Start-Up & Shut Down

Procedures:
Underground Loaders

Operator/Inspector_____________________ Date__________________ Time__________________


Was procedure step completed properly? 9 Evaluator Comments
Always read and understand the OMM before operating

STARTING THE MACHINE


Turn the Battery Disconnect Switch to ON (if equipped)
T T

TEngage the Parking Brake T

Adjust Seat, Fasten Seat Belt


T T

Move Direction Control Lever to Neutral


T T

Ensure all Implements are Grounded


T T

Move the Attachment Control Lever to HOLD


T T

Ensure all Personnel are Clear of Machine


T T

Sound Horn
T T

Turn Key Start Switch to ON


T T

Perform Startup Test to Observe Monitoring System Self-Test (if


T

applicable)
T

Turn Key Start Switch to START. Crank Engine


T T

MACHINE WARM-UP
Allow Machine to Warm Up (as per OMM)
T T

Engage and Disengage Attachment Controls to help speed


T

warm-up of Hydraulic Components T

Cycle all Control to allow warm Oil to circulate through all


T

Hydraulic Cylinders and Lines T

Perform Steering, Service Brake and Parking Brake Operation


T

Checks (as per OMM by Machine Model) T

MOVING THE MACHINE


Ensure Area is Clear
T T

Raise all lowered Impalements


Depress Service Brake Pedal
T T

Release the Parking Brake


T T

Move Transmission Control Lever to desired direction


T T

Release Service Brake Pedal and depress Accelerator Pedal


T T

MACHINE SHUT DOWN


Park the Machine on Smooth, Level Area
T T

Set Parking Brake


Lower all Hydraulic Implements
Run Engine at Low Idle for 5 minutes to allow Engine to Cool
Turn Key Start Switch to OFF and remove Key
T T

Dismount Machine using 3-Point Contact


T T

Block Wheels and remove Disconnect Switch Key if Parking for


Extended Period
Conduct Post-Operation Walk-Around Inspection
T T