Engineering Design Inc.

Section 7 Action Plan


The action plan for this project is described in the table below.

Objectives Actions Responsibility


Proposal Phase Work as a group to compose Project Team
an effective proposal based Member
on the requirements.
Analyze the machine Thermal
Design Phase invented by Yoshiki Tsuchida Modelling
and search for any Engineer
improvement the analyst
could possibly make.
Project Team Review I 1. Review the budget Project Team
approved by the Member
committee.
2. Review the action plan if
any necessary changes
need to be made.
Productio Assemble the 1. Attach the steel to the Thermal
n Phase main chamber specimen based on the Engineer
of the machine. design.
2. Add thermal paste
between the steel and
the specimen to reduce
thermal contact
resistance.
3. Make the surface of the
specimen really smooth
to avoid air gap when
attaching it to the steel.
Assemble the 1. Assemble a lower heat Thermal
main body of insulator, an upper heat Engineer
the insulation. insulator, and a
cylindrical heat insulator.
2. Install graphite in the
inside surface of the
insulator. Graphite has
high thermal conductivity
allowing the temperature
distribution to be
persistent within main
chamber.
3. Measuring the heat loss
from the main body of
the insulation.
Assemble the 1. Install the main chamber Thermal
main chamber to the main body of the Engineer
and the main insulation.
body of the 2. Add one additional
insulation. cylindrical heat insulator
to make sure no gap

Page | 1
Engineering Design Inc.

between the main


chamber and the main
body insulation.
3. Measure the
temperature of the air
above the main chamber.
Assemble the 1. Install heating system to Electrical
heater to the the machine by using two Engineer
main chamber main electrical terminals.
and the main 2. Measuring heat the
body of the requirement for the
insulation. whole system.
Producing a 1. Request production of Engineers
metal cap for the metal cap to Tempco from Tempco
the machine. Manufacturing Company Inc.
Inc.
2. Re-evaluate the
specification of the metal
cap ensuring that it
meets with our standard.
Create a 1. Create the software using Software
software to Phyton. Engineer
process the
output data
from
thermocouples.
Final Assembly 1. Assemble all components Project Team
into one machine based Member
on the design.
2. Install the thermocouple
to the machine.
3. Connect the machine to
the computerized system.
Feasibility Test and Quality 1. Simulate the actual Project Team
Assurance operating system as Member
closely as possible to
thoroughly examine all
components for
performance, durability,
and reliability.
Project Team Review II 1. Review the real action Project Team
plan, budget, and Member
feasibility test result.
2. Compose the final report
of the project.