Documente Academic
Documente Profesional
Documente Cultură
ImportantExams: IBPSRRB IBPS IBPSPO IBPSClerk SBIPO BankPO RBIAssistant IBPSSO NIACL NICL SSCCGL
SearchHereYourTopicsandKeywords...
IBPSSO2017NotificationOut|Online
HOWMUCHYOUR
ATTEMPTSINUIICASST. RegistrationStartsfrom07thNov WeAreHiring
MAINS2017?
Below140 FreeAllIndiaMock|IBPSRRB
141150 MostImportantQuestionsofTimeandWork POMains2017
151160
161170
forSBIPO
171180
As we all know SBI PO is here and we are ready with the 80 days plan in which we provide
Above180
you daily quizzes on new pattern questions with different topics that will help you to go
Vote Showresults through this exam. GetFlat47%OffonCareer
So, here we are with the Most important questionsof Time and Work. PowerPrintedEditionBooks
Votessofar:2674 forBankandSSCExams
Dayslefttovote:367
SHAREYOUROICLAO
PRELIMS2017EXAM
ATTEMPTS?
Below50
5155
5660
6165
6670
7175
Above75
Vote Showresults
Q1. 12 men complete a work in 18 days. Six days after they had started working, 4
men joined them. How many days will all of them take to complete the remaining
Votessofar:5525 work ?
Dayslefttovote:366 (a) 10 days
(b) 12 days
(c) 15 days
IBPSClerkCombo(Pre+
HOWMUCHDIDYOU (d) 9 days
SCOREINIBPSRRB Mains)2017OnlineTestSeries
CLERKPRELIMS2017? (e) None of these
Lessthan50 Q2. Suresh can finish a piece of work by himself in 42 days. Mahesh, who is 1/5
5155 times more efficient as Suresh, requires X days to finish the work by working all by
5660 himself. Then what is the value of X ?
6165 (a) 25 days
6670 (b) 30 days
Morethan71 (c) 35 days
(d) 20 days
Vote Showresults (e) None of these
Votessofar:7951
Dayslefttovote:27 Q3. Two pipes A and B when working alone can fill a tank in 36 min. and 5 min. IBPSRRBPOMains2017
respectively. A waste pipe C can empty the tank in 30 min. First A and B are OnlineTestSeries
opened. After 7 min., C is also opened. In how much time (in mins) will the tank be
HOWMUCHDIDYOU full ?
SCOREINIBPSRRBPO (a) 60
PRELIMS2017?
(b) 39
LessThan40 (c) 42
4145 (d) 51
4650 (e) None of these
5155
Q4. A and B together can do a piece of work in 12 days which B and C together can
5660
do in 16 days. After A has been working at it for 5 days, and B for 7 days, C takes up
MoreThan61
and finishes it alone in 13 days. In how many days could each do the work by
Vote Showresults himself ? SSCCGL2017TierII&TierIII
(a) 8, 16, 24 OnlineTestSerieswithE
Votessofar:8359
(b) 16, 24, 8 BooksPackage
Dayslefttovote:26
(c) 16, 48, 24
(d) 8, 24, 48
SHAREYOURIBPSPO (e) None of these
PRELIMS2017EXAM
ATTEMPTS.
Below45 Q5. A group of men decided to do a job in 4 days. But since 20 men dropped out
every day, the job completed at the end of the 7th day. How many men were there
4650
at the beginning?
http://www.bankersadda.com/p/mostimportantquestionsoftimeand_24.html 1/6
10/28/2017 MostImportantQuestionsofTimeandWorkforSBIPO
at the beginning?
5155
(a) 240
5660
(b) 140
Above60 (c) 280
Vote Showresults (d) 150
(e) None of these
Votessofar:30503
Dayslefttovote:17
Q6. C is twice efficient as A, B takes thrice as many days as C. A takes 12 days to
finish the work alone. If they work in pairs (i.e., AB, BC, CA) starting with AB on the
first day then BC on the second day and AC on the third and so on, then how many IBPSSpecialCombo2017with
CURRENTAFFAIRS
MONTHLYCAPSULE
days are required to finish the work? VideoSolution
(HINDUREVIEW)
September2017
August2017
July2017
June2017
May2017
April2017
March2017
February2017 Q7. There was a leakage in the container of the refined oil. If 11 kg oil is leaked out
January2017 per day then it would have lasted for 50 days, if the leakage was 15 kg per day,
then it would have lasted for only 45 days. For how many days would the oil have UIICAssistantCombo(Pre+
lasted, if there was no leakage and it was completely used for eating purpose? Mains)2017
IBPSPO2017 (a) 80 days
(b) 72 days
(c) 100 days
BankCoachingin
(d) 120 days
India
(e) None of these
Agra | Aligarh |
Allahabad | Bareilly |
Bikaner | Bhagalpur | Q8. 4 Men and 2 boys can finish a piece of work in 5 days. 3 women and 4 boys can
Chandigarh|Dehradun| finish the same work in 5 days. Also 2 men and 3 women can finish the same work in
DelhiNCR | Durgapur | 5 days. In how many days 1 men, 1 women and 1 boy and finish the work, at their
Gorakhpur Guwahati | double efficiency?
Hisar|Hooghly|Jhansi|
Kanpur | Kolkata |
Lucknow | Ludhiana |
Patna|Varanasi OICLAOGeneralistCombo
(Pre+Mains)2017
POPULARPOSTS(LAST7
DAYS)
SBIPO2017Mains
CutOffandMarksOut:
CheckHere
Q9. It takes 30 hours for an inlet pipe to fill an empty tank completely. When 5
SBIPO2017Final identical inlet pipes and 4 identical outlet pipes operate together, the same empty
ResultOut:Check
Here tank get filled completely in 10 hours. How much time (in hours) will an outlet pipe
take to empty the same tank when its filled upto half its volume?
IBPSSO2017 (a) 15
NotificationOut| (b) 20
OnlineRegistration SSCCGLTierIIMainsCombo
Startsfrom07thNov (c) 24 OnlineTestSeries
(d) 30
OICLAOPrelims (e) None of these
ExamAnalysis&
Review:22ndOct
2017(Shift1) Q10. Water flows at 3 metres per sec through a pipe of radius 4 cm. How many
hours will it take to fill a tank 40 metres long, 30 metres broad and 8 metres deep,
OICLAdministrative if the pipe remains full?
Officers(AO) (a) 176.6 hours
GeneralistsMains
ExamStrategy2017 (b) 120 hour
(c) 135.5 hour
(d) 140 hour
(e) None of these
ADDA... ISROAssistantandUDCOnline
55klikes Q11. A can do a piece of work in 10 days, while B alone can do it in 15 days. They TestSeries
work together for 5 days and the rest of the work is done by C in 2 days. If the get
Rs 450 for the whole work, how should they divide the money?
(a) Rs 225, Rs 150, Rs 75
LikePage (b) Rs 250, Rs 100, Rs 100
(c) Rs 200, Rs 150, Rs 100
(d) Rs 175, Rs 175, Rs 100
(e) None of these
POPULARPOSTS(ALL
TIME) Q12. The work done by a man, a woman and a child is in the ratio of 3 : 2 : 1. There
are 20 men, 30 women and 36 children in a factory. Their weekly wages amount to
SBIPOResult2017|
Rs 780, which is divided in the ratio of work done by the men, women and children.
SBIPOPrelimsResult
Out What will be the wages of 15 men, 21 women and 30 children for 2 weeks? IBPSPOCombo(Pre+Mains)
(a) Rs 585 2017OnlineTestSerieswith
IBPSPOPRELIMS VideoSolutions
(b) Rs 292.5
2016RESULT
DECLARED (c) Rs 1170
(d) Rs 900
SBIClerk2016Pre (e) None of these
Resultout:Download
http://www.bankersadda.com/p/mostimportantquestionsoftimeand_24.html 2/6
10/28/2017 MostImportantQuestionsofTimeandWorkforSBIPO
Resultout:Download
CallLettersforMains
Q13. The Bubna dam has four inlets. Through the first three inlets, the dam can be
IBPSClerkVFinal filled in 12 minutes; through the second, the third and the fourth inlet, it can be
ResultsLInkActive filled in 15 minutes; and through the first and the fourth inlet, in 20 minutes. How
much time will it take all the four inlets to fill up the dam?
IBPSRRBPO2017
(a) 8 min
(OfficerScaleI)
PrelimsResultOut: (b) 10 min
CheckHere (c) 12 min
(d) 14 min
SBIJuniorAssociate (e) None of these IBPSCombo(PO+CLERK)
2016PreMarks
Released 2017withVideoSolution
Q14. 3 small pumps and a large pump are filling a tank. Each of the three small
IBPSRRBNotification pumps works at 2/3 rd the rate of the large pump. If all 4 pumps work at the same
Out|IBPSRRB2017 time, they should fill the tank in what fraction of the time that it would have taken
CWEVIRecruitment
the large pump alone?
IBPSRRBPreAdmit (a) 4/7
Card|IBPSRRBVI (b) 1/3
Pre2017CallLetter (c) 2/3
Out
(d) 3/4
RBIGradeB2017 (e) None of these
Recruitment
Notification,Exam Q15. A pipe can fill a tank in 15 minutes and another one in 10 minutes. A third
Dates:ApplyOnline
pipe can empty the tank in 5 minutes. The first two pipes are kept open for 4
IBPSRRBOffice minutes in the beginning and then the third pipe is also opened. In what time will
AssistantResult2017 the tank be emptied? HighLevelLogicalReasoning
Out:CheckRRBClerk (a) 35 min TestSeries(BasedonLatest
Result Pattern)
(b) 15 min
(c) 20 min
(d) Cannot be determined
(e) None of these
Solution:
SSCCGL2017AllRounder
Package
Adda247eBooksBankAnd
SSCExamPreparation
Books!!!
Plsmailusyoursuccessstory
atcontact@bankersadda.com
BAAchieversGang201617:
JointhefacebookGroupNow
PUZZLESONLINETESTSERIES
PACKAGE
http://www.bankersadda.com/p/mostimportantquestionsoftimeand_24.html 3/6
10/28/2017 MostImportantQuestionsofTimeandWorkforSBIPO
SendyourSSCCHSLTierI
responsesheetat
Contact@bankersadda.com
ClassroomcoachingforIBPS
PO2017@CareerPower(Rs.
500discountformakingOnline
Payments)
SSCCGL2017@Career
Power
SSC2017OnlineTestSeries
CompeteKIT
SSCCGLTIERI2017Online
TestSeries(ByToppers)
QuantitativeAptitudeTopic
WiseTestseries(BasedOn
LatestPattern)
ReasoningTopicWiseTest
series(BasedOnLatest
Pattern)
http://www.bankersadda.com/p/mostimportantquestionsoftimeand_24.html 4/6
10/28/2017 MostImportantQuestionsofTimeandWorkforSBIPO
SECTIONWISECOMBO
PACKAGE(BASEDONLATEST
PATTERN)
Shareyoursuccessstorywith
us.Email(alongwithurpic):
contact@bankersadda.com
BAAchieversGang2016
FacebookGroupJoinNow
COMPETITIONPOWER
CoachingClasses
Ifyouhaveanyfeedbackorwant
toshareanythngwithus,plsmail
usatinfo@bankersadda.com
BankersAddaRulesand
Regulations
BAReaderisMahaCrorepati
GetGKUpdatesinyourEmail:
Enteryouremailaddress:
Subscribe
POPULARPOSTS(LAST30
DAYS)
IBPSRRBPO2017(Officer
YouTube 813K Like ScaleI)PrelimsResultOut:
CheckHere
IBPSRRBOfficeAssistant
Result2017Out:CheckRRB
ClerkResult
IBPSRRBResult2017:RRB
PO(OfficerScaleI)Prelims
ScoreCard&CutoffOut
Home
IBPSPOPrelimsExam
Subscribeto:Posts(Atom) Analysis&Review:7thOct
2017(Shift1)
http://www.bankersadda.com/p/mostimportantquestionsoftimeand_24.html 5/6
10/28/2017 MostImportantQuestionsofTimeandWorkforSBIPO
2017(Shift1)
RBIAssistant2017
NotificationOut|Online
RegistrationStartedfrom18th
Oct
IBPSRRBResult2017:RRB
Clerk(OfficeAssistant)
PrelimsScoreCard&Cutoff
Out
IBPSPOPreMemoryBased
Paper
G.K.PowerCapsuleforIBPS
RRB,UIICAisstant,OICLAO
&OtherBankExams|
AvailableinEnglishandHindi
Language
UIICAssistantPrelimsMarks
Out|CheckUIICAssistant
PrelimsCutOff
GearupforMains|Check
yourUIICAssistantResult
IMPORTANTEXAMS
IBPSPO2017 SBIPO2017 RBIGradeB NIACL2017
IBPSClerk2017 SBIClerk2017 RBIAssistant NICL2017
IBPSRRB2017 SBISO2017 BankPO2017 DenaBankPO
IBPSSO2017 SSCCGL2017 SSCCPO2017 BankClerk
CTET2017 DSSSB2017
BANKCOACHING
BankCoachinginDelhi BankCoachinginChandigarh BankCoachinginDehradun BankCoachinginLucknow
BankCoachinginHyderabad BankCoachinginKolkata BankCoachinginAhmedabad BankCoachinginChennai
BankCoachinginBengaluru BankCoachinginPune
DOWNLOADTHEADDA247APP
http://www.bankersadda.com/p/mostimportantquestionsoftimeand_24.html 6/6