Task Rolled Up Baseline Group By Summary Manual Summary Rollup Baseline Milestone
Critical Rolled Up Baseline Milestone Inactive Task Manual Summary Baseline Summary
Project: BLCP Outage 2017 Unit 1 Critical Split Rolled Up Progress Inactive Milestone Start-only Progress
Date: Mon 10/23/17 Milestone Split Inactive Milestone Finish-only Deadline
Prepared: Paramee Kullanatpokin
Summary Baseline Split Inactive Summary External Tasks
Rolled Up Task External Tasks Manual Task External Milestone
Rolled Up Milestone Project Summary Duration-only Baseline
Page 1
2017 Outage Unit 1 EMJ Execution Plan
ID Task Name % Complete Duration Start Finish RO Qtr 4, 2017 Q
Oct Nov Dec
122 Front Side - 225 points 0% 15 days Wed 10/25/17 Thu 11/9/17 Wed Oct 25 Thu Nov 9
123 Temporary winch setting for 1ry RH tube lift
Temporary winch setting for 1ry RH tube lift 0% 7.54 days Mon 10/23/17 Mon 10/30/17 BL
124 Install temporary support at Roof Housing 0% 2 days Mon 10/23/17 Wed 10/25/17 Mon Oct 23 Wed Oct 25
125 Install temporary winch at Boiler Inside
Install temporary winch at Boiler Inside 0% 1 day Sun 10/29/17 Mon 10/30/17
126 Install temporary winch - Left side 0% 1 day Sun 10/29/17 Mon 10/30/17 Sun Oct 29 Mon Oct 30
127 Install temporary winch - Right Side 0% 1 day Sun 10/29/17 Mon 10/30/17 Sun Oct 29 Mon Oct 30
128 Install temporary winch - Front Side 0% 1 day Sun 10/29/17 Mon 10/30/17 Sun Oct 29 Mon Oct 30
129 RH Tube Cutting(1ry RH inlet header) 0% 10 days Wed 10/25/17 Sat 11/4/17 BL
130 Right Side - 145 Joints 0% 10 days Wed 10/25/17 Sat 11/4/17 Wed Oct 25 Sat Nov 4
131 Left Side - 145 Joints 0% 10 days Wed 10/25/17 Sat 11/4/17 Wed Oct 25 Sat Nov 4
132 Front Side - 297 Joints 0% 20 days Wed 10/25/17 Tue 11/14/17 Wed Oct 25 Tue Nov 14
RH Tube Beveling 1ry RH inlet header
133 RH Tube Beveling 1ry RH inlet header 0% 20 days Fri 10/27/17 Thu 11/16/17 BL
134 Right Side - 145 Joints 0% 10 days Fri 10/27/17 Mon 11/6/17 Fri Oct 27 Mon Nov 6
135 Left Side - 145 Joints 0% 10 days Fri 10/27/17 Mon 11/6/17 Fri Oct 27 Mon Nov 6
136 Front Side - 297 Joints 0% 20 days Fri 10/27/17 Thu 11/16/17 Fri Oct 27 Thu Nov 16
137 Sun Oct 29 Tue Nov 28
Cutting 1ry RH tube (Furnace inside - Bottom) 0% 30 days Sun 10/29/17 Tue 11/28/17
138 Cutting 1ry RH tube (Furnace inside - Top)
Cutting 1ry RH tube (Furnace inside - Top) 0% 15 days Mon 10/30/17 Tue 11/14/17
139 Right Side - 145 Joints 0% 10 days Mon 10/30/17 Thu 11/9/17 Mon Oct 30 Thu Nov 9
140 Left Side - 145 Joints 0% 10 days Mon 10/30/17 Thu 11/9/17 Mon Oct 30 Thu Nov 9
141 Front Side - 297 Joints 0% 15 days Mon 10/30/17 Tue 11/14/17 Mon Oct 30 Tue Nov 14
142 Remove stopper bottom side
Remove stopper bottom side 0% 15 days Mon 10/30/17 Tue 11/14/17 BL
143 Right Side - 37 PCS 0% 10 days Mon 10/30/17 Thu 11/9/17 Mon Oct 30 Thu Nov 9
144 Left Side - 37 PCS 0% 10 days Mon 10/30/17 Thu 11/9/17 Mon Oct 30 Thu Nov 9
145 Front Side - 75 PCS 0% 15 days Mon 10/30/17 Tue 11/14/17 Mon Oct 30 Tue Nov 14
146 Tube Remove to outside 0% 30 days Mon 10/30/17 Wed 11/29/17 BL Mon Oct 30 Wed Nov 29
147 Tube Beveling (Furnace inside)
Tube Beveling (Furnace inside) 0% 30 days Mon 10/30/17 Wed 11/29/17 BL
148 Right Side - 145 Joints 0% 30 days Mon 10/30/17 Wed 11/29/17 Mon Oct 30 Wed Nov 29
149 Left Side - 145 Joints 0% 30 days Mon 10/30/17 Wed 11/29/17 Mon Oct 30 Wed Nov 29
150 Front Side - 297 Joints 0% 30 days Mon 10/30/17 Wed 11/29/17 Mon Oct 30 Wed Nov 29
151 New 1ry RH tube Carry in Boiler 0% 30 days Mon 10/30/17 Wed 11/29/17 BL Mon Oct 30 Wed Nov 29
152 Fit up and welding 1ry RH
Fit up and welding 1ry RH Tube Front Side : 0% 37 days Sat 11/4/17 Mon 12/11/17 BL
594 Joints
153 Top Level (Inside) - 297 Joints 0% 37 days Sat 11/4/17 Mon 12/11/17 Sat Nov 4 Mon Dec 11
154 Bottom Level (Outside) - 297 Joints 0% 37 days Sat 11/4/17 Mon 12/11/17 Sat Nov 4 Mon Dec 11
155 Fit up and welding 1ry RH
Fit up and welding 1ry RH Tube Right Side : 0% 37 days Sat 11/4/17 Mon 12/11/17 BL
290 Joints
156 Top Level (Inside) - 145 Joints 0% 37 days Sat 11/4/17 Mon 12/11/17 Sat Nov 4 Mon Dec 11
157 Bottom Level (Outside) - 145 Joints 0% 37 days Sat 11/4/17 Mon 12/11/17 Sat Nov 4 Mon Dec 11
158 Fit up and welding 1ry RH
Fit up and welding 1ry RH Tube Left Side : 0% 37 days Sat 11/4/17 Mon 12/11/17 BL
290 Joints
159 Top Level (Inside) - 145 Joints 0% 37 days Sat 11/4/17 Mon 12/11/17 Sat Nov 4 Mon Dec 11
160 Bottom Level (Outside) - 145 Joints 0% 37 days Sat 11/4/17 Mon 12/11/17 Sat Nov 4 Mon Dec 11
161 Inspe
Inspection Nozzle 0% 26.4 days Thu 11/30/17 Tue 12/26/17
Task Rolled Up Baseline Group By Summary Manual Summary Rollup Baseline Milestone
Critical Rolled Up Baseline Milestone Inactive Task Manual Summary Baseline Summary
Project: BLCP Outage 2017 Unit 1 Critical Split Rolled Up Progress Inactive Milestone Start-only Progress
Date: Mon 10/23/17 Milestone Split Inactive Milestone Finish-only Deadline
Prepared: Paramee Kullanatpokin
Summary Baseline Split Inactive Summary External Tasks
Rolled Up Task External Tasks Manual Task External Milestone
Rolled Up Milestone Project Summary Duration-only Baseline
Page 2
2017 Outage Unit 1 EMJ Execution Plan
ID Task Name % Complete Duration Start Finish RO Qtr 4, 2017 Q
Oct Nov Dec
162 Inspection Hole (RH Inlet HDR) Cutting 0% 2 days Thu 11/30/17 Sat 12/2/17 BL Thu Nov 30 Sat Dec 2
163 HDR Inside Cleaning / Bore scope inspection 0% 1 day Sun 12/24/17 Mon 12/25/17 BL Sun Dec 24 Mon De
164 Fit up and welding for Inspection nozzle end 0% 1 day Mon 12/25/17 Tue 12/26/17 BL Mon Dec 25 Tue De
cap by PT Test.
165 Skin casing reins
Skin casing reinstallation (remainning for 0% 11 days Wed 12/6/17 Sun 12/17/17 BL
observation port- before hydrostatic test)
166 Right Side 0% 11 days Wed 12/6/17 Sun 12/17/17 Wed Dec 6 Sun Dec 17
167 Left Side 0% 11 days Wed 12/6/17 Sun 12/17/17 Wed Dec 6 Sun Dec 17
168 Front Side 0% 11 days Wed 12/6/17 Sun 12/17/17 Wed Dec 6 Sun Dec 17
169 Installation Refractory (remainning for 0% 16 days Fri 12/1/17 Sun 12/17/17 ES
observation port - before hydrostatic test)
170 Righ Side - 1 m3 (Approx.) 0% 4 days Fri 12/1/17 Tue 12/5/17 Fri Dec 1 Tue Dec 5
171 Left Side- 1 m3 (Approx.) 0% 4 days Fri 12/1/17 Tue 12/5/17 Fri Dec 1 Tue Dec 5
172 Front Side - 2 m3 (Approx.) 0% 6 days Fri 12/1/17 Thu 12/7/17 Fri Dec 1 Thu Dec 7
173 Mon Dec 18 Wed Dec 20
Skin casing reinstallation for observation port 0% 2 days Mon 12/18/17 Wed 12/20/17
174 Mon Dec 18 Wed Dec 20
Insulation& Lagging Restoration 0% 2 days Mon 12/18/17 Wed 12/20/17 ES
175 Wed Dec 20 Fri Dec 22
Scaffolding Dismantle 0% 2 days Wed 12/20/17 Fri 12/22/17 ES
176 1ry RH bypas
1ry RH bypass line pipe 8% 62.33 days Thu 10/19/17 Wed 12/20/17 BL
184 Stub tub
Stub tube replacement 19% 68.78 days Mon 10/16/17 Sun 12/24/17
193 Boiler Testing
Boiler Testing 0% 4.33 days Thu 12/14/17 Mon 12/18/17 BL
199 Mon Dec 18 Fri Dec 22
Remove scaffolding 0% 4 days Mon 12/18/17 Fri 12/22/17 BL
200 Operation Start Up
Operation Start Up Plant 0% 1.04 days Fri 12/15/17 Sat 12/16/17
210 Main
Main Turbine actual MOST test 0% 0.69 days Mon 12/25/17 Tue 12/26/17
Task Rolled Up Baseline Group By Summary Manual Summary Rollup Baseline Milestone
Critical Rolled Up Baseline Milestone Inactive Task Manual Summary Baseline Summary
Project: BLCP Outage 2017 Unit 1 Critical Split Rolled Up Progress Inactive Milestone Start-only Progress
Date: Mon 10/23/17 Milestone Split Inactive Milestone Finish-only Deadline
Prepared: Paramee Kullanatpokin
Summary Baseline Split Inactive Summary External Tasks
Rolled Up Task External Tasks Manual Task External Milestone
Rolled Up Milestone Project Summary Duration-only Baseline
Page 3