& T/A
v2
Riser
BAR @HL Riser
PATIO
F.D. S1 f.f Granite T. S2
Traditional Kitchen & T/B T/HL & T/B
f.f Granite T. 1. Final Design Issued March 24,2016
No. Description/ Reference Date
GYMNASIUM
f.f Granite T.
BEV. ST.
f.f Granite T.
W.C.
f.f Porcelain T. SB Consult
E DAY STORE
f.f Granite T.
&
@HL

UTENSIL ST. HAIR DRESSER FOYER & T/B


ABAY Architects
f.f Granite T. f.f Granite T. f.f Granite T. LOBBY F/B & T/HL @HL from water feature
& T/B f.f Granite T.
storm water line
from water feature Client
CORRIDOR
f.f Granite T. FDRE PALACE ADMISTRATION
M.H. & T/B
S4 T/HL
LOBBY
D f.f Granite T. PANORAMIC
LIFT F.W.G.
STORE LOCKER/CHANGING Project Title & Address
COLD ST./FREEZ. f.f Granite T. f.f Granite T. M.H.
f.f Granite T.
JAN.
f.f Granite T.
T/HL
MEKELE PALACE
SHOWER
GUEST HOUSE COMPLEX
CORRIDOR SAUNA
f.f Granite T. f.f Granite T.
EL. RM
@HL @HL SHOWER
C M.H.
LINEN ST.
Status
Water Supply f.f Granite T. STEAM
MAIN KITCHEN
f.f Granite T.
SERVICE STAIR
f.f Granite T.
Riser SECURITY BEDRM.
f.f Granite T.
STAIRCASE f.f Granite T. Final Design
f.f Granite T. F.D.

LAUNDRY SECURITY BEDRM. Drawing Name


f.f Granite T. f.f Granite T.
@HL
M.H. F.D. S5 MCH.RM
MASSAGE RESTING Head Of State Guest House
& T/B SERVICE
T/HL &Waste
T/BWater
S3
Waste Water LIFT
Riser Riser
12
@HL LEVEL 1 FLOOR WASTE WATER
B 11

DRAINAGE LAYOUT
& T/A
v3
& T/B Scale Project No. Date
& T/B
1:150 Jan 19,2016

Drawn by
M.H. M.H. M.H. M.H. M.H. BIZUAYEHU TAMERAT CEA 1565

Design Team

LEVEL 1 WASTE WATER DRAINAGE HAYEMERO DAGNEW PPSNE-016

LAYOUT SC,1:150 Checked by


WOREDE MELAKU PPSNE-09

DWG. ID
SN- 121
LEGEND
............. PVC waste pipe
1 2 3 4 5 6 7 8 9 ............. PVC vent pipe
@HL ............. At higher level
T/LL ............. To lower level
F/HL ............. From higher level
B F/B ............. From below
F/A ............. From above
T/A ............. To above
T/B ............. To below

S1 & T/B & T/A v2


F

Waste Water Waste Water


Riser
T/HL
Riser
& T/B
S2 Key Plan
RECEPTION PROTOCOL
SECURITY/ f.f Parquet T. f.f Parquet T.
MONITORING
f.f Granite T. T/HL

1. Final Design Issued March 24,2016


F.W.G No. Description/ Reference Date
E

SB Consult
DINING ROOM
f.f Parquet T. &
ABAY Architects
PANORAMIC SALON Client
D LIFT f.f Parquet T.
FDRE PALACE ADMISTRATION

& T/B
S4
Project Title & Address

slab line above


MEKELE PALACE
EL. RM GUEST HOUSE COMPLEX
C LOBBY
f.f Granite T.
Water Supply
F.W.G
Riser
STAIRCASE
Status
SERVICE STAIR
f.f Granite T.
f.f Granite T. Final Design
F.D
T/HL
18 18
Drawing Name
MCH.RM SERVICE 17 17

& T/B S3
Head Of State Guest House
16 16

LIFT
Waste Water
Riser & T/B
S5 15 15

T/HL Waste Water


14 14
Riser
13 13

B
12

11
12

11
LEVEL 2 FLOOR WASTE WATER
10 10

DRAINAGE LAYOUT
& T/A v3
Scale Project No. Date
1:150 Jan 19,2016

Drawn by
BIZUAYEHU TAMERAT CEA 1565

Design Team
HAYEMERO DAGNEW PPSNE-016

LEVEL 2 FLOOR WASTE WATER DRAINAGE Checked by


WOREDE MELAKU PPSNE-09
LAYOUT SC,1:150
DWG. ID
SN- 122
LEGEND
............. PVC waste pipe
............. PVC vent pipe
B @HL ............. At higher level
T/LL ............. To lower level
F/HL ............. From higher level
1 2 3 4 5 6 7 8 9
F/B ............. From below
F/A ............. From above
T/A ............. To above
T/B ............. To below

BALCONY
BALCONY

S1 v2
F
Key Plan
S2
DRESSING DRESSING
MASTER BEDROOM-1 MASTER BEDROOM-2
wc f.f Parquet T. f.f Parquet T.
BATH RM.
f.f Porcelain T.
1. Final Design Issued March 24,2016
CLOSET CLOSET
f.f Parquet T. f.f Parquet T. No. Description/ Reference Date
F.W.G
F.W.G

E
SB Consult
&
CORRIDOR
f.f Granite T.
OFFICE
f.f Parquet T. ABAY Architects
Client
BALCONY S4
PANORAMIC FDRE PALACE ADMISTRATION
D PRIVATE LIFT
LIVING/DINING
BALCONY
f.f Parquet T.
Project Title & Address
STORE
BEDROOM-2
f.f Parquet T.
MEKELE PALACE
GUEST HOUSE COMPLEX
EL. RM

C
OPEN DOWN
Status
Water Supply
SERVICE STAIR STAIR C.
f.f Granite T.
Riser
f.f Granite T. Final Design
T/HL
PRIVATE KITCHEN
f.f Granite T. BEDROOM-1 Drawing Name
18 18
f.f Parquet T.
MCH.RM SERVICE
17

16
17

16
Head Of State Guest House
LIFT 15

14
15

14
v3
13

12
13

12
S3 LEVEL 3 FLOOR WASTE WATER
B 11

10
11

10 DRAINAGE LAYOUT
S5
Scale Project No. Date
1:150 Jan 19,2016

Drawn by
BIZUAYEHU TAMERAT CEA 1565

Design Team
HAYEMERO DAGNEW PPSNE-016

LEVEL 3 FLOOR WASTE WATER DRAINAGE Checked by


LAYOUT SC,1:150 WOREDE MELAKU PPSNE-09

DWG. ID
SN- 123
1 2 3 4 5 6 7 8 9

& T/B & T/B


F
Key Plan

S1 S2

S=2%
S=2 1. Final Design Issued March 24,2016
%
No. Description/ Reference Date

E
SB Consult
S=2%
S=2% &
& T/B
& T/B ABAY Architects
S4 Client

D
FDRE PALACE ADMISTRATION

Project Title & Address

MEKELE PALACE
GUEST HOUSE COMPLEX

C
Status
Final Design

Drawing Name

Head Of State Guest House


S5
S3 ROOF LEVEL
B
STORM WATER DRAINAGE LAYOUT
& T/B & T/B
Scale Project No. Date
1:150 Jan 19,2016

Drawn by
BIZUAYEHU TAMERAT CEA 1565

ROOF LEVEL STORM WATER DRAINAGE Design Team

LAYOUT SC,1:150 HAYEMERO DAGNEW PPSNE-016

Checked by
WOREDE MELAKU PPSNE-09

DWG. ID
SN- 124
LEGEND
............. PVC waste pipe
............. PVC vent pipe
H.W. ............. Hand wash basin
W.C. ............. Low flush water closet
S.H. ............ Shower
K.S. ............. Kitchen sink
F.D.............. Floor drin
B.T. ............. Bathtap
J.A. ............. Jacuzzi
C.O. ............. clean out
WASTE WATER RISER DIAGRAM F.C.O.............. floor clean out
SC.1:50 S4 S1 ............. Waste water riser

v3 S3 H.W.

@HL @HL

@HL W.C.
SECOND
A FLOOR

H.W. W.C.

@HL FIRST
H.W. H.W. FLOOR
SECOND
@HL FLOOR
H.W. V.P.

H.W. W.C. W.C.


Key Plan
F.W.G
S.H.
@HL S.H. GROUND
FLOOR
@HL
TO MH
FIRST
FLOOR
@HL
W.C. @HL
S.H. @HL @HL
L.B.
H.W.
A 1. Final Design Issued March 24,2016
W.C. No. Description/ Reference Date
GROUND
FLOOR
FIRST S2
GROUND
FLOOR
W.C.
FLOOR

SB Consult
W.C.

&
S.H.
H.W.
TO MH
SECOND
FLOOR
W.C.
H.W.
TO MH
v2
F.D.
GROUND
FLOOR

TO MH
ABAY Architects
GROUND @HL
GROUND FLOOR
FLOOR
Client
@HL

S1 TO MH F.W.G J.A. FDRE PALACE ADMISTRATION


S.H.

FIRST
@HL FLOOR
Project Title & Address
SECOND W.C. S5
FLOOR
W.C. H.W.
W.C. W.C.

H.W.
H.W.
W.C.

K.S.
MEKELE PALACE
SECOND

@HL
H.W.
F.W.G
FLOOR
GUEST HOUSE COMPLEX
TO MH
GROUND
J.A. FLOOR
F.W.G
@HL
FIRST K.S.
S.H. FLOOR TO MH
F.D.

Status
BASEMENT
FIRST
FLOOR Final Design
FLOOR
@HL

GROUND Drawing Name


FLOOR
TO MH

TO MH @HL Head Of State Guest House


H.W. H.W.
GROUND
TO MH
FLOOR
F.W.G
BASEMENT
FLOOR
@HL
TO MH W.C.
WASTE WATER RISER DIAGRAM
H.W. H.W. W.C.
BASEMENT
FLOOR
S.H. S.H. F.W.G W.C.
H.W.
TO MH
Scale Project No. Date
H.W. W.C.

BASEMENT 1:150 Jan 19,2016


FLOOR
W.C.

Drawn by
W.C.

BIZUAYEHU TAMERAT CEA 1565

Design Team
HAYEMERO DAGNEW PPSNE-016

Checked by
WOREDE MELAKU PPSNE-09

DWG. ID
SN- 130